community board 4 meatpacking bid
play

Community Board 4 Meatpacking BID Bayard Rustin Educational Campus - PowerPoint PPT Presentation

Replacement of Water Mains in the Borough of Manhattan Project ID: MED642 Community Board 4 Meatpacking BID Bayard Rustin Educational Campus 351 W 18 th Street January 31, 2018 Project Data Project ID: MED642 Bid Date: October 5, 2016


  1. Replacement of Water Mains in the Borough of Manhattan Project ID: MED642 Community Board 4 – Meatpacking BID Bayard Rustin Educational Campus 351 W 18 th Street January 31, 2018

  2. Project Data Project ID: MED642 Bid Date: October 5, 2016 Registered Date: March 31, 2017 Notice To Proceed: October 02, 2017 Contractor: J R Cruz Corporation Contract Value: $3,995,599.99 Contract Duration: 545 CCD, 18 months 336 West 37th Street – Room 560 Field Office:

  3. Brief Description of the Project • Installation of new 8”, 12” and 20” water mains with fittings • Replace existing fire hydrants on cast Iron Main/DI Main • Install New Fire Hydrants • Replace Existing Gate Valves • Install New Gate Valves

  4. Preliminary Schedule: Work Hours City DOT Allowable Work Hours at this time • 7AM -6PM Monday – Friday on Streets • 7AM-3PM Monday – Friday on Avenues • 9PM-5AM Monday - Friday for Water Shutdowns • There is no noisy operations allowed after 10PM • Weekend hours are 8AM-4PM

  5. PROJECT LIMITS for Community Board 4 Meatpacking District

  6. PROJECT LIMITS for Community Board 3 Lower East Side

  7. Start of Work Work began on Monday, December 11, 2017

  8. WATER MAIN WORK 12” Water 12” Water Main Main 12” Water Main 12” Water Main 12” Water Main

  9. ON W 15 TH STREET BETWEEN 8 TH AVENUE AND 9 TH AVENUE Pro roject t Location tion-Photo tos s of f Existing sting Are Area 9

  10. ON W 16 TH STREET BETWEEN 8 TH AVENUE AND 9 TH AVENUE Pro roject t Location tion – Photo tos s of f Existing sting Are Area 10

  11. ON W 17 TH STREET BETWEEN 8 TH AVENUE AND 9 TH AVENUE Pro roject t Location tion – Photo tos s of f Existing sting Are Area 11

  12. ON W 18 TH STREET BETWEEN 8 TH AVENUE AND 9 TH AVENUE Second Pro roject t Location tion – Photo tos s of f Existing sting Are Area 12

  13. ON 9 TH AVENUE BETWEEN W 16 TH STREET AND W 18 TH STREET Second Pro roject t Location tion – Photo tos s of f Existing sting Are Area 13

  14. COMMUNITY IMPACTS & WHAT TO EXPECT

  15. COMMUNITY IMPACTS • Pedestrian access will be maintained at all times • Temporary Street closures and / or limited access may be necessary • Flaggers will be assigned for traffic control & for Pedestrian movement • Sidewalk and/or loading dock access from the curb may be temporarily restricted while work is conducted (coordination will be arranged on a case by case basis) • Parking may be temporarily restricted during construction • Express, private and local bus stops may be temporarily relocated • Garbage/Trash pick up may be affected

  16. COMMUNITY IMPACTS CONT’D Water Service Interruptions: • 72-Hour Advance Advisory will be provided, followed by 24 hour confirmation/cancellation notice. • Specific instruction will be provided prior to water shutoff • If your water service is not restored within 3 hours of the indicated time on the Shutoff Notice, please contact the Community Construction Liaison (CCL) or 311 if after hours. • Water Shut-downs are typically scheduled at night. • There no scheduled Weekend at this time. Special Needs: The DDC staff will work specifically with individuals that have special needs who may be uniquely impacted by the project. Please reach out to the project contact.

  17. Quarterly Newsletter

  18. Weekly Look Ahead

  19. Community Advisory

  20. KEEPING YOU INFORMED Eliana Perez-Gaviria will be Community Construction Liaison (CCL). Ms. Perez-Gaviria will be responsible for keeping the community engaged & informed by: – Being the first point of contact (Outreach, Communication) – Identifying & Coordinating (Attempt to mitigate construction impacts) – Providing regular updates in advance (Stakeholders may better plan) CCL contact information: Name: Eliana Perez-Gaviria Email: distribwatermainccl@gmail.com 336 West 37 th Street, Suite 560 Field Office: Telephone : (212) 564-9643 DDC Website: www.nyc.gov/ddc DDC Video: www.nyc.gov/webuild During Non-Working hours, please call 311 and give the Project ID: MED642

  21. Thank you We appreciate your cooperation and thank you for your patience while we rebuild NYC’s infrastructure.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend