cloud area
play

Cloud Area St. Cloud Tech High School School District Prepare. - PowerPoint PPT Presentation

SITE AERIAL Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire. LEARNING STUDIO LEVEL ONE LEARNING LEARNING STUDIO STUDIO LEARNING STUDIO LEARNING STUDIO LEARNING STUDIO LEARNING


  1. SITE AERIAL Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  2. LEARNING STUDIO LEVEL ONE LEARNING LEARNING STUDIO STUDIO LEARNING STUDIO LEARNING STUDIO LEARNING STUDIO LEARNING LEARNING STUDIO STUDIO SM GROUP FUTURE EXPANSION LEARNING LEARNING LEARNING STUDIO STUDIO SM STUDIO LEARNING SM GROUP STUDIO GROUP MW INTERIOR SM LEARNING 1:1 LEARNING EXIT GROUP STUDIO STUDIO LEARNING STAIR LEARNING MATERIAL STUDIO STUDIO STORAGE LEARNING STUDIO STAFF MED COLLAB GROUP MED W MEDIUM GROUP E S MED LEARNING T GROUP W GROUP STUDIO I N G MATERIAL MW STORAGE 1:1 SM GROUP SM MED GROUP BOOKSTORE MED GROUP SPECIAL GROUP MW PROJECT MED STAFF ED - EBD FLEX LAB STOR. GROUP COLLAB MEDIA COMMONS CAFE INTERIOR FAB LAB EXIT 2 STAIR SPECIAL LIFE FAB LAB ED SKILLS - 3 (METALS) SPRAY MEDIA & EBD EAST WING OFFICE (ENGINEERING) BOOTH PROJECT CTE STORAGE LEARNING STAFF MATERIAL MW DEMONSTRATION STUDIO STORAGE LAB 1:1 FIXED LEARNING FIXED SCIENCE STUDIO LAB SCIENCE STAFF LEARNING LAB COLLAB STUDIO CHEM MW FAB MW LIFE SPECIAL YARD SKILLS - ED - DCD SPECIAL ASD/ DCD ED FAB LAB OFFICE 1 (WOOD) WATER WAREWASHING KITCHEN BUILDING ALA RECEIVING CARTE DRY SERVING COMMONS STORAGE KITCHEN KITCHEN STORAGE BUILDING SERVICES HOME MW MW BASE ELEC BUILDING STORAGE PE STORAGE FACS GLAZING STORAGE ROOM FACS CLAY MATERIALS ROBE ROOM CLASSROOM ART 2D STORAGE ART 3D STORAGE CHOIR WAREWASHING ROOM TABLE & KILN ? CHAIR ROOM STORAGE CRIT/CURATE AUXILIARY GYMNASIUM EVENT GYMNASIUM GYM 2 GYMNASIUM 3 PERFORMING ARTS ORCHESTRA 05 01N 05 01N 05N 13N 05N 01N 05N 11N 05N 11N 03N 05 05 05N 10N Administration TABLE & 04N MW TIGER DRAMA 10N 15 CHAIR 05N DEN CLASSROOM 05N 04N OFFICE MUSIC STORAGE 05N 10N 11N 05N 04N LIBRARY 05N 05N 05N Art 05N 05N 05N 05N 05N 05N STAGE BACKSTAGE 05N PHYSICAL EDUCATION & ACTIVITIES 15 Building Support ADMINISTRATION 08N FUTURE EXPANSION SHELL ELEC 12 15 FD FD SET / PERFORMING 08N BAND CONCESSIONS PROP / 04N10N ARTS 04N 15 NURSE'S GUIDANCE RISER 01N Circulation, Commons & TEAM / RECEPTION OFFICE CENTER STORAGE 12 PE FLEX ADAPTIVE 08N TEACHER ROOM VESTIBULE COSTUME PE 15 15 Informal Learning COLLABORATION STORAGE TRAINER MW LOCKER - BOYS PE FAB/ LOCKER - SCENE ATHLETIC GIRLS General Learning BOYS SHOP STORAGE/UNIFORM COACH GIRLS PE COACH FD ISSUE LOCKER FD FD LOCKER Performing Arts GIRLS BOYS ATHLETIC ATHLETIC LOCKER - LOCKER - BATHROOM BATHROOM BOYS GIRLS Physical Education & ATHLETICS ATHLETICS LG. CONF Activities SM. MW CONF. Restrooms BREAK ROOM POOL POOL POOL POOL AD EQUIPMENT STORAGE STORAGE OFFICE WAITING AREA Science ACTIVITIES DIRECTOR Special Education Specialty Lab POOL Storage N Cloud Area Level 1 - Overall Floor Plan - Color 1" = 30'-0" St. Cloud Tech High School School District ST. CLOUD TECH HIGH SCHOOL - COLOR PLAN LEVEL 1 Prepare. Engage. Educate. Empower. Inspire. 10/17/2017

  3. LEARNING STUDIO LEARNING STUDIO LEVEL TWO LEARNING STUDIO LEARNING STUDIO LEARNING STUDIO LEARNING STUDIO OPEN TO LEARNING BELOW LEARNING STUDIO STUDIO SM GROUP FUTURE EXPANSION LEARNING STUDIO OPEN TO SM BELOW LEARNING LEARNING GROUP STUDIO STUDIO SM LEARNING GROUP STUDIO LEARNING MW STUDIO 1:1 SM LEARNING LEARNING MATERIAL LEARNING GROUP STUDIO STUDIO STORAGE STUDIO LEARNING STUDIO MED MED STAFF GROUP GROUP W COLLAB LEARNING MED E S CORE GROUP T LEARNING W I N MATERIAL STUDIO G IT WORK STORAGE MW SM ELEC AREA LEARNING 1:1 GROUP SM LAB MED TECH GROUP MEDIA MED GROUP MED HEALTH ROOM RESEARCH GROUP GROUP STAFF LAB OPEN TO BELOW STORAGE COLLAB MEDIA COMMONS LEARNING STUDIO FLEXIBLE FLEXIBLE SCIENCE LOCKERS SCIENCE LAB EAST WING LAB MECH SCIENCE DESIGN PREP LAB STORAGEELEC DATA VISUALIZATION STORAGE 1:1 STUDIO MAIN PRODUCTION DATA LAB LOCKER CONTROL LEARNING STAFF LEARNING ROOM STUDIO COLLAB STUDIO FLEXIBLE FLEXIBLE FLEXIBLE FLEXIBLE MW CIRCULATION SCIENCE SCIENCE ELEC SCIENCE SCIENCE LAB LAB LAB LAB SCIENCE OPEN TO PREP BELOW OPEN TO BELOW GYM BELOW GYM BELOW EVENT GYMNASIUM 5880 SF FUTURE EXPANSION MECH CIRCULATION BOILER FLY LOFT AUDITORIUM MECHANICAL LIGHTING BELOW CONTROL ROOM AUDIO BACKSTAGE CONTROL STAGE PHYSICAL EDUCATION & ACTIVITIES ROOM AMPLIFIER 4020 SF SHELL ROOM SET SHOP MECH MEZZANINE FITNESS Administration CIRCULATION STORAGE FAB/ SCENE Building Support SHOP FUTURE GYMNASTICS RIGGING MULTI-PURPOSE Circulation, Commons & Informal Learning ROOM General Learning Performing Arts Physical Education & Activities Restrooms Science POOL BELOW Specialty Lab Storage N Cloud Area Level 2 - Overall Floor Plan - Color 1" = 30'-0" St. Cloud Tech High School School District ST. CLOUD TECH HIGH SCHOOL - COLOR PLAN LEVEL 2 Prepare. Engage. Educate. Empower. Inspire. 10/17/2017

  4. FRONT ENTRY Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  5. FRONT ENTRY Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  6. LEARNING NEIGHBORHOODS Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  7. COMMONS Cloud Area Cloud Area St. Cloud Tech High School St. Cloud Tech High School School District School District Prepare. Engage. Educate. Empower. Inspire. Prepare. Engage. Educate. Empower. Inspire.

  8. LEARNING NEIGHBORHOOD Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  9. CROSSING CAFE Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  10. TIGER DEN Cloud Area St. Cloud Tech High School School District Prepare. Engage. Educate. Empower. Inspire.

  11. TECH BP 3 BID REVIEW AND ALTERNATE RECOMMENDATIONS

  12. Bid Package Summaries • 34 Work Scopes total. • BP 1 – 6 Work Scopes • BP 2 – 4 Work Scopes • BP 3 – 24 Work Scopes (to be awarded) • 4 Alternates in bid in Bid Package 1 • 18 Alternates in bid in Bid Package 3.

  13. Bid Package Summary and Recommendations • Bids received for Bid Package 3 are being recommended to award. • 15 of 22 Alternates are currently being recommended to award. • Bids and Alternates recommended for award are all within the project budget. • 65% of the Bid Package contracts will be issued to Local Contractors • Local contractor defined as being located within 30 Miles of St Cloud.

  14. TECH CONSTRUCTION PROGRESS 1/10/18

  15. WORK IN PLACE THROUGH JAN 5th • Footings and Foundations in place in the three Learning Neighborhoods and eastern portion of the Commons and Performing Arts. Gymnasium Area is underway. • Sanitary sewer lift station is in place along with a portion of the sanitary sewer and water lines. • Mass site grading completed for the year.

  16. Footings and Foundations Continue

  17. FOOTING AND FOUNDATION COMPLETION

  18. UPCOMING SCHEDULED ACTIVITIES • Footings and Foundations to continue in Gymnasium, Pool, Administration and Performing Arts. • Structural Steel installation to begin the last week of January. • Precast Wall Panels to begin being installed at the Gymnasium on February 26 th .

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend