C Line Rapid Bus 90% Design Karyssa Jackson, Community Outreach Coordinator TAAC August 2, 2017 Shawn Walding, Senior Engineer Metro Transit 1 Todays Discussion Informational Feedback from February Project development


slide-1
SLIDE 1

Karyssa Jackson, Community Outreach Coordinator Shawn Walding, Senior Engineer Metro Transit

1

TAAC August 2, 2017

C Line Rapid Bus – 90% Design

slide-2
SLIDE 2
  • Informational
  • Feedback from February
  • Project development update

– Schedule – Funding

  • Design update

– Platform renderings – Vertical separation

  • Communications outreach update
  • Preparing for Construction

Today’s Discussion

2

slide-3
SLIDE 3

What did we hear from TAAC in February?

Stations

  • Stay consistent
  • Continue to explore

navigational tools for station elements

Roadwork

  • Maintain accessible, clear,

continuous PAR through construction:

3

  • Developed BRT Design Guide
  • ATCMTD Grant – Applied in

June, potential award in September

  • Beacon Deployment & Integration
  • Defined through project

specifications

slide-4
SLIDE 4
  • Substantially replaces Route 19

– 8.5 miles from downtown (HCMC) to Brooklyn Center

  • Serves 7,600 people today,

9,300 by 2030

  • Runs in mixed traffic
  • Faster trip

– Pre-boarding fare payment – All-door boarding on 60-foot vehicles – In-lane stop (curb extensions) – Transit signal priority

C Line project overview

2

slide-5
SLIDE 5

Coordinating C Line on Penn Avenue with Hennepin County, and City of Minneapolis

  • C Line BRT (Metro Transit)

– Stations and related construction – Transit signal priority

  • Penn Avenue (Hennepin County)

– Intersection reconstruction partnership – Reconstruction from Lowry to Broadway – Mill & overlay + ADA improvements, Plymouth–Broadway & Lowry–Dowling

  • Penn Avenue (Minneapolis)

– Lighting

5

slide-6
SLIDE 6

Implementation schedule

6 October-November 2016: Initial design considerations (intersection layouts, shelter & pylon placement) January-February 2017: Review station layout (general station element arrangement, curblines) September 2017: Share final station designs (placement of all station features, design treatments) September 2017-March 2018: Share construction plans 2018: Construction 2019: C Line opens with service on Penn Avenue, Olson Highway

2013 2014 2015 2016 2017 2018 2019

C Line Planning 2013-2016 Environmental review 2014-2016 Preliminary design 2016-2017 Final design 2017 Construction 2018 Service begins 2019

We are here

60% Bid

TAAC Touchpoints

slide-7
SLIDE 7

C Line Funding

  • Non-fleet project total cost:

$20 million

  • Funding Plan is to pursue Metro Transit funds to

match available federal funding

  • Planning for funding in place by late August

7

slide-8
SLIDE 8

Temporary Stations on Olson Memorial Highway, Current Recommendation to move to Glenwood in long-term

8

  • Light rail construction will

impact stations

  • Recommended long-term

relocation to Glenwood (future project timed with light rail)

7th & Park

slide-9
SLIDE 9

9

Penn & Plymouth

slide-10
SLIDE 10

10

Penn & Golden Valley

slide-11
SLIDE 11

C Line Community Outreach

Station Neighbor Outreach - Businesses and residents located in the immediate vicinity of a proposed station were engaged through in- person visits and mailed letters. Neighborhood and Community Organizations Presentations and Outreach Pop-Up Outreach – Bus and Stop Open Houses – Traditional and Mobile

11

The majority of C Line outreach has been focused on direct communication to station neighbors impacted by future C Line stations. These interactions have revealed specific needs or concerns of neighbors who have disabilities within the C Line corridor and have been integrated into design development.

slide-12
SLIDE 12

Construction Outreach – How to stay updated

Where to find updates:

  • Sign up for C Line

Update Newsletter - metrotransit.org/c-line- project

  • Community Meetings
  • Presentations
  • Project Partners:

– Penn Avenue Community Works – City of Minneapolis

Who to contact:

  • Project Hotline (Details

coming soon)

  • Metro Transit

Community Outreach - Karyssa Jackson

  • Metro Transit Customer

Relation – 612-373- 3333

12

slide-13
SLIDE 13

Karyssa Jackson, Community Outreach Coordinator 612-349-7396 | Karyssa.Jackson@metrotransit.org Shawn Walding, Senior Engineer 612-341-5668 | shawn.walding@metrotransit.org BRT/Small Starts Project Office

13

metrotransit.org/c-line-project