combined linwood eastern interchange and us 50 red bank
play

Combined Linwood/Eastern Interchange and US 50/Red Bank Interchange - PowerPoint PPT Presentation

Segments II and III Combined Linwood/Eastern Interchange and US 50/Red Bank Interchange Advisory Committee Meeting R. G. Cribbet Recreation Center February 14, 2018 1:00 p.m. to 3:00 p.m. Red Bank to I-275/SR 32 (Segments II and III)


  1. Segments II and III Combined Linwood/Eastern Interchange and US 50/Red Bank Interchange Advisory Committee Meeting R. G. Cribbet Recreation Center February 14, 2018 1:00 p.m. to 3:00 p.m. Red Bank to I-275/SR 32 (Segments II and III) www.EasternCorridor.org

  2. Eastern Corridor Program Overview www.EasternCorridor.org

  3. Eastern Corridor Segments II and III Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  4. Segments II and III Focus Areas Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  5. Tasks Performed To Date • Public Involvement • Technical Studies – Eastern Corridor Development Team – Traffic count update (2015 or newer) meeting – Crash data review – Focus Area Workshops – Evaluation of major intersections, (approx. 100 participants) roadway movements and ramp – Regional online survey junction operations (approx. 1200 participants) – Travel time studies – Public meeting (approx. 100 – Travel pattern analysis attendees) – Roadway geometry assessment – Information posted on Eastern (curves, elevation, sightlines) Corridor website Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  6. Advisory Committee Role Help guide the development and Share updates with your community/ • • refinement of transportation solutions organization and project implementation strategies • Assist with public engagement efforts, Represent your community/organization as appropriate (share information • in Advisory Committee discussions about upcoming public meetings, etc.) Advisory Committee Advisory Committee Advisory Committee Advisory Committee Public Meeting Meeting 1 Meeting 2 Meeting 3 Meeting 4 Develop/Review Refine and Narrow Refine Finalize Preliminary Concepts Preliminary Concepts Solutions Implementation Plan Spring 2018 Summer 2018 Fall 2018 Winter 2018 We ¡are ¡here Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  7. Today’s Objectives • Review transportation needs identified for the Combined Linwood/Eastern and US 50/Red Bank Focus Area • Identify criteria by which solutions can be evaluated • Brainstorm preliminary concepts/solutions to be explored Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  8. Ohio “Home Rule” Transportation Roles ODOT Municipalities Interstates U.S. ¡& ¡State ¡Routes ¡ including ¡designated ¡U.S. ¡& ¡State ¡Routes (outside ¡municipalities) (inside ¡municipalities) Counties ¡/ ¡Townships Ohio ¡Turnpike Infrastructure ¡Commission Local ¡Routes ¡ Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  9. Project Development Process Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  10. Funding Options • Highway Safety Improvement (HSIP) • Safe Routes to School (SRTS) • Major New (TRAC) Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡(Segments ¡II ¡and ¡III) www.EasternCorridor.org

  11. Work Session: Concept Discussion www.EasternCorridor.org

  12. R e d Erie Ave. B a n k R d O b s e r v a t o . r y A v e . Cincinnati Columbia Pkwy. . d R r Cincinnati e t s o o W Little Miami River US 50/Eastern Avenue Interchange . e Address lack of/limited wayfinding to v A improve regional connectivity l e Cincinnati h c s r e H Delta Ave. Cincinnati Wooster Road: Beechmont Circle to Red Bank Road • Address bicycle connectivity (designated US Bike Route 21) Linwood Ave. • Support access to future transit connections Eastern Avenue: SR 125 to US 50 Address bicycle and pedestrian connectivity across railroad SR 125/US 50 Interchange tracks to existing Armleder and Lunken bike paths Eastern Ave. • Address lack of connectivity from SR 125 to eastbound US 50 and from westbound US 50 to SR 125 • Address deficient roadway curves on SR 125 and interchange ramps • Address deficient roadway grade on SR 125 and on US 50 • Address deficient sight distance at the eastbound US 50 exit ramp intersection with SR 125 Beechmont Circle • Address deficient weave on the eastbound US 50 exit ramp to SR 125 tbound US 50 exit ramp to SR 125 tbound US 50 exit ramp to SR 125 i r R • Address localized connectivity travel patterns within Beechmont Circle • Address lack of/limited wayfinding to improve regional connectivity to improve regional connectivity to improve regional connectivity • Address pedestrian safety issues crossing SR 125 at bus stops • Address lack of/limited wayfinding to improve regional connectivity • Address roadway curve and grade deficiencies Beechmont Ave. SR 125: US 50 to Beechmont Circle • Address deficient roadway grade east of viaduct Anderson Twp. • Address physical connectivity between SR 125/US Cincinnati 50 interchange and Beechmont Avenue . e N v A LEGEND r Identified Primary Need: Will Be Addressed By Project e m Identified Secondary Need: May Be Addressed By Project l i W Transportation Needs: Linwood/Eastern Interchange Focus Area

  13. LEGEND Belmont Ave. Identified Primary Need: Will Be Addressed By Project . d Identified Secondary Need: May Be Addressed By Project R k n a Fairfax B d e R Cincinnati US 50: Red Bank Interchange to Meadowlark Lane Watterson Rd. • Address safety issues related to end of freeway section Fair Ln. • Address eastbound PM peak-hour delays . k P r e t s o Southern Ave. o W Meadowlark Ln. US 50/Red Bank Road Interchange ad Interchange ad Interchange • Address localized connectivity patterns nectivity patterns nectivity patterns within the interchange ge ge • Address lack of/limited wayfinding ed wayfinding ed wayfinding to improve regional connectivity connectivity connectivity US 50/Wooster Pike/Meadowlark Lane Intersection Address eastbound PM peak-hour queues US 50 Ramps/Red Bank Road Intersection • Address capacity issues and long queues on northbound and westbound approaches Mariemont • Address lack of and limited wayfinding to Wooster Pk. improve regional connectivity Mariemont Ave. Wooster Pike: Red Bank Road to US 50 • Address deficient roadway grade just east of the Red Bank Road/Wooster Road intersection • Support access to future transit connections Red Bank Rd. Cincinnati Red Bank Road: Wooster Road to US 50 Ramps Little Miami River Address deficient roadway grade just east of Red Bank Road/Wooster Road/Wooster Pike Intersection Red Bank Road/Wooster Road intersection • Address capacity issue for northbound left-turn movement • Address sight distance within intersection Columbia Pkwy. • Address deficient roadway grade Wooster Rd. Anderson Twp. N Transportation Needs: US 50/Red Bank Road Interchange Focus Area

  14. www.EasternCorridor.org EasternCorridor@EasternCorridor.org Segments ¡II ¡and ¡III: ¡Red ¡Bank ¡to ¡I-­‑275/SR ¡32 ¡ www.EasternCorridor.org

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend