collaboration with industry in the future upgrades of
play

Collaboration with industry in the future upgrades of computing - PowerPoint PPT Presentation

Collaboration with industry in the future upgrades of computing infrastructure and services at CERN Eric Bonfillou IT Department Computing Facilities Group Fatima Najeh IPT Department - Procurement and Industrial Services Group Agenda


  1. Collaboration with industry in the future upgrades of computing infrastructure and services at CERN Eric Bonfillou IT Department – Computing Facilities Group Fatima Najeh IPT Department - Procurement and Industrial Services Group

  2. Agenda Overview of CERN IT data centers LHC Schedule Procurement Market surveys Tendering cycle Upgrades of computing infrastructure Upcoming tenders Technical configurations Conclusion Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 2 services at CERN

  3. Overview of CERN IT data centers (1) IT department operates two data centers, one in Meyrin (Switzerland) and one in Wigner (Hungary) The two sites are connected together via three redundant 100GbE links Computing equipment is homogeneous between the two sites Wigner can be considered as an extension of the Meyrin site, also allowing to ensure business continuity Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 3 services at CERN

  4. Overview of CERN IT data centers (2) • CERN Meyrin • 3.8 MW • 11000 servers, 1600 JBODs • Wigner, Budapest Co-loc contract  ends 31/12/2019 • • 2.5MW • 4000 servers, 900 JBODs • Combined • 15,000 servers • Openstack ~280 kcores • Storage: • Disk Buffer 330PB • Tape 330 PB Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 4 services at CERN

  5. LHC schedule and IT computing needs IT Challenges: 60x CPU and 10x storage (flat or decreasing budget) Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 5 services at CERN

  6. Procurement – Market Surveys Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 6 services at CERN

  7. Procurement – Tendering cycle Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 7 services at CERN

  8. Upgrade of computing infrastructure – Upcoming tenders • From now, several tenders from the main physics experiments • Upgrade of their on-line facilities (including infrastructure) • First deliveries towards the end of the year, beginning of January 2020 • In January 2020, two large tenders for IT, Beams and the physics experiments • One tender for off-line server nodes, size > 1MHS06 (see next slide) • One tender for IT storage, size > 100PB • First deliveries in Q4 2020 (IT, Beams), remaining deliveries in Q1 2021 (physics experiments) Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 8 services at CERN

  9. Upgrade of computing infrastructure – Technical configurations (1) • Compute nodes: • At least two system units per rack unit (U) • Per system unit: • 2x x86_64 sockets providing a total of a few hundreds of HS06 (https://w3.hepix.org/benchmarking.html) • At least 3GiB of RAM per processing unit (SMT core) • At least 1x 1TB/2TB of enterprise flash storage • At least 1x 10GbE or 1x 25GbE • 1x dedicated management interface (providing Redfish support) • 1x SAS 12Gbit/s HBA with 4x SFF-8644 ports Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 9 services at CERN

  10. Upgrade of computing infrastructure – Technical configurations (2) • Storage arrays: 4U – 24x bays SAS 12Gbit/s • • Fully populated with enterprise drives (S-ATA or SAS) • Each drives with a capacity of at least 12TB • 4x arrays connected to one front-end server In the future, we might tender for different storage arrays: • 4U / 5U with 60 – 102+ bays SAS 12Gbit/s • • Fully populated with enterprise drives (S-ATA or SAS) • Each drives with a capacity of at least 12TB • Arrays split in various SAS zones connected to different front-end servers Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 10 services at CERN

  11. Conclusion • CERN requires significant compute resources to be in-line with the LHC schedule • Companies must be qualified to our market surveys in order to be invited to subsequent calls for tender • A new MS will be dispatched in November 2019 with subsequent calls for tender in Q1 2020 • We are looking forward to work with you! Collaboration with industry in the future upgrades of computing infrastructure and 6/5/2019 11 services at CERN

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend