Brunso n Re pla c e me nt Sc ho o l Site Optio ns Aug ust 26-27, - - PowerPoint PPT Presentation

brunso n re pla c e me nt sc ho o l
SMART_READER_LITE
LIVE PREVIEW

Brunso n Re pla c e me nt Sc ho o l Site Optio ns Aug ust 26-27, - - PowerPoint PPT Presentation

Brunso n Re pla c e me nt Sc ho o l Site Optio ns Aug ust 26-27, 2020 1 We lc ome & Ope ning Dr . Ange la P. Hair ston, Supe rinte nde nt Winsto n-Sa le m / F o rsyth Co unty Sc ho o ls 2 Intr oduc tions WS/ F CS Pla nning a


slide-1
SLIDE 1

Brunso n Re pla c e me nt Sc ho o l

Site Optio ns

1

Aug ust 26-27, 2020

slide-2
SLIDE 2

We lc ome & Ope ning

Dr . Ange la P. Hair ston, Supe rinte nde nt

Winsto n-Sa le m / F

  • rsyth Co unty Sc ho o ls

2

slide-3
SLIDE 3

Intr

  • duc tions
  • WS/ F

CS Pla nning a nd Co nstruc tio n De pa rtme nt

Co lo n Mo o re Nic k Se e b a

  • Wa lte r Ro b b s Arc hite c ts

We sle y Curtis

  • Gilb a ne Ge ne ra l Co ntra c to rs

David Re pnye k

  • S&ME

E ng ine e ring

Wayne Watte rso n

  • L

inville T e a m Pa rtne rs

Aub re y L inville

3

slide-4
SLIDE 4

Sc he dule

4

slide-5
SLIDE 5

Brunso n a t Brunso n Ae ria l

5

slide-6
SLIDE 6

Brunso n a t Co o k Ae ria l

6

slide-7
SLIDE 7

Brunso n a t Pa tte rso n Ae ria l

7

slide-8
SLIDE 8

Site Se le c tio n Pro c e ss

  • 10 site o ptio ns ide ntifie d thru Spring 2019
  • E

nliste d g uida nc e fro m City o f WS a nd Co mmunity Gro ups

  • E

ng a g e d L inville T e a m Pa rtne rs a nd 19 a dditio na l site s ide ntifie d

  • T
  • ta l o f 29 site s e va lua te d

8

slide-9
SLIDE 9

Pro je c t Co mme nc e d: April 1, 2019

9

slide-10
SLIDE 10

Brunso n Site Surro unding Are a

10

slide-11
SLIDE 11
slide-12
SLIDE 12

Co o k Site Surro unding Are a

12

slide-13
SLIDE 13
slide-14
SLIDE 14

Pa tte rso n Site Surro unding Are a

slide-15
SLIDE 15
slide-16
SLIDE 16

Site T e sting

  • Br

unson Site

  • Re po rt o f L

imite d Gro undwa te r a nd So il Asse ssme nt da te d 6/ 9/ 20 (S&ME )

  • Cook Site
  • Re po rt o f Sub surfa c e I

nve stig a tio n da te d 5/ 1/ 78 (L a w E ng ine e ring )

  • Sub surfa c e E

xplo ra tio n da te d 5/ 10/ 84 (E ng ine e ring T e c to nic s)

  • Patte r

son Ave Site

  • Pha se I

E nviro nme nta l Site Asse ssme nt da te d 9/ 10/ 19 (S&ME )

  • Pha se I

I E SA da te d 2/ 17/ 20 (S&ME )

16

slide-17
SLIDE 17

17

Co nc e ptua l De sig n Sc he ma tic De sig n De sig n De ve lo pme nt Co nstruc tio n Do c ume nts Co nstruc tio n Administra tio n 2mh 3mh 3mh 6mh 18mh

re nde ring

slide-18
SLIDE 18

Brunso n Brunso n Co nc e pt Dra wing

18

slide-19
SLIDE 19

Brunso n Co o k Co nc e pt Dra wing

19

slide-20
SLIDE 20

Brunso n Pa tte rso n Co nc e pt Dra wing

20

slide-21
SLIDE 21

OVE RVIE W OF T HE 3 OPT IONS

@ Br unson @ Cook @Patte r son Ave

L a nd/ Site de ve lo pme nt $9.9M $3.8M $6.7M Co nstruc tio n $26.8M $27.7M $23.9M Numb e r o f stude nts 800 926 800 “So ft” c o sts $5.4M $5.1M $3.9M

(de sig n, te sting , re lo c a tio n, furniture , te c hno lo g y, e q uipme nt)

T OT AL PROJE CT COST $42.1M $36.6M $34.6M

21

slide-22
SLIDE 22

Wha t I s Re me dia tio n?

Re me diatio n is re mo ving o r c o rre c ting a fault

  • Site te sting indic a te s no thing une xpe c te d fo r a n urb a n site
  • Re me dia tio n pla n fo r a ll 3 site s:
  • I

nstallatio n o f vapo r b arrie r syste m at slab -o n-g rade are as

  • I

nstallatio n o f a “c ap” b arrie r syste m at any o the r lo c atio ns

  • Pa rtic ipa tio n in the NCDE

Q’ s Bro wnfie lds Pro g ra m e nsure s a dhe re nc e to this suc c e ssful re me dia tio n

22

slide-23
SLIDE 23

Stude nt Assig nme nt

  • 2016 Bo nd pro vide d funding fo r a ne w Brunso n E

S with a c a pa c ity

  • f 800 stude nts
  • Ave ra g e e nro llme nts fo r 2019-20:

Brunso n = 479 Co o k = 242

  • Re side ntia l stude nts:

Brunso n = 360 Co o k = 344

  • Stude nts a tte nding fro m o utside the sc ho o l re side ntia l zo ne :

Brunso n = 278 Co o k = 58

  • F
  • r a Brunso n – Co o k me rg e r, c a pa c ity de sig ne d fo r 926 stude nts

23

slide-24
SLIDE 24

Me rg e r o f Brunso n & Co o k

  • Only ha ppe ns if the Brunso n at Co o k o ptio n is a c c e pte d b y the

BOE

  • T

his o ptio n is the o nly o ne with re -dra wn b o unda ry implic a tio ns

  • Na me fo r a ne w sc ho o l will b e vo te d o n b y the BOE

. Our po lic y (8120) a llo ws fo r:

  • Pub lic input o f sc ho o l name sug g e stio ns
  • Pub lic No tic e o f BOE

sc ho o l name sug g e stio n re vie w me e ting

  • At le ast o ne pub lic he aring to re c e ive and c o nside r c o mme nts and

sug g e stio ns fro m the pub lic

24

slide-25
SLIDE 25

Re lo c a tio n During Co nstruc tio n

I f Brunso n o r Co o k site s are se le c te d, what happe ns to stude nts and staff during c o nstruc tio n?

  • 1. Re lo c a te a ll to a “swing ” sc ho o l; o r
  • 2. Dispe rse a ll to o the r sc ho o ls a ro und the distric t

Ultima te ly, de c isio n ma de b y the Bo a rd o f E duc a tio n

25

slide-26
SLIDE 26

Surve y

  • Allo ws fo r yo ur input o n the 3 site s
  • L

ink a va ila b le o n the Brunso n, Co o k, a nd Distric t we b site s

  • Ava ila b le thru F

rida y, Se pte mb e r 4, 2020

26

slide-27
SLIDE 27

Co nc lusio n

Se nd q ue stio ns to :

br unsonoptions@wsfc s.k12.nc .us

27