Business System of Nordgold (BSN) Description In 2012, Nordgold took - - PowerPoint PPT Presentation
Business System of Nordgold (BSN) Description In 2012, Nordgold took - - PowerPoint PPT Presentation
Nordgold: Business System of Nordgold Oleg Maksimov, Head of BSN April 2015 Business System of Nordgold (BSN) Description In 2012, Nordgold took an active decision to make operational efficiency a top priority for the company: Management
2 2
Business System of Nordgold (BSN) Description
- In 2012, Nordgold took an active decision to make operational efficiency a top priority for the company:
- Management has started a bottom-up approach to develop the BSN programme
- Efficiency designated as one of the core values of the company
- Key target of BSN is transform the workforce and improve operational processes
- We created BSN as an “umbrella” brand for all efficiency improvement initiatives in the company
- BSN is being implemented by a dedicated group of internal consultants (referred to as Navigators)
BSN AIMS TO ESTABLISH BEST-IN-CLASS SUSTAINABLE PROCESSES AT THE COMPANY’S OPERATING ASSETS, ENSURING THEY ARE AS EFFICIENT, LOW COST, SUSTAINABLE AND, ABOVE ALL, AS SAFE AS POSSIBLE
1998 2009 2011 2000 Total production
- ptimisation
Continuous improvement Business Systems Production consulting
3 3
MODULES WORKFORCE TRAINING COSTS REDUCTION OPERATIONAL IMPROVEMENT HSE SUPPORT KEY PROJECTS RESULTS
Lean Academy and
training
Idea of the month 5S concept
implementation
Kaizen teams,
Visualisation
Standardisation Communication
(dialogues)
Turnaround
programmes
Overall effectiveness
- f equipment (OEE)
programme
Benchmarking Debottleneck
modeling (volume)
GTS centers Management of
Investment projects
Consumption rates
in mining and milling areas
SG&A reduction Headcount reduction TOP-20 materials Price reduction Outsourcing vs.
insourcing analysis
HSE dialogs HSE models,
reports, audits
White boards and
SOPs development
Exchange of best
practices ♦ Change in people’s mindset, cultural transformation ♦ 2% structural effect
- n EBITDA
♦ Best operational practices/processes ♦ Budget effect on EBITDA ♦ Zero fatalities ♦ Best industry LTI ♦ Best practice sharing ♦ Target TCC & FCF ♦ Budget effect on EBITDA
BSN Consists of 5 Components
SAP IMPLEMENTATION
Implementation of
three waves of SAP project
Post implementation
control and improvement ♦ Process support by SAP system ♦ Consolidation and standardisation of information
1 2 3 4 5
4 4
BSN Contribution to Nordgold’s EBITDA
- In 2012-2014, Nordgold realised more than US$124 million of EBITDA gains via:
- Costs reduction (c. 60%)
- Productivity improvements through implementation of debottlenecking projects (c. 40%)
- Nordgold is targeting a further US$55 million EBITDA gains in 2015 but the focus has now shifted from
costs reductions to increasing productivity
- 3 mines in West Africa estimated to contribute the largest share, accounting for c.70% of the total
19 39 43 25 19 6 8 10 7 7 2014A
64
2 5
17
2012A 2015E
55
2013A
52
West Africa Undeground Russian Open Pits
Productivity improvement Cost reduction
57% 43%
BSN Effect on 2015 EBITDA by Source BSN Effect on EBITDA, 2012-2015, US$ million
5 5
- Generation of efficiency projects is
part of BP / SBP process
- Each Department Head is
provided with an efficiency plan
- Projects generated by joint teams
(BSN + production)
- Reward based on performance
against KPIs on an annual and quarterly basis for Department Heads, linked to gold production, OCF and BSN efficiency target (10-15%)
Efficiency Projects Motivation & KPI
- Project office and Navigators on-
site at each mine
- Line managers responsible for
implementation
Dedicated Team
BSN achieved US$64 million of EBITDA gains in 2014 Targeting more than US$55 million in 2015
Setting Targets Communication Operational Efficiency and Growth
- Weekly status update at each mine
sites
- Monthly dialogue with Dep COOs
- Quarterly review by CEO
Sustainability of BSN is Built on 5 Key Elements
Заправочная / масляная колонка в гараже Мобильное техобслуживание Кайзен 5С Визуализация Стандартизация Предложения по усовершенствованию Инфраструктура буровых работ4 Участок горных работ Поломка переходника перфоратора Поломка переходника перфоратора Поломка переходника перфоратора Подготовка и заказ буровой площадки Расширить объем «банка идей», чтобы включить предложения по улучшению производственных показателей и показателей ОТиПБ Нематериальное поощрение (лучшая идея месяца) Материальное поощрение А. Надю (A Nadeau) Спонсор Руководитель / Навигатор1 МР / ИС ФЯ/ ТК Положение на 2-й неделе 1 4 Общие цели OPS2 Повышение эксплуатационно й готовности Оптимизировать график смен Процесс HSC3 Временные нормы HSC АН/ ТК 2 Увеличение коэффициента использования Повышение производительно сти Контроль произво- дительности Контроль качества бурения АН, ФЯ/ИТ 3 Повышение производительно сти Оптимизация методов выемочных работ6 6
Jan13
Dec14
Case Study – Lefa Turnaround
Cost dynamics and dore production, 2013-2014
Monthly cost, USD 000’ Monthly production, oz
AVERAGE 2013 - US$19.1 mln AVERAGE 2014 - US$15.5 mln
Monthly Spending:
AVERAGE 2013 - 13,900 oz AVERAGE 2014 - 16,899 oz
Monthly Production: Lefa – Turnaround case
When we started Lefa turnaround programme, the
mine generated negative FCF and had AISC well above US$1,000/oz
During 2 years management team with BSN support
were working under efficiency improvement
With the increased level of monthly production total
cash cost spends decreased by US$3.5-4 million across the whole value chain (mining, processing, SG&A)
Key success factors of the turnaround program: Headcount reduction from 2,300 to 1,500
employees, as well as overtimes reduction
Lower reagent consumption by improvement
- f control and processes automatisation
Mine planning, grade control improvement
and mining from new pits – Firifirini, Kankarta North
Control over SG&A, including travelling costs Sustainability lower costs of logistics Training of operators Accurate planning to reduce overstock Improvement of overall efficiency of
equipment (OEE)
7 7
Case Study – Tires Costs Decrease
Total spending on tires was decreased by almost 50% YoY in 2014 Volumes of tire consumed were reduced by 44% YoY The significant improvement was achieved due to the implementation of tire GTS
program (started in early-2013)
Key elements of the program includes: Launch of repair workshops to extend the life of damaged tires Regular pressure check, development of tire rotation procedure Road management with regular grading and sheeting, especially during the
rain season. Use of crushed material to maintain the roads
Root cause analysis for each tire damage Development of tire management software for reporting and data capturing
TIRE MANAGEMENT PROGRAM
Mine Act 2013 Act 2014 Diff. Mine Act 2013 Act 2014 Diff. Aprelkovo 462,000 369,009
- 20%
Aprelkovo 160 115
- 28%
Berezitovy 827,000 374,969
- 55%
Berezitovy 128 108
- 16%
Neryungri 767,000 508,662
- 34%
Neryungri 99 42
- 58%
Lefa 5,362,000 2,034,636
- 62%
Lefa 269 121
- 55%
Bissa 663,000 1,279,310 93% Bissa 36 71 97% Taparko 1,682,000 694,599
- 59%
Taparko 229 94
- 59%
Total 9,763,000 5,261,185
- 46%
Total 921 551
- 40%
Dump Trucks, thsd. USD Dump Trucks, Tires Consumption, piece
Nordgold – reduction of tires consumption
n e w n e w 3 % 3 %
n e w n e w
3 % 3 %
8 8
Case Study– Fuel Economy
Savings on Fuel / HFO / Oils with Total
- Lefa has longstanding relationships with its Fuel/HFO/Oils suppliers with the largest
supplier accounting for c.US$71 million of annual spending
- Last year BSN together with Lefa team tested the quality of supplied products and
identified the following issues:
- HFO shortfall in calorific density of HFO
- LFO low grade of color and lub oils contamination
- Decline of quality of oil supplies
- The procurement team conducted a further market review comparing the prices
among other potential alternative suppliers, which revealed scope for material price reduction from the largest supplier
Results:
- Total annualized savings of US$6.4 million
- Annualised savings on HFO of US$2.0 million driven by:
- Change in pricing mechanism to be based on Platts FOB MED HFO Cargoes 3.5%
- Improvement in transportation costs
- Annualised savings on LFO of US$0.3 million due to additional discount of 100 GNF/l
- Annualised savings on Lubs of US$4.1 million
9 9
Case Study – Overall Equipment Efficiency (Ongoing)
Nordgold OEE project
Downtime analysis
* - first three years
Mining is an important part of our production
chain
We are constantly seeking for mining
efficiency improvement
Detailed productivity analysis for comparable
- pen pit operations and mining equipment
Recommended opportunities for
incorporation into a business improvement plan
Estimated potential cost reduction value for
the identified opportunities
UR, act UR, target Payload, act Payload, target Speed, act Speed, target OEE, target % % % 56% 62% 20 / 49 * 20 / 49 * 20,3 21,3 71 13 323 117% Factor KPI Improvement + 11% + 0% + 5%
Travel empty
285 (19%) 331 (23%) 809 (56%)
Loading Travel loaded
154 (11%) 39 (3%)
Utilization time Dump
TAPARKO
Productive time during the day, min Productivity per truck Daily moved, all fleet km/h m3/h** m3 km/h
* Not checked with weight scales
bcm / t bcm / t
** Productive time included only
OEE calculation