Formby High School Community Sports Facility Development (3G pitch) The New Ofsted Inspection Framework and Being Ofsted Ready Pur about the proposed 3G pitch application the submission of the planning raise concerns to be considered prior


slide-1
SLIDE 1

The New Ofsted Inspection Framework and Being Ofsted Ready

Formby High School

Community Sports Facility Development (3G pitch)

slide-2
SLIDE 2

Pur urpose pose of

  • f th

the e Me Meet eting ing

  • To share information with neighbours

about the proposed 3G pitch development and how its impact on the local community will be managed

  • To provide residents with an opportunity

to ask questions, seek clarification and raise concerns to be considered prior to the submission of the planning application

Formby High School

slide-3
SLIDE 3

Par artner tner Or Orga ganisa nisations tions

  • Formby High School
  • Formby Parish Council
  • Sefton Council
  • Football Foundation
  • Liverpool County Football Association
slide-4
SLIDE 4

Location cation

Formby High School 36m

slide-5
SLIDE 5

Fl Floodl

  • dligh

ights ts and nd Ri Risk of k of Li Ligh ght Pol t Pollution ution

Formby High School

Full light survey conducted with report being submitted with the planning application

slide-6
SLIDE 6

Fl Floodl

  • dligh

ights ts and nd Ri Risk k of Li Ligh ght t Po Pollutio tion n (cont nt)

  • Two key concerns:

– Light Spilla lage: e: there will be no light spillage into surrounding gardens / height of pylons (15 metres) will enable lights to be directed downwards / advanced technology – Glare: : minimised to due the height of pylons and downward direction of lights

Phillips Optivision MVP507 Formby High School

slide-7
SLIDE 7

Ri Risk k of No Noise e Po Pollution ution

slide-8
SLIDE 8

Ri Risk sk of

  • f Nois
  • ise

e Pol

  • llution

lution

  • Acoustic barrier to south

and partially east and west of 3G pitch

  • Noise Management Plan

– Outline school’s position

  • n swearing / ASB

– Dismissal from pitch / future ban – Reporting process – Complaints procedure / log – Use of neoprene isolators

Formby High School Acoustic Barrier (3 metres)

slide-9
SLIDE 9

Op Oper erating ating Ho Hours urs

  • Monday – Friday: 5pm to 9.30pm
  • Saturday: 10am to 6pm
  • Sunday: 10am to 1pm
  • Bank Holidays: Closed

Formby High School

slide-10
SLIDE 10

Co Communi mmunity ty Us User er Gro roups ups

  • Partner

ner foo

  • otba

tball ll clubs ubs – Redgate Rovers FC, Altown United JFC

  • Other local football clubs (with

Formby teams given priority)

  • Schools

hools – access upon request on a free of charge basis

  • Foc
  • cus

us gr grou

  • ups

ps – elderly and adults with learning difficulties

Formby High School

slide-11
SLIDE 11

Man anag aging ing Be Behav aviour iour

  • Signage regarding behaviour

expectations

  • Lettings only to recognised and

established clubs / organisations

  • Club policies – player, spectator and

coaches codes of conduct

  • Agreement (contract of hire) will outline

behaviour expectations and consequences if not met

Formby High School

slide-12
SLIDE 12

Par arkin king

  • Promotion of alternative methods of transport:

walking, cycling, bus and train

  • Bike sheds to be made accessible to encourage

cycling

  • Usage projections indicate maximum of

between 60 and 72 users each hour

  • Parking for +120 vehicles on the campus
  • Front field: overflow car park
  • Currently, up to 30 vehicles on site during the

evening as a result of lettings

Formby High School

slide-13
SLIDE 13

Par arkin king g (cont

  • nt)
  • Parking on the school campus will be a

condition of use contained in the agreement (contract of hire)

  • School Events:

– Open Evening (September) and Sixth Form Open Evening (November) – no lettings – Parent Teacher Consultation Evenings (seven) and Parents Information Evenings (six) – car park attendants / overspill car park

Formby High School

slide-14
SLIDE 14

Le Lett tting ngs and nd Inc ncome e Ge Gene nerat ration ion

  • Pricing structure to be determined by Liverpool

County FA

  • Local clubs afforded more favourable rate for

long term commitment

  • FHS will manage all lettings and retain lettings

income

  • Accountable to FA for income and expenditure
  • £25,000 annual sinking fund
  • In long term, approximately £5,000 projected

profit per annum that will be reinvested in improving the school’s community facilities

  • Offered to other schools on a FOC basis

Formby High School

slide-15
SLIDE 15

Si Site te Ac Access cess

  • Freshfield Road vehicle and

pedestrian entrances only

  • Long Lane and St George’s Road

pedestrian entrances will remain locked (unless required for disability access)

  • Subject to available funds – Long

Lane boundary fence to be upgraded

Formby High School

slide-16
SLIDE 16

Hea ealt lth Co h Conce ncern rns Football Association Position Statement

Formby High School

slide-17
SLIDE 17

Emergency ergency Ac Access ess

  • Emergency vehicle access is via the

Freshfield Road entrance and road around the north side of the school campus

  • The 3G pitch will have wide gates to

accommodate an ambulance

Formby High School