Community Board 4 Meatpacking BID Bayard Rustin Educational Campus - - PowerPoint PPT Presentation

community board 4 meatpacking bid
SMART_READER_LITE
LIVE PREVIEW

Community Board 4 Meatpacking BID Bayard Rustin Educational Campus - - PowerPoint PPT Presentation

Replacement of Water Mains in the Borough of Manhattan Project ID: MED642 Community Board 4 Meatpacking BID Bayard Rustin Educational Campus 351 W 18 th Street January 31, 2018 Project Data Project ID: MED642 Bid Date: October 5, 2016


slide-1
SLIDE 1

Replacement of Water Mains in the Borough of Manhattan Project ID: MED642 Community Board 4 – Meatpacking BID Bayard Rustin Educational Campus 351 W 18th Street January 31, 2018

slide-2
SLIDE 2

Project Data

Project ID: MED642 Bid Date: October 5, 2016 Registered Date: March 31, 2017 Notice To Proceed: October 02, 2017 Contractor: J R Cruz Corporation Contract Value: $3,995,599.99 Contract Duration: 545 CCD, 18 months Field Office: 336 West 37th Street –Room 560

slide-3
SLIDE 3

Brief Description of the Project

  • Installation of new 8”, 12” and 20” water mains with

fittings

  • Replace existing fire hydrants on cast Iron Main/DI

Main

  • Install New Fire Hydrants
  • Replace Existing Gate Valves
  • Install New Gate Valves
slide-4
SLIDE 4

Preliminary Schedule: Work Hours

City DOT Allowable Work Hours at this time

  • 7AM -6PM Monday – Friday on Streets
  • 7AM-3PM Monday –Friday on Avenues
  • 9PM-5AM Monday - Friday for Water Shutdowns
  • There is no noisy operations allowed after 10PM
  • Weekend hours are 8AM-4PM
slide-5
SLIDE 5

PROJECT LIMITS for Community Board 4 Meatpacking District

slide-6
SLIDE 6

PROJECT LIMITS for Community Board 3 Lower East Side

slide-7
SLIDE 7

Start of Work

Work began on Monday, December 11, 2017

slide-8
SLIDE 8

WATER MAIN WORK

12” Water Main

12” Water Main 12” Water Main 12” Water Main 12” Water Main

slide-9
SLIDE 9

Pro roject t Location tion-Photo tos s of f Existing sting Are Area

9

ON W 15TH STREET BETWEEN 8TH AVENUE AND 9TH AVENUE

slide-10
SLIDE 10

Pro roject t Location tion – Photo tos s of f Existing sting Are Area

10

ON W 16TH STREET BETWEEN 8TH AVENUE AND 9TH AVENUE

slide-11
SLIDE 11

Pro roject t Location tion – Photo tos s of f Existing sting Are Area

11

ON W 17TH STREET BETWEEN 8TH AVENUE AND 9TH AVENUE

slide-12
SLIDE 12

Second Pro roject t Location tion – Photo tos s of f Existing sting Are Area

12

ON W 18TH STREET BETWEEN 8TH AVENUE AND 9TH AVENUE

slide-13
SLIDE 13

Second Pro roject t Location tion – Photo tos s of f Existing sting Are Area

13

ON 9TH AVENUE BETWEEN W 16TH STREET AND W 18TH STREET

slide-14
SLIDE 14

COMMUNITY IMPACTS & WHAT TO EXPECT

slide-15
SLIDE 15

COMMUNITY IMPACTS

  • Pedestrian access will be maintained at all times
  • Temporary Street closures and / or limited access may be necessary
  • Flaggers will be assigned for traffic control & for Pedestrian movement
  • Sidewalk and/or loading dock access from the curb may be temporarily restricted while

work is conducted (coordination will be arranged on a case by case basis)

  • Parking may be temporarily restricted during construction
  • Express, private and local bus stops may be temporarily relocated
  • Garbage/Trash pick up may be affected
slide-16
SLIDE 16

COMMUNITY IMPACTS CONT’D

Water Service Interruptions:

  • 72-Hour Advance Advisory will be provided, followed by 24 hour

confirmation/cancellation notice.

  • Specific instruction will be provided prior to water shutoff
  • If your water service is not restored within 3 hours of the indicated time on the Shutoff

Notice, please contact the Community Construction Liaison (CCL) or 311 if after hours.

  • Water Shut-downs are typically scheduled at night.
  • There no scheduled Weekend at this time.

Special Needs: The DDC staff will work specifically with individuals that have special needs who may be uniquely impacted by the project. Please reach out to the project contact.

slide-17
SLIDE 17

Quarterly Newsletter

slide-18
SLIDE 18

Weekly Look Ahead

slide-19
SLIDE 19

Community Advisory

slide-20
SLIDE 20

KEEPING YOU INFORMED

Eliana Perez-Gaviria will be Community Construction Liaison (CCL). Ms. Perez-Gaviria will be responsible for keeping the community engaged & informed by: – Being the first point of contact (Outreach, Communication) – Identifying & Coordinating (Attempt to mitigate construction impacts) – Providing regular updates in advance (Stakeholders may better plan) CCL contact information: Name: Eliana Perez-Gaviria Email: distribwatermainccl@gmail.com Field Office: 336 West 37th Street, Suite 560 Telephone : (212) 564-9643 DDC Website: www.nyc.gov/ddc DDC Video: www.nyc.gov/webuild During Non-Working hours, please call 311 and give the Project ID: MED642

slide-21
SLIDE 21

Thank you

We appreciate your cooperation and thank you for your patience while we rebuild NYC’s infrastructure.