www.barcelonasynchrotronpark.com @BSP_en Carlos Dapena González Infrastructures Manager cdapena@parcdelalba.cat
May 2020
Carlos Dapena Gonzlez Infrastructures Manager - - PowerPoint PPT Presentation
Carlos Dapena Gonzlez Infrastructures Manager cdapena@parcdelalba.cat www.barcelonasynchrotronpark.com @BSP_en May 2020 BARCELONA < Barcelona DC Cluster Parc de lAlba is a 408-hectare public park made of 3 areas with 3 main
May 2020
<
*ALBA means Dawn
TOTAL SURFACE 73% PUBLIC USE 37% GREEN AREAS & FREE SPACE
HOUSING UNITS (15,000 RESIDENTS) 47% PUBLIC HOUSING
PRODUCTIVE SPACE 1.39 Mm2 OF FLOOR AREA 30,000 WORKERS
GREEN AREAS 25 ha FACILITIES
COMPANIES WITHIN A 7KM RADIUS OF THE SYNCHROTRON
2017 SOCIAL HOUSING (2009) TIER III certified DC (2015) TIER III certified DC (2014) SYNCHROTRON 2009 TIER III certified DC (2011) 2013
2019
ELECTRICAL SUBSTATION 3-GENERATION PLANT
to vehicles
guard)
(divisions of the cluster into plots are purely illustrative)
BARCELONA DATACENTER CLUSTER
ELECTRICAL SUBSTATION OWN 3-GENERATION PLANT
ST-7 ST-5 ST-4
ST-1
ELECTRICAL SUBSTATION 3-GENERATION PLANT
COLT, UFINET, XOC) + RESERVE INFRASTRUCTURE.
TELEFÓNICA, VODAFONE UFINET TELEFÓNICA TELEFÓNICA COLT BT, ORANGE
BASIC SITE INFRASTRUCTURE AVAILABILITY 99,67%
REDUNDANT CAPACITY COMPONENTS AVAILABILITY 99,74%
CONCURRENTLY MAINTAINABLE AVAILABILITY 99,98%
FAULT TOLERANT SITE INFRASTRUCTURE AVAILABILITY 99,99%