TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO)
FINANCING INITIATIVES AND BUSINESS PLANS THAT WORK
Focusing on Grid Solutions
Presented by: ENG. DECKLAN MHAIKI DEPUTY MANAGING DIRECTOR INVESTMENT (TANESCO-DMDI)
BUSINESS PLANS THAT WORK Focusing on Grid Solutions Presented by: - - PowerPoint PPT Presentation
TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) FINANCING INITIATIVES AND BUSINESS PLANS THAT WORK Focusing on Grid Solutions Presented by: ENG. DECKLAN MHAIKI DEPUTY MANAGING DIRECTOR INVESTMENT (TANESCO-DMDI) CONTENTS Tanzania at a Glance
Presented by: ENG. DECKLAN MHAIKI DEPUTY MANAGING DIRECTOR INVESTMENT (TANESCO-DMDI)
12/12/2016 2
Area 947,300sqm Population 49.25million (2013) GDP 48.6bn USD (2015) GDP per capita 842 USD (2015) Consumption per capita 100kWh
12/12/2016 3
4 Board of Directors Generation Transmission Distribution Ministry of Energy & Minerals Customers
EWURA TPDC REA IPPs Imports
12/12/2016 5
HYDRO – 4.7GW (12% Developed)
COAL – 1.9 Bn tons (0% developed)
12/12/2016 6
Mkuranga 2007 (0.2 TCF) Kiliwani 2008 (0.07 TCF) Songo Songo 1974 (2.5 TCF) Mnazi Bay 1982 (5 TCF) Ntorya 2012 ( 0.178 TCF)
Deep Sea : 47.08 TCF
12/12/2016
(none developed)
12/12/2016 8
Tanzania
Daily solar insolation – 4.21
Annual insolation – 1,538 –
Central zone and part of
12/12/2016 9
40°0'0"E 40°0'0"E 38°0'0"E 38°0'0"E 36°0'0"E 36°0'0"E 34°0'0"E 34°0'0"E 32°0'0"E 32°0'0"E 30°0'0"E 30°0'0"E 2°0'0"N 0°0'0" 2°0'0"S 4°0'0"S 6°0'0"S 8°0'0"S 10°0'0"S 12°0'0"S 14°0'0"S 80 160 240 320 40 Kilometers
Coordinate System: GCS WGS 1984 Datum: WGS 1984 Units: Degree
Legend Legend
Solar radiation (kWh/m2/day) High : 6.13 Low : 4.22
41.7%
44.7%
12.8%
0.8%
Installed Capacity by Ownership Tanesco own 1,049.40MW – 77.3% IPPs own 308.29MW – 22.7%
Transmission Lines 6,167.0km
Distribution Lines 33 & 11kV 32,324.0km
System Frequency 50Hz, ±2.5%
Maximum Demand 1,041.63
Access to electricity 40% (March 2016)
Number of customers 1,973,754
12/12/2016 10
12/12/2016 11
12/12/2016 12
12/12/2016 13
12/12/2016 14
12/12/2016 15
Tanzania is the hub of EAPP and
The new 400kV Backbone line
Iringa - Shinyanga to be ready
The ZTK interconnector will link
Backbone will be a part of the planned ZTK line
North – West 400kV T/L (1,148km) from Mbeya – Sumbawanga – Mpanda –
220kV Bulyanhulu – Geita – Nyakanazi (188km) is under construction and
North – East 400kV T/L (664km) from Dar – Chalinze – Segera – Arusha.
220kV T/L Makambako – Songea (250km) is under construction and expected to
400kV T/L Somanga – Kinyerezi (198km). Compensation to the PAPs Contract
400kV T/L Chalinze – Dodoma (350km). Feasibility study is at the final stage of
12/12/2016 17
18
12/12/2016 19
12/12/2016 20
0% 20% 40% 60% 80% 100% 120% Arusha Dar es salaam Dodoma Geita Iringa Kagera Katavi Kigoma Kilimanjaro Lindi Manyara Mara Mbeya Morogoro Mtwara Mwanza Njombe Pwani Rukwa Ruvuma Shinyanga Simiyu Singida Tabora Tanga
Access Rates per Region (March 2016) – AVR: 40%
%
Non
Villages
12/12/2016 21
12/12/2016 22
Rural electrification financing (REA): Government Project Financing through TANESCO: Generation projects: E.g. Kinyerezi I, IE, & II Transmission projects: E.g. Feasibility study for Chalinze -
Distribution projects: E.g. Construction of Dar es Salaam
Development partners. Project financing through Concessional and Commercial loans.