TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) FINANCING INITIATIVES AND BUSINESS PLANS THAT WORK Focusing on Grid Solutions Presented by: ENG. DECKLAN MHAIKI DEPUTY MANAGING DIRECTOR INVESTMENT (TANESCO-DMDI) CONTENTS Tanzania at a Glance


slide-1
SLIDE 1

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO)

FINANCING INITIATIVES AND BUSINESS PLANS THAT WORK

Focusing on Grid Solutions

Presented by: ENG. DECKLAN MHAIKI DEPUTY MANAGING DIRECTOR INVESTMENT (TANESCO-DMDI)

slide-2
SLIDE 2

CONTENTS

 Tanzania at a Glance  Electricity Sector & Resources  Sustainable Energy Agenda  Generation & Network Expansion Programs  Renewable Energy Development  Financing Initiatives  Conclusion

12/12/2016 2

slide-3
SLIDE 3

TANZANIA AT A GLANCE

Main Figures

 Area 947,300sqm  Population 49.25million (2013)  GDP 48.6bn USD (2015)  GDP per capita 842 USD (2015)  Consumption per capita 100kWh

12/12/2016 3

slide-4
SLIDE 4

ELECTRICITY SECTOR (Key stakeholders)

4 Board of Directors Generation Transmission Distribution Ministry of Energy & Minerals Customers

EWURA TPDC REA IPPs Imports

slide-5
SLIDE 5

LEGAL FRAMEWORK GOVERNING THE SECTOR

Electricity & Gas:

  • National Energy Policy 2015
  • Electricity Act, 2008
  • Natural Gas Policy, 2013
  • Natural Gas Act (under preparation)
  • National Gas Utilization Master Plan (under prep).
  • EWURA Act of 2001,
  • REA Act of 2005 and

Cross-cutting Legislations

  • Occupational Safety and Health Act, 2003
  • Environmental Management Act, 2004
  • Income Tax Act, 2004
  • Public-Private-Partnership Act, 2010

12/12/2016 5

slide-6
SLIDE 6

ENERGY RESOURCES

HYDRO – 4.7GW (12% Developed)

COAL – 1.9 Bn tons (0% developed)

12/12/2016 6

slide-7
SLIDE 7

Mkuranga 2007 (0.2 TCF) Kiliwani 2008 (0.07 TCF) Songo Songo 1974 (2.5 TCF) Mnazi Bay 1982 (5 TCF) Ntorya 2012 ( 0.178 TCF)

NATURAL GAS DISCOVERIES

TOTAL GIIP: 57.25 TCF (Developed - 607MW)

Deep Sea : 47.08 TCF

Total GIIP Onshore = 10.17 TCF

12/12/2016

slide-8
SLIDE 8

GEOTHERMAL POTENTIAL

 58 sites – 5,000MW

(none developed)

12/12/2016 8

slide-9
SLIDE 9

SOLAR POTENTIAL – DEVELOPED SOLAR MAP

 Tanzania

is among the countries with high solar radiation.

 Daily solar insolation – 4.21

– 6.13 kWh/m2/day

 Annual insolation – 1,538 –

2,242 kWh/m2/yr

 Central zone and part of

southern and Lake Zone are dominating.

12/12/2016 9

40°0'0"E 40°0'0"E 38°0'0"E 38°0'0"E 36°0'0"E 36°0'0"E 34°0'0"E 34°0'0"E 32°0'0"E 32°0'0"E 30°0'0"E 30°0'0"E 2°0'0"N 0°0'0" 2°0'0"S 4°0'0"S 6°0'0"S 8°0'0"S 10°0'0"S 12°0'0"S 14°0'0"S 80 160 240 320 40 Kilometers

±

Coordinate System: GCS WGS 1984 Datum: WGS 1984 Units: Degree

Legend Legend

Solar radiation (kWh/m2/day) High : 6.13 Low : 4.22

slide-10
SLIDE 10

ELECTRICITY SECTOR

Main figures by October, 2016

Generation grid installed capacity 1,357.69MW

  • Hydro

41.7%

  • Natural gas

44.7%

  • Oil

12.8%

  • Biomas

0.8%

Installed Capacity by Ownership Tanesco own 1,049.40MW – 77.3% IPPs own 308.29MW – 22.7%

Transmission Lines 6,167.0km

Distribution Lines 33 & 11kV 32,324.0km

Distribution Lines 0.4/0.23kV 101,900.0km

System Frequency 50Hz, ±2.5%

Maximum Demand 1,041.63

Access to electricity 40% (March 2016)

Number of customers 1,973,754

12/12/2016 10

slide-11
SLIDE 11

SUSTAINABLE ENERGY AGENDA

In Line With SDG 7 Tanzania has Developed the National Development Vision 2025 with the Following Main Objective:

 Transform the Country Into a Middle Income by

2050.

 Increase Generation Capacity to 10000MW by

2025

 Increase Access to 75% by 2025

12/12/2016 11

slide-12
SLIDE 12

SUSTAINABLE ENERGY AGENDA - NATIONAL DEVELOPMENT VISION

National Development Vision 2025 has the Following Main Objective:

 Transform the Country Into a Middle Income by

2025.

 Increase Generation Capacity to 10000MW by

2025

 Increase Access to 75% by 2025  Strengthening the national grid in terms of

generation and transmission capacity is the main agenda

12/12/2016 12

slide-13
SLIDE 13

GENERATION CAPACITY EXPANSION PROGRAMME

12/12/2016 13

The short and Medium Term plan is to increase generation capacity to 5,000MW and a huge potential of natural gas which is available locally as a source of power generation will enable to achieve this target by 2020 including:

  • Kinyerezi I Extension 185MW under construction - expected to be online by

2018.

  • Kinyerezi II 240MW natural gas fired power plant with financing from Japan

and GOT under construction - expected to be online by 2018.

  • 300MW natural gas fired plant proposed to be financed by JICA and GOT

and it is at the appraisal stage. Planned to be ready by 2020.

  • Ongoing negotiation with various developers: 300MW (coal), 100MW

(wind), Solar PV (55MW), 850 MW (natural gas) and 70MW (Hydro) – All these plant to be online by 2020.

slide-14
SLIDE 14

GENERATION CAPACITY EXPANSION PROGRAMME……

12/12/2016 14

Long-term View:

  • Competitive procurement of generation projects for all

technologies i.e. natural gas, coal, wind, hydro and Solar.

slide-15
SLIDE 15

NETWORK EXPANSION PROGRAMME

Network Expansion Involves:

 Grid Extensions  Distribution Expansion and Rural Electrification

12/12/2016 15

slide-16
SLIDE 16

GRID EXTENSION: Backbone / ZTK Transmission Line Under Construction

 Tanzania is the hub of EAPP and

SAPP and important for power interconnection.

 The new 400kV Backbone line

will connect the South and south west of Tanzania to the load centers in the North.

 Iringa - Shinyanga to be ready

by end of 2016 and Singida – Arusha – Namanga Kenya will be ready by end of 2018.

 The ZTK interconnector will link

the Southern and Eastern Power Pools and enable will power trading.

Backbone will be a part of the planned ZTK line

slide-17
SLIDE 17

GRID EXTENSION……. Cont.

 North – West 400kV T/L (1,148km) from Mbeya – Sumbawanga – Mpanda –

Kigoma – Nyakanazi is under review of feasibility study from 220kV to 400kV.

 220kV Bulyanhulu – Geita – Nyakanazi (188km) is under construction and

expected to be completed in 2018.

 North – East 400kV T/L (664km) from Dar – Chalinze – Segera – Arusha.

Financing has been finalized and planned to commence construction early 2017 and completed in 2019.

 220kV T/L Makambako – Songea (250km) is under construction and expected to

be completed in 2018.

 400kV T/L Somanga – Kinyerezi (198km). Compensation to the PAPs Contract

negotiation with the Consultant for supervision of the project is ongoing.

 400kV T/L Chalinze – Dodoma (350km). Feasibility study is at the final stage of

completion.

12/12/2016 17

slide-18
SLIDE 18

FUTURE GRID MAP BY 2033

18

slide-19
SLIDE 19

CUSTOMER BASE AND CONNECTION RATE

Efforts towards universal access to modern energy involves connecting more customers through National Grid and Mini- grids.

 The current customer base is about 1.9 million.  Annual connection rate stands at 250,000 customers.  Access/ Connectivity; All regional headquarters in

Tanzania and (99%) of district headquarters have

  • electricity. Currently the connectivity level stands at 33%

and access level at 40%. Our target is to increase electricity connectivity level to 75% by 2025.

12/12/2016 19

slide-20
SLIDE 20

STATUS OF ACCESS PER REGION

12/12/2016 20

0% 20% 40% 60% 80% 100% 120% Arusha Dar es salaam Dodoma Geita Iringa Kagera Katavi Kigoma Kilimanjaro Lindi Manyara Mara Mbeya Morogoro Mtwara Mwanza Njombe Pwani Rukwa Ruvuma Shinyanga Simiyu Singida Tabora Tanga

Access Rates per Region (March 2016) – AVR: 40%

%

  • f

Non

  • Electrified

Villages

slide-21
SLIDE 21

RURAL ELECTRIFICATION PROGRAMME

 The Government of Tanzania through REA has set

a target of providing electricity services to all villages in Tanzania by year 2021 through grid extension and off-grid renewable energy solutions.

 Several initiatives have been developed and some

  • f them are in various stages of implementation

(i.e. Grid extension projects, Renewable energy projects, grid connected mini grids, off grid projects, etc.)

12/12/2016 21

slide-22
SLIDE 22

EXTENT OF RURAL ELECTRIFICATION

12/12/2016 22

slide-23
SLIDE 23

Renewable Energy Development

The Government has established a Subsidiary Company for development

  • f

Geothermal named Tanzania Geothermal Development Company.

The Stability Study for integrating renewable energy sources mainly wind farm and Solar PV plant into the national Grid have been conducted.

The study provided Limit of the overall RE capacity to about:

  • 385MW capacity at 1,250MW peak demand
  • 710 MW capacity at 2,500MW peak demand.

Peak demand reached so far is 1026.48MW.

slide-24
SLIDE 24

Financing Initiatives

Financing initiatives in Tanzanian Power Sector include:

 Rural electrification financing (REA):  Government Project Financing through TANESCO:  Generation projects: E.g. Kinyerezi I, IE, & II  Transmission projects: E.g. Feasibility study for Chalinze -

Dodoma transmission line

 Distribution projects: E.g. Construction of Dar es Salaam

Distribution Control Centre

 Development partners.  Project financing through Concessional and Commercial loans.

slide-25
SLIDE 25

CONCLUSION

 The Demand for Energy will continue to increase

  • ver the coming years.

 With its vast and untapped energy resources

Tanzania is an ideal place for clean and renewable energy solutions to ensure sustainability of the electricity sector.

 However, more Financing initiatives are needed

to ensure successful implementation of various business plans and programmes.

12/12/2016 25

slide-26
SLIDE 26

THANK YOU