SLIDE 1
BUILDING SEISMIC INSTRUMENTATION USING STRONG MOTION ACCELEROGRAPHS - - PowerPoint PPT Presentation
BUILDING SEISMIC INSTRUMENTATION USING STRONG MOTION ACCELEROGRAPHS - - PowerPoint PPT Presentation
BUILDING SEISMIC INSTRUMENTATION USING STRONG MOTION ACCELEROGRAPHS National Structural Code of the Philippines 2010 Chapter 1, Section 105 105.2 Earthquake-Recording and Instrumentation 105.2.1 General Unless waived by the Building
SLIDE 2
SLIDE 3
Seismic Zone 4
SLIDE 4
DPWH IRR on Earthquake Instrumentation
SLIDE 5
Benefits of Installing Accelerographs
BETTER SEISMIC DESIGN
- 1. Prove the dynamic model used in the building design process
- 2. Validate or improve seismic design codes
RAPID ASSESSMENT AND DAMAGE MITIGATION
- 3. Monitor structural response during an earthquake
- 4. Provide information used in post-earthquake actions
- 5. Interact with automatic shutdown controls to minimize damage
- 6. Provide data useful to the retrofit process
BUSINESS CONTINUITY
- 7. Reduce the monitored structure’s post-earthquake non-operational downtime
SLIDE 6
Sample Earthquake Response
SLIDE 7
Engineering Solution
Displacement Time-History Drift Ratio Damage Condition Post-Earthquake Assessment Building Occupancy Resumption Program
SLIDE 8
Engineering Solution
Immediate Occupancy Life Safety Collapse Prevention
SLIDE 9
EMERGENCY RESPONSE PLANNING: THE QUEZON CITY SAFE BUILDING PROGRAM
SLIDE 10
SLIDE 11
THE BIG PICTURE
FOR POLICY MAKERS FOR OWNERS AND OPERATORS FOR FACILITY MANAGERS FOR OCCUPANTS AND RESIDENTS Improve safety mandates for the public and showcase the city’s growth Save money by reducing downtime and continue business as usual Better manage decisions on evacuation and reoccupation Increase confidence in safety and avoid panic during state of emergency
SLIDE 12
IMPLEMENTATION
SLIDE 13
MONITORS AND OUTPUTS
W E B O U T P U T
SLIDE 14
MONITORS AND OUTPUTS
W E B O U T P U T
SLIDE 15
MONITORS AND OUTPUTS
W E B O U T P U T
SLIDE 16
MONITORS AND OUTPUTS
W E B O U T P U T
SLIDE 17
MONITORS AND OUTPUTS
IMMEDIATE OCCUPANCY LIFE SAFETY COLLAPSE PREVENTION
SLIDE 18
Questions ?
SLIDE 19