Company Overview Presentation COMPANY CONTACT DETAILS Dales - - PDF document
Company Overview Presentation COMPANY CONTACT DETAILS Dales - - PDF document
Company Overview Presentation COMPANY CONTACT DETAILS Dales Engineering Services Limited Offshore & Renewable Division Dales Industrial Estate How Moss Drive Peterhead Kirkhill Industrial Estate Aberdeenshire, Scotland Aberdeen,
Dales Engineering Services Limited Offshore & Renewable Division Dales Industrial Estate How Moss Drive Peterhead Kirkhill Industrial Estate Aberdeenshire, Scotland Aberdeen, Scotland AB42 3JF AB21 OGL Tel : +44 (0)1779 478778 Tel: + 44 (0) 1779 478778 Fax : +44 (0)1779 471846 Fax : +44 (0)1779 471846 Email : <contact>@dalesengineering.co.uk Email : <contact>@dalesengineering.co.uk WEB : www.dalesengineering.co.uk WEB : www.dalesengineering.co.uk
COMPANY CONTACT DETAILS
WHO ARE WE?
- 1987 Founded to provide a service to the fleet of Oil & Gas support vessels sailing from Peterhead. Quickly
established foothold in fabrication market, onshore & offshore, gaining a reputation for rapid response & on time delivery.
- 1992 Set up a marine division in Aberdeen, to provide a service to the fleet of Oil & Gas support vessels sailing from
Aberdeen.
- 1998 Brought under the umbrella of Dales Group of companies.
- 2002 Management buyout from Dales Group by the current owners, William Duncan & Graham Mackie.
- 2004 Acquisition of Enterprise Engineering Services Ltd Aberdeen.
- 2009 Kevin Thomson & Charles Lawson join Board of Directors.
- 2010 Became a stakeholder in Peterhead Decommissioning Limited.
- 2010 Sale of Aberdeen facility (EESL)
- 2012 Completed construction of purpose built offices.
- 2013 Completed development of site with new workshop, canteen and works office, and laid entire site with concrete.
- 2016 Established the Offshore & Renewable division to supply customers with a turnkey service from Design /
Feasibility studies through the fabrication & Installation and commissioning as required. Servicing all the Energy sectors both onshore & offshore worldwide.
WHERE ARE WE?
- Main facilities are sited within Dales Industrial Estate, on the southern
approaches to Peterhead. This is 30miles north from Aberdeen.
- Conveniently situated a mile from the deep water port facilities of
Peterhead Harbours and ASCo North & South Service Bases.
- Offices based in Aberdeen to ensure that our Offshore and Renewable
customers have the immediate response and support that is required in todays market place.
WHERE ARE WE?
WHERE ARE WE?
WHAT DO WE DO?
- Design / Feasibility Studies - With experienced and qualified project engineers & with our alliance
partners we can deliver the full design suite within all the energy sectors.
- Structural Fabrication - Fabrication and assembly of carbon steel, stainless steel, aluminium and
alloys from nuts & bolts to 200Te structures.
- Pipework Fabrication - Fabrication and assembly of carbon steel, stainless steel, duplex, super
duplex steels, 6%Mo and cunifer, carrying an extensive WPQR data base to cover all types of piping scopes.
- Machining / Mechanical - Machining and assembly of all steel types, plastics and nylon, using full
CNC, part CNC & manual lathes, millers, borers, drills and saws, Onsite mechanical support with qualified and experienced mechanical personnel.
- Onsite / Offshore - Supply of experienced and qualified manpower, equipment and materials to
ensure a professional installation within the following: vessels, offshore installations, onshore oil & gas plants, process factories, wind farms and hydro & thermal power generation stations.
- Commissioning / Training – Assisting the customer with their needs to commission plant or
equipment to the industry regulations, Providing the operative with the knowledge to ensure that maintenance and operation is achieved in an efficient and safe manner.
HSEQ CREDENTIALS
- Accredited to ISO 9001 : 2008 – Certificate No FM13632.
- Integrated Management System policies & procedures developed in accordance with
ISO 9001 : 2008, ISO 18001 & ISO 14001.
- Member of British Safety Council.
- Registered FPAL supplier with “Verify” assessment carried out Feb 2009, 2011, 2012 &
2014 – Supplier No 10042569.
- Registered UVDB supplier with “Verify” assessment will be carried out Sept 2016 –
Supplier No 206780.
- Certified by DNV to fabricate equipment under the Pressure Equipment Regulations to
Modules D / D1 – Certificate Nos 06-ABD-PED-0008-D & 06-ABD-PED-0008-D1.
- 550+ welding procedures qualified in accordance with AWS D1.1, BS4515 Pt 1& Pt 2,
ISO 15614, API 1104, EN 288 Pt 3 & Pt 9, EEMUA 158, ASME IX, DNV OS F-101 and ISO 19902.
FACILITIES / CAPABILITIES
Sitting on a site extending to over 4.5 acres, Dales Engineering Services Ltd can offer clients a “one stop shop” approach to fabrication / engineering solutions. 12,578 Ft2 Main Fabrication Workshop 2,734 Ft2 Exotic Materials Workshop 3,799 Ft2 Machining Workshop 7,875 Ft2 Covered Storage Warehouse 2,131 Ft2 Joinery Workshop 10,333Ft2 New Structural & Piping Workshop 8,072Ft2 Piping & Storage Workshop
FACILITIES / CAPABILITIES
- June 2011 saw the completion of a new purpose
built office suite.
- On two levels, the spacious offices accommodate
the Engineering, Drawing, Purchasing, and Accounts departments, with scope for future expansion.
MAIN OFFICE ABERDEEN OFFICE
- June 2016 saw the establishment of Aberdeen
based Offshore & Renewable divisional offices.
- On two levels, the spacious offices accommodate
the Offshore and Onshore engineering and management teams to ensure that our customers have the local support required for their project needs, with scope for future expansion.
FACILITIES / CAPABILITIES
- 21.4m wide x 54.6m long x 6m under crane.
- 2No 10Te Overhead Gantry Cranes with 18Te
tandem lift.
- ESAB CNC gas cutting plate profile system with 5m
x 3m plate bed.
- SERTOM plate rolls capable of rolling 3m wide
plates.
- SMAW, GTAW, GSFCAW, SAW, GMAW welding
processes.
MAIN FABRICATION WORKSHOP NEW STRUCTURAL AND PIPING WORKSHOP
- 20m wide x 48m long x 7m under crane.
- 2No 15Te Overhead Gantry Cranes with 30Te tandem lift.
- SMAW, GTAW, GSFCAW, SAW, GSMAW welding processes.
FACILITIES / CAPABILITIES
- 10.6m wide x 24m long x 4.8m high.
- SMAW, GTAW, SAW, GMAW welding processes.
- MILLHOGG pipe bevelling machine
EXOTIC MATERIAL WORKSHOP MACHINING WORKSHOP
- 14.7m wide x 24m long x 6m under crane.
- 5Te overhead gantry crane.
- CNC, part CNC and manual lathes, millers,
horizontal & vertical borers and radial drills.
FACILITIES / CAPABILITIES
- 15M Wide x 50m Long.
- GTAW, SMAW, GSFCAW, GSMAW welding
processes.
- Secure covered storage for high value items such
as flanges, fittings & valves.
PIPING FABRICATION & STORAGE STORAGE WAREHOUSE
- 24.8m wide x 29.5m long.
- Secure covered storage for high value items such
as flanges, fittings & valves.
FACILITIES / CAPABILITIES
- Over 3 Acres of concreted secure storage &
assembly space.
- Serviced by 2No 8Te & 1No 5Te forklift trucks.
- Mobile cranes on sub contract basis.
- Ideal for assembly, testing & commissioning of
large scale fabrications, prior to delivery.
OPEN STORAGE AREA
PREVIOUS EXPERIENCE
- Over the last 25 years, Dales Engineering Services Ltd have had the privilege
- f providing a service for most of the major players in the Oil & Gas along with
- ther Renewable energy providers & Utilities companies.
- ACERGY
TALISMAN BP
- SHELL
SUBSEA 7 TECHNIP
- AKER SOLUTIONS
MARATHON AGIP
- SAIPEM
MAERSK TOTAL
- WOOD GROUP
EXXON MOBIL PSN
- SSE
PETROFAC TAQA
- TECHNIP NORGE AS
SCOTTISH POWER APACHE
- NOBLE DRILLING
TRANSOCEAN RWE
- RIO TINTO
HELIX WELL OP’s LUNAR
- STAR REFRIGERATION
KELDA WATER
PREVIOUS EXPERIENCE
- Date : 2004
- Client : SUBSEA 7
- Project : MCP01 BYPASS
- Workscope : Complete build, test and delivery to
vessel of Valve Skid & Tie in Spools.
150Te VALVE SKID STRUCTURE HALFDAN DC VALVE STATION
- Date : 2006
- Client : MAERSK
- Project : HALFDAN DC VALVE STATION
- Workscope : Complete build, test and delivery to
vessel of Valve Station & Tie in Spools.
PREVIOUS EXPERIENCE
- Date : 2007
- Client : SAIPEM
- Project : MAERSK HALF DAN
- Workscope : Complete build, test and delivery to
vessel of 42” Riser Caisson & Hang off Clamps.
65 METRE 42” RISER CAISSON 12Te SHEARS SUPPORT FRAME
- Date : 2007
- Client : MATRIX ENG
- Project : FRIGG DECOMISSIONING
- Workscope : Milling of connection plates on 12Te
Shears Support Frame using horizontal borer.
PREVIOUS EXPERIENCE
- Date : 2009
- Client : SUBSEA 7
- Project : CHANNON BARBAROSSA
- Workscope : Complete build, test and delivery to
vessel of Valve Skid and Tie in Spools.
CHANNON BARBAROSSA VALVE SKID 12m X 14m SUBSEA CONTROL MANIFOLD
- Date : 2011
- Client : SUBSEA 7
- Project : NEXEN BLACKBIRD
- Workscope : Complete build, outfitting, test and
delivery to vessel of Subsea Control Manifold and Tie- in Spools.
- Date : 2011
- Client : PDi
- Project : WELLSTREAM WAIMEA FIELD DEVELOPMENT
- Workscope : Complete build and installation onto vessel
- f Horizontal Lay System and ancillary equipment.
PREVIOUS EXPERIENCE
HORIZONTAL PIPE LAY SYSTEM SUBSEA TIE IN SPOOLS
- Date : 2012 - 2013
- Client : TECHNIP NORGE AS
- Project : ALVHEIM PHASE 2C SUBSEA TIE IN
- Workscope : Fabricate, coat and test 12”, 6”, 4” & 2”
diameter 25% Cr Duplex tie in spools.
- Date : 2014
- Client : TECHNIP NORGE AS
- Project : HEJRE OVER GORM
- Workscope : Fabricate, coat and test 24” diameter 52m
long Riser Caisson c/w Clamps and Boat Fender.
PREVIOUS EXPERIENCE
52 METRE 24” RISER CAISSON HORIZONTAL PIPE LAY SYSTEM
- Date : 2014
- Client : PDi
- Project : BIBBY OFFSHORE 75Te HLS
- Workscope : Complete build and installation onto
vessel of Horizontal Lay System and ancillary equipment.
- Date : 2015 - 2016
- Client : TECHNIP NORGE AS
- Project : ALVHEIM IOR SUBSEA WELL TIE IN
- Workscope : Fabricate, coat and test 2”, 4”, 6” and
12” diameter 22% Cr Duplex tie in spools and strongbacks
PREVIOUS EXPERIENCE
SUBSEA TIE IN SPOOLS 15m X 12m 140Te GAS EXPORT PLEM STRUCTURE
- Date : 2015
- Client : SUBSEA 7
- Project : PREMIER OIL CATCHER FIELD DEVELOPMENT
- Workscope : Complete build, coat, outfit and test Gas
Export PLEM structure c/w 10” diameter tie in spools
PREVIOUS EXPERIENCE
- Date : 2016
- Client : WGPSN / SHELL UK
- Project : Welding support for Brent Charlie
- Workscope : Supply qualified welders, Certified
Plant & Consumables to support the Brent Charlie Dead Weight scope.
OFFSHORE WELDING SUPPORT
- Date : 2016
- Client : HELIX WELL OPERATIONS
- Project : Vessel Repairs & Maintenance
- Workscope : Assist with various maintenance and
repair scopes, from Mechanical to construction ensuring that all works are completed within the classification requirements.
VESSEL REPAIR & MAINTENANCE SUPPORT
PREVIOUS EXPERIENCE
- Date : 2016
- Client : STAR REFIGERATION
- Project : Various Onsite Installations
- Workscope : Mechanical piping support for various
- nsite piping installations ensuring that all scopes
are to the BS EN and EU regulations and specifications and standards
- Date : 2016
- Client : KELDA (YORKSHIRE) WATER
- Project : Onsite / Offsite Mechanical & Machining
support.
- Workscope : Supplying COMPEX 10 qualified
mechanical persons to assist with plant maintenance, Supporting with facilities so that offsite machining and mechanical operations can be completed offline with minimal disruption to daily running of plant.
ONSITE PIPING INSTALLATION ONSITE MECHANICAL SUPPORT
PREVIOUS EXPERIENCE
- Date : 2016
- Client : SCOTTISH & SOUTHERN ENERGY
- Project : Pitlochry South Drum Gate Refurbishment
- Workscope : Design and Install 157ton Support Frame
- Undertake refurbishment of Strutting System.
- Date : 2016
- Client : SCOTTISH & SOUTHERN ENERGY
- Project : Lochay intake screens and gantry
replacement scopes
- Workscope : Design, Manufacture and Install new
Intake Structure and Screen Cleaner.
DRUM GATE REFURBISHMENT LOCHAY INTAKE SCREEN & GANTRY REPLACEMENT
PREVIOUS EXPERIENCE
- Date : 2016
- Client : WGPSN / SHELL UK
- Project : Labour support for St Fergus Gas
Terminal
- Workscope : Labour support to ensure that the
sites welding requirements were resourced accordingly with qualified and trained personnel
- Date : 2016
- Client : RWE Innogy UK Ltd
- Project : Design for Stanley Mills intake
- Workscope : Complete design package for new
hydro scheme intake structure