BUILDING SEISMIC INSTRUMENTATION USING STRONG MOTION ACCELEROGRAPHS National Structural Code of the Philippines 2010 Chapter 1, Section 105 105.2 Earthquake-Recording and Instrumentation 105.2.1 General Unless waived by the Building


slide-1
SLIDE 1

BUILDING SEISMIC INSTRUMENTATION USING STRONG MOTION ACCELEROGRAPHS

slide-2
SLIDE 2

National Structural Code of the Philippines 2010

Chapter 1, Section 105 105.2 Earthquake-Recording and Instrumentation 105.2.1 General Unless waived by the Building Official, every building in Seismic Zone 4 over 50 m in height shall be provided with not less than three approved recording accelerographs. The accelerographs shall be interconnected for common start and common timing.

slide-3
SLIDE 3

Seismic Zone 4

slide-4
SLIDE 4

DPWH IRR on Earthquake Instrumentation

slide-5
SLIDE 5

Benefits of Installing Accelerographs

BETTER SEISMIC DESIGN

  • 1. Prove the dynamic model used in the building design process
  • 2. Validate or improve seismic design codes

RAPID ASSESSMENT AND DAMAGE MITIGATION

  • 3. Monitor structural response during an earthquake
  • 4. Provide information used in post-earthquake actions
  • 5. Interact with automatic shutdown controls to minimize damage
  • 6. Provide data useful to the retrofit process

BUSINESS CONTINUITY

  • 7. Reduce the monitored structure’s post-earthquake non-operational downtime
slide-6
SLIDE 6

Sample Earthquake Response

slide-7
SLIDE 7

Engineering Solution

Displacement Time-History Drift Ratio Damage Condition Post-Earthquake Assessment Building Occupancy Resumption Program

slide-8
SLIDE 8

Engineering Solution

Immediate Occupancy Life Safety Collapse Prevention

slide-9
SLIDE 9

EMERGENCY RESPONSE PLANNING: THE QUEZON CITY SAFE BUILDING PROGRAM

slide-10
SLIDE 10
slide-11
SLIDE 11

THE BIG PICTURE

FOR POLICY MAKERS FOR OWNERS AND OPERATORS FOR FACILITY MANAGERS FOR OCCUPANTS AND RESIDENTS Improve safety mandates for the public and showcase the city’s growth Save money by reducing downtime and continue business as usual Better manage decisions on evacuation and reoccupation Increase confidence in safety and avoid panic during state of emergency

slide-12
SLIDE 12

IMPLEMENTATION

slide-13
SLIDE 13

MONITORS AND OUTPUTS

W E B O U T P U T

slide-14
SLIDE 14

MONITORS AND OUTPUTS

W E B O U T P U T

slide-15
SLIDE 15

MONITORS AND OUTPUTS

W E B O U T P U T

slide-16
SLIDE 16

MONITORS AND OUTPUTS

W E B O U T P U T

slide-17
SLIDE 17

MONITORS AND OUTPUTS

IMMEDIATE OCCUPANCY LIFE SAFETY COLLAPSE PREVENTION

slide-18
SLIDE 18

Questions ?

slide-19
SLIDE 19

Maraming Salamat!