Alamo Wash Basin Management Study Open House #1 March 22, 2017 Welcome Agenda Introductions and Opening Comments Project Characteristics Project Scope of Work Project Schedule Public and Stakeholder Involvement and Input


  1. Alamo Wash Basin Management Study Open House #1 March 22, 2017

  2. Welcome • Agenda  Introductions and Opening Comments  Project Characteristics  Project Scope of Work  Project Schedule  Public and Stakeholder Involvement and Input  Questions  Adjourn to Comment on Maps

  3. Fred Felix, P.E. City/County collaboration • Study will identify best way to manage this basin • Develop rating system for all aspects • Share knowledge of study area – Comment forms •

  4. Introductions • Project Team  Pima County Regional Flood Control District  City of Tucson  CMG Drainage Engineering Inc.  JE Fuller Hydrology & Geomorphology Inc.  Ashby Surveying  Wheat Design Group  Kaneen Communications

  5. Project Characteristics

  6. Project Scope of Work • Existing Conditions Data Collection and Review • Floodplain Delineation • FEMA Letter of Map Revision (LOMR) if Justified • Alternatives Analysis and Remediation Recommendations • Public and Stakeholder Involvement

  7. Existing Conditions • Data Collection  Drainage Complaints  Operation Splash  As-Built Plans  Review Previous Studies • Historical Peak Flow Data  Tucson Stormwater Mgt Study  USGS Stream Gage • Field Inspections  Survey Existing Culverts, etc.

  8. Floodplain Delineation • 2 dimensional modeling (FLO-2D) • New Technology (not available 20 years ago) • More detail – breaks down watershed to over 1 million pieces • Uses current topographic and landuse data (2015) • Able to reflect bridges, culverts, storm drains, etc. • Better for alternatives evaluation • Major Wash & localized flows are determined • Draft map for illustration only

  9. Alternatives Analysis • Develop a comprehensive list of problem areas • Top rated locations to advance • Listen to Stakeholders about potential Alternatives

  10. Alternatives Analysis • Propose mix of alternatives • Structural (new culvert, bank protection, detention basin, etc.) • Policy based (development standard) • Operational (frequency of vegetation maintenance)

  11. Project Schedule

  12. Public and Stakeholder Involvement and Input • Periodic stakeholders meetings • Flood Control Project website • Go to www.pima.gov and enter Alamo Wash Basin Management in the search field • Project updates • First of three Open Houses

  13. Questions?

  14. Thank You! Please Visit Our Maps!

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.