KGL Code Upgrades Town Hall Meeting August 5, 2020 Project Scope - - PowerPoint PPT Presentation

KGL Code Upgrades Town Hall Meeting August 5, 2020 Project Scope Life Safety Systems Upgrades Fire Protection System Installed Throughout Emergency Power and Lighting Upgrades Guardrail and Handrail Modifications Fire


slide-1
SLIDE 1

KGL Code Upgrades

Town Hall Meeting August 5, 2020

slide-2
SLIDE 2

Project Scope

Life Safety Systems Upgrades

  • Fire Protection System Installed Throughout
  • Emergency Power and Lighting Upgrades
  • Guardrail and Handrail Modifications
  • Fire Rated Shaft and Door Upgrades

Renovations

  • Men’s 1st and 2nd Floor Bathroom Renovations
  • Rooms 113, 120 and 220 Renovations
  • Stair and Corridor Finish Upgrades
  • Lobby and Entrance Upgrades
slide-3
SLIDE 3

Construction Management Team

Christian Meyer

Senior Project Manager

Kristine Ba

Project Engineer

Jessica Roessler

Engineer

Kurt Ahlstrand

MEP Manager

Matt Straub

General Superintendent

Kayla Votto

Senior Engineer

Ron Denny

Construction Executive/ Principal-in-Charge

slide-4
SLIDE 4

KGL Areas of Work

Whitney Avenue

  • KGL Code Upgrades

Primary Work Zones

  • Unshaded areas will

require sprinkler installations throughout

slide-5
SLIDE 5

Fire Protection Plan Exhibit

slide-6
SLIDE 6

Corridor Ceiling and Sprinkler Exhibits

slide-7
SLIDE 7

Stair Modification

slide-8
SLIDE 8

KGL Project Construction Milestones

  • Start Survey and Investigation Work:

9/21/20

  • Start Corridor Work in Ceilings:

11/23/20

  • Start 1st and 2nd Floor Lab Renovations: 11/23/20
  • Start Men’s Bathroom Renovations:

12/1/20

  • Start Atrium and Lobby Upgrades:

1/4/21

  • Start Fire Protection System Install:

1/7/21

  • Project Complete:

Summer 2021

slide-9
SLIDE 9

KGL & Peabody Project Existing Site

Whitney Avenue

slide-10
SLIDE 10

Peabody Project Complete

slide-11
SLIDE 11

Lot 22 Site Logistics Fall 2020

slide-12
SLIDE 12

KGL & Peabody Project Site Logistics Fall 2020

slide-13
SLIDE 13

KGL & Peabody Project Site Logistics Fall 2020

slide-14
SLIDE 14

KGL/Peabody/ESC Loading Dock Jan-Apr 2021

slide-15
SLIDE 15

KGL/Peabody/ESC Loading Dock Jan-Apr 2021

slide-16
SLIDE 16

Peabody Project Site Logistics Spring 2021

slide-17
SLIDE 17

Peabody Project Site Logistics 6/21-3/22

slide-18
SLIDE 18

Peabody Project Site Logistics 4/22-12/22

slide-19
SLIDE 19

Peabody Project Complete 12/22

slide-20
SLIDE 20

Science Hill – Overall Pedestrian Routing

slide-21
SLIDE 21

Sachem’s Wood Pedestrian Routing September 2020

slide-22
SLIDE 22

Questions & Contacts

KGL Code Upgrades Mark Veroneau Associate Project Manager mark.veroneau@yale.edu

Peabody Renovations

https://sciencehillprojects.yale.edu/gallery/peabody-museum-renovation-addition

Justin Pezzolesi Senior Project Manager justin.pezzolesi@yale.edu Sheri Miller Director of Planning & Project Management sheri.miller@yale.edu

slide-23
SLIDE 23

KGL Code Upgrades

Town Hall Meeting August 5, 2020