40th International Society of City and Regional Planners Young Planners Workshop Challenges and Challenges and Opportunities Opportunities of of the the CEVA Project EVA Project presented by SCALED SOLUTIONS Aletta Britz, South Africa


slide-1
SLIDE 1

19 September 2004 Scaled Solutions 1

presented by

SCALED SOLUTIONS

Aletta Britz, South Africa Maya Damayanti, Indonesia Simone Gabi, Germany/ Switzerland Hale Mamunlu, Turkey/ Switzerland Peter Vanden Abeele, Belgium Sebastian Wilske, Germany

Challenges and Challenges and Opportunities Opportunities

  • f
  • f the

the CEVA Project EVA Project

40th International Society of City and Regional Planners Young Planners Workshop

slide-2
SLIDE 2

19 September 2004 Scaled Solutions 2

Presentation Structure:

1. General idea of the CEVA Project (Cornavin-Eaux-Vives- Annemasse) 2. Two possible strategies along CEVA line 3. Three development sites – three themes 4. Time Frame 5. Actors 6. Conclusions

slide-3
SLIDE 3

19 September 2004 Scaled Solutions 3

CEVA: Border-crossing link in the Agglomeration of Geneva

Lausanne, Nyon Paris, Lyon Paris, Lyon Thonon

Legend International Railways Streets Trams CEVA Line

1 km 2 km

N

La Praille Mica Etoile

slide-4
SLIDE 4

19 September 2004 Scaled Solutions 4

CEVA and the urban tissue (development centers)

Legend Commercial Housing Public Station area City / Green

UNO La Praille Mica Etoile Annemasse

1 km 2 km

N

slide-5
SLIDE 5

19 September 2004 Scaled Solutions 5

Assumptions about the effects of CEVA

1. REGIONAL LEVEL

  • A Connection between Switzerland and France will be

created

  • The CEVA line will be an impulse for economic

development

  • A solution for commuter traffic will be introduced

2. LOCAL LEVEL (Carouge/LaPraille, Annemasse, Ambilly and Mon Idee)

  • The value and accessibility of the sites will grow
slide-6
SLIDE 6

19 September 2004 Scaled Solutions 6

Development Strategy with CEVA

slide-7
SLIDE 7

19 September 2004 Scaled Solutions 7

Development Strategy Before CEVA

TGV TGV Highway Tram Tram Landscape

slide-8
SLIDE 8

19 September 2004 Scaled Solutions 8

Development Principle

Development from inside to outside Development from outside to inside (firstly empty)

slide-9
SLIDE 9

19 September 2004 Scaled Solutions 9

Population Carouge: 10.000

Motivation:

  • High density around

accessible activity center, regenerate urban activity

  • Priority: High

Theme for Carouge/ La Praille: A multifunctional central area

66 ha

slide-10
SLIDE 10

19 September 2004 Scaled Solutions 10

Theme for Carouge/ La Praille: A multifunctional central area

Legend:

Highway mainroads Trainline (+ CEVA) Station area Parking area Tramline Green Area

slide-11
SLIDE 11

19 September 2004 Scaled Solutions 11

Theme for Carouge/ La Praille: A multifunctional central area

Legend:

Mixed housing Offices + shopping Services, small enterprises, Offices Green area Recreational facilities

slide-12
SLIDE 12

19 September 2004 Scaled Solutions 12

Theme for Annemasse: Urban Creativity

Motivation:

  • High density around

accessible activity center, provide new vibrant facilities for local and commuting people

  • Priority: High

34 ha Population : 25.000

slide-13
SLIDE 13

19 September 2004 Scaled Solutions 13

Theme for Annemasse: Urban Creativity

Legend:

Highway mainroads Trainline (TGV, CEVA) Station area Parking area

slide-14
SLIDE 14

19 September 2004 Scaled Solutions 14

Theme for Annemasse: Urban Creativity

Legend:

Trainline (TGV, CEVA) Station area Mixed housing Offices + shopping Agricultural area

slide-15
SLIDE 15

19 September 2004 Scaled Solutions 15

Theme for Green Field: Reserve for future shrinking

Motivation:

  • Not within action radius of

railway station

  • Far from urban activities
  • Greenfield with limited

access

  • Development not desirable,

but if pressure for more housing rises – concept

  • Priority: Low

33 ha 29 ha

slide-16
SLIDE 16

19 September 2004 Scaled Solutions 16

Theme for Green Field Reserve for future shrinking

Legend:

Main road Bus access Project area Housing block Private parking

slide-17
SLIDE 17

19 September 2004 Scaled Solutions 17

Theme for Green Field Reserve for future shrinking

Legend: Privat parking Housing block Agricultural area Forest

slide-18
SLIDE 18

19 September 2004 Scaled Solutions 18

Actors

I

1. The CRFG (Comité Régional Franco- Genevois) 2. CEVA Organization*) 3. Swiss:

  • Switzerland Federal
  • Canton of Geneva

4. France:

  • French Central

Government

  • Rhone-alpes

Regional Government

  • Department de Haute

Savoie

*) = to realize CEVA project

Carouge :

  • Commune Geneve
  • Commune Lancy
  • Commune Carouge

Ambilly – Mon Indee and Annemasse:

  • Commune Chéne-Bourg
  • Commune Thönex
  • Community Organization

in France

II

Users, Owners, …

III

slide-19
SLIDE 19

19 September 2004 Scaled Solutions 19

Commune

Geneve Cologny Thönex

Chéne- Bourg Chéne- Bourgéries

Carouge Lancy

slide-20
SLIDE 20

19 September 2004 Scaled Solutions 20

Time Frame

2004: Negotiations with commune 2005 : Tramline in La Praille completed Prepare sites for new higher density develop 2015: High density activities established around La Praille annd Annemasse 2025: Development pressure leads to development of Ambilly and Mon Idée CEVA can start at any point

slide-21
SLIDE 21

19 September 2004 Scaled Solutions 21

Conclusions

  • 1. The development of these concepts do not rely entirely on

the start/timing of the CEVA line, however, it could contribute to even more vibrant and active centers around La Praille and Annemasse stations.

  • 2. The development of the Greenfields is not a high priority in

the short to medium term, however, if pressure for more housing rises in the long term, the proposed concept will be implemented.

  • 3. The various and overlapping Institutions and Stakeholders

might be a challenge that has to be addressed.