SCHOOL BUILDING COMMITTEE Annie E. Fales Elementary School Westborough, MA July 12, 2018 H M F H A R C H I T E C T S MSBA Module 3 Feasibility Study 3.1 Preliminary Design Program 3.2 MSBA Review of Preliminary Design Program
MSBA Module 3 Feasibility Study
- 3.1 Preliminary Design Program
- 3.2 MSBA Review of Preliminary Design Program
- 3.3 Preferred Schematic Report
- 3.4 Approval to Proceed into Schematic Design
MSBA Module 4 Schematic Design
- 4.1 Schematic Design Submittal
- 4.2 MSBA Review and Approval of Schematic Design
3.1 Preliminary Design Program
- Educational Program
- Initial Space Summary
- Evaluation of Existing Conditions
- Site Development Requirements
- Preliminary Evaluation of Alternatives
- Local Actions and Approvals
3.1.6 Preliminary Evaluation of Alternatives
Accommodates 400 Students Supports Educational Program Goals Meets Code and Facility Condition Requirements Maximizes Land for program Uses Minimizes Impact on Classrooms During Construction Minimizes Impact on Site Use During Construction Construction Duration (in months) Estimated Construction Cost (in millions) Estimated Swing Space Cost (in millions) Estimated Project Cost (in millions)
OPTION 1A
New Construction
20 $33.7
- $__
OPTION 1B
New Construction
20 $32.9
- $__
OPTION 2
New Construction
20 $33.3
- $__
OPTION 3A
New Construction
20 $33.2
- $__
OPTION 3B
New Construction
20 $33.5
- $__
OPTION 4
Renovation / Addition
30 $32.3 $3.1 $__ OPTION 5
Renovation Only
- OPTION 6
No Build
- Meets Criteria
Partially Meets Criteria Does Not Meet Criteria
Option 1A
Eli Whitney Street Arrowhead Lane F a l e s S c h
- l
Enrollment: 400 Students Grades: K
- 3rd
Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 68,735 GSF Total Area: 68,735 GSF Estimated Cost: ECC: $34,83,766 ETPC: $45,348,909
Second Floor First Floor Third Floor
CAFETERIA STAIR K I T C H E N STAGE ADMINISTRATION G Y M S E R V I C E STAIR MECH STOR MECH STOR STOR MAIN ENTRANCE
3 R D L E V E L A B O V ELOADING
EXIT TO PLAY AREA & FIELDS C A F E T E R I A B E L O WSTAIR
K I T C H E N B E L O W STAGE BELOWMUSIC
G Y M B E L O WSTAIR
MECH BELOW 3 R D L E V E L A B O V E E X I TART O T P T
R O O F B E L O WSTAIR K CR STAIR
R O O F B E L O WUPPER STUDENT ENTRANCE K CR K CR K CR K CR 1 CR 1 CR 1 CR 1 CR 1 CR 2 CR 2 CR 2 CR 2 CR 2 CR 3 CR 3 CR 3 CR 3 CR 3 CR MEDIA CENTER M S P R P R WK WK SPED SPED
Option 1B
Enrollment: 400 Students Grades: K
- 3rd
Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 67,520 GSF Total Area: 67,520 GSF Estimated Cost: ECC: $34,113,396 ETPC: $44,347,415
Eli Whitney Street Arrowhead Lane F a l e s S c h
- l
Second Floor First Floor Third Floor
ADMINISTRATION MAIN ENTRANCE
C A F E T E R I A B E L O WSTAIR
STAGE BELOW G Y M B E L O WSTAIR
3 R D L E V E L A B O V E ROOF BELOWMECH/ STOR MEDIA CENTER LOADING
E X I T T O P L A Y A R E A & F I E L D SSTAIR CAFETERIA K I T C H E N STAGE S E R V I C E STOR STOR STAIR MUSIC A R T O T P T G Y M
R O O F B E L O W MEDIA CENTER BELOWSTAIR STAIR K CR K CR K CR K CR K CR 1 CR 1 CR 1 CR 1 CR 1 CR 2 CR 2 CR 2 CR 2 CR 2 CR 3 CR 3 CR 3 CR 3 CR 3 CR M S P R P R WK WK SPED SPED LG GP
E X I T T O K P L A Y A R E AOption 2
Enrollment: 400 Students Grades: K
- 3rd
Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 68,120 GSF Total Area: 68,120 GSF Estimated Cost: ECC: $34,462,625 ETPC: $44,801,112
Eli Whitney Street Arrowhead Lane F a l e s S c h
- l
Second Floor First Floor Third Floor
CAFETERIA KITCHEN STAGE A D M I N I S T R A T I O N G Y M SERVICE S T A I R OT PT M A I N E N T R A N C E
3RD LEVEL ABOVEL O A D I N G
EXIT TO PLAY AREA & FIELDSS T A I R
STAIR E X I TS T A I R MECH / STORAGE S T A I R
CAFETERIA BELOW STAGE BELOW GYM BELOWM E D I A C E N T E R M U S I C A R T
STAIRK C R S T A I R S T A I R K C R K C R K C R K C R 1 C R 1 C R 1 C R 1 C R 1 C R 2 CR 2 CR 2 CR 2 CR 2 CR 3 CR 3 CR 3 CR 3 CR 3 CR PR MS PR WK WK S P E D S P E D
E X I TOption 3A
Enrollment: 400 Students Grades: K - 3rd Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 68,735 GSF Total Area: 68,735 GSF Estimated Cost: ECC: $34,396,047 ETPC: $44,714,861
Eli Whitney Street Arrowhead Lane F a l e s S c h
- l
Temporary Parking
Second Floor First Floor
CAFETERIA KITCHEN S T A G E ADMINISTRATION SERVICE STAIR O T P T MAIN ENTRANCE LOADING
E X I T T O P L A Y A R E A & F I E L D SSTAIR
S T A I R EXITMECH / STORAGE GYM M E D I A C E N T E R K C R K C R K C R K C R K C R 1 CR 1 CR 1 CR 1 CR 1 CR S P E D W K STAIR STAIR
S T A I RMECH /STOR 3 CR S P E D 3 CR 3 CR 3 CR 3 CR WK MUSIC ART MS PR PR
G Y M B E L O W C A F E T E R I A B E L O W S T A G E B E L O W MEDIA CENTER BELOW2 CR 2 CR 2 CR 2 CR 2 CR
ROOF BELOWOption 3B
Enrollment: 400 Students Grades: K - 3rd Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 69,055 GSF Total Area: 69,055 GSF Estimated Cost: ECC: $34,681,653 ETPC: $45,086,149
T e m p
- r
a r y P a r k i n g
Eli Whitney Street Arrowhead Lane F a l e s S c h
- l
CAFETERIA KITCHEN S T A G E ADMINISTRATION SERVICE STAIR O T P T MAIN ENTRANCE LOADING
E X I T T O P L A Y A R E A & F I E L D SSTAIR
S T A I R EXITMECH / STORAGE GYM M E D I A C E N T E R K C R K C R K C R K C R K C R 1 CR 1 CR 1 CR 1 CR 1 CR S P E D W K STAIR STAIR
S T A I RMECH /STOR 3 CR S P E D 3 CR 3 CR 3 CR 3 CR WK MUSIC ART PR
G Y M B E L O W C A F E T E R I A B E L O W S T A G E B E L O W MEDIA CENTER BELOW2 CR 2 CR 2 CR 2 CR 2 CR
ROOF BELOWPR MS
Second Floor First Floor
Option 4
Enrollment: 400 Students Grades: K - 3rd Demolition: 4,700 GSF Renovation: 40,290 GSF New Construction: 33,225 GSF Total Area: 73,515 GSF Estimated Cost: ECC: $38,429,809 ETPC: $49,958,712
Eli Whitney Street Arrowhead Lane F a l e s S c h
- l
Temporary Parking Temporary Parking
S T A I R S T A I R S T A I R K CR K CR K CR K CR K CR S P E D 1 CR 1 CR 1 CR 1 CR PR SM GP 1 CR 2 CR 2 CR PR 2 CR 2 CR SM GP 2 CR WK
MEDIA CENTER BELOW C A F E T E R I A B E L O W G Y M B E L O W S T A G E B E L O W A D M I N I S T R A T I O N B E L O W S E R V I C E B E L O WSTAIR S T A I R M E D I A C E N T E R S T A I R S T A I R SPED PR MECH ART MUSIC WK
CRAWL SPACE CRAWL SPACE L E V E L B E L O WCAFETERIA S T A I R K I T C H E N S T A G E A D M I N I S T R A T I O N GYM SERVICE S T A I R M A I N E N T R A N C E LOADING
EXIT TO PLAY AREA & FIELDSS T A I R
MEDIA CENTER BELOWS T A I R S T A I R S T A I R 3 CR 3 CR 3 CR 3 CR 3 CR PR
ROOF BELOW ROOF BELOW GYM BELOWSecond Floor First Floor Third Floor Fourth Floor