Annie E. Fales Elementary School Westborough, MA July 12, 2018 H - - PowerPoint PPT Presentation

annie e fales elementary school
SMART_READER_LITE
LIVE PREVIEW

Annie E. Fales Elementary School Westborough, MA July 12, 2018 H - - PowerPoint PPT Presentation

SCHOOL BUILDING COMMITTEE Annie E. Fales Elementary School Westborough, MA July 12, 2018 H M F H A R C H I T E C T S MSBA Module 3 Feasibility Study 3.1 Preliminary Design Program 3.2 MSBA Review of Preliminary Design Program


slide-1
SLIDE 1

Annie E. Fales Elementary School

Westborough, MA

July 12, 2018

H M F H A R C H I T E C T S SCHOOL BUILDING COMMITTEE

slide-2
SLIDE 2

MSBA Module 3 Feasibility Study

  • 3.1 Preliminary Design Program
  • 3.2 MSBA Review of Preliminary Design Program
  • 3.3 Preferred Schematic Report
  • 3.4 Approval to Proceed into Schematic Design

MSBA Module 4 Schematic Design

  • 4.1 Schematic Design Submittal
  • 4.2 MSBA Review and Approval of Schematic Design
slide-3
SLIDE 3

3.1 Preliminary Design Program

  • Educational Program
  • Initial Space Summary
  • Evaluation of Existing Conditions
  • Site Development Requirements
  • Preliminary Evaluation of Alternatives
  • Local Actions and Approvals
slide-4
SLIDE 4

3.1.6 Preliminary Evaluation of Alternatives

Accommodates 400 Students Supports Educational Program Goals Meets Code and Facility Condition Requirements Maximizes Land for program Uses Minimizes Impact on Classrooms During Construction Minimizes Impact on Site Use During Construction Construction Duration (in months) Estimated Construction Cost (in millions) Estimated Swing Space Cost (in millions) Estimated Project Cost (in millions)

OPTION 1A

New Construction

20 $33.7

  • $__

OPTION 1B

New Construction

20 $32.9

  • $__

OPTION 2

New Construction

20 $33.3

  • $__

OPTION 3A

New Construction

20 $33.2

  • $__

OPTION 3B

New Construction

20 $33.5

  • $__

OPTION 4

Renovation / Addition

30 $32.3 $3.1 $__ OPTION 5

Renovation Only

  • OPTION 6

No Build

  • Meets Criteria

Partially Meets Criteria Does Not Meet Criteria

slide-5
SLIDE 5

Option 1A

slide-6
SLIDE 6

Eli Whitney Street Arrowhead Lane F a l e s S c h

  • l

Enrollment: 400 Students Grades: K

  • 3rd

Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 68,735 GSF Total Area: 68,735 GSF Estimated Cost: ECC: $34,83,766 ETPC: $45,348,909

slide-7
SLIDE 7

Second Floor First Floor Third Floor

CAFETERIA STAIR K I T C H E N STAGE ADMINISTRATION G Y M S E R V I C E STAIR MECH STOR MECH STOR STOR MAIN ENTRANCE

3 R D L E V E L A B O V E

LOADING

EXIT TO PLAY AREA & FIELDS C A F E T E R I A B E L O W

STAIR

K I T C H E N B E L O W STAGE BELOW

MUSIC

G Y M B E L O W

STAIR

MECH BELOW 3 R D L E V E L A B O V E E X I T

ART O T P T

R O O F B E L O W

STAIR K CR STAIR

R O O F B E L O W

UPPER STUDENT ENTRANCE K CR K CR K CR K CR 1 CR 1 CR 1 CR 1 CR 1 CR 2 CR 2 CR 2 CR 2 CR 2 CR 3 CR 3 CR 3 CR 3 CR 3 CR MEDIA CENTER M S P R P R WK WK SPED SPED

slide-8
SLIDE 8

Option 1B

slide-9
SLIDE 9

Enrollment: 400 Students Grades: K

  • 3rd

Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 67,520 GSF Total Area: 67,520 GSF Estimated Cost: ECC: $34,113,396 ETPC: $44,347,415

Eli Whitney Street Arrowhead Lane F a l e s S c h

  • l
slide-10
SLIDE 10

Second Floor First Floor Third Floor

ADMINISTRATION MAIN ENTRANCE

C A F E T E R I A B E L O W

STAIR

STAGE BELOW G Y M B E L O W

STAIR

3 R D L E V E L A B O V E ROOF BELOW

MECH/ STOR MEDIA CENTER LOADING

E X I T T O P L A Y A R E A & F I E L D S

STAIR CAFETERIA K I T C H E N STAGE S E R V I C E STOR STOR STAIR MUSIC A R T O T P T G Y M

R O O F B E L O W MEDIA CENTER BELOW

STAIR STAIR K CR K CR K CR K CR K CR 1 CR 1 CR 1 CR 1 CR 1 CR 2 CR 2 CR 2 CR 2 CR 2 CR 3 CR 3 CR 3 CR 3 CR 3 CR M S P R P R WK WK SPED SPED LG GP

E X I T T O K P L A Y A R E A
slide-11
SLIDE 11

Option 2

slide-12
SLIDE 12

Enrollment: 400 Students Grades: K

  • 3rd

Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 68,120 GSF Total Area: 68,120 GSF Estimated Cost: ECC: $34,462,625 ETPC: $44,801,112

Eli Whitney Street Arrowhead Lane F a l e s S c h

  • l
slide-13
SLIDE 13

Second Floor First Floor Third Floor

CAFETERIA KITCHEN STAGE A D M I N I S T R A T I O N G Y M SERVICE S T A I R OT PT M A I N E N T R A N C E

3RD LEVEL ABOVE

L O A D I N G

EXIT TO PLAY AREA & FIELDS

S T A I R

STAIR E X I T

S T A I R MECH / STORAGE S T A I R

CAFETERIA BELOW STAGE BELOW GYM BELOW

M E D I A C E N T E R M U S I C A R T

STAIR

K C R S T A I R S T A I R K C R K C R K C R K C R 1 C R 1 C R 1 C R 1 C R 1 C R 2 CR 2 CR 2 CR 2 CR 2 CR 3 CR 3 CR 3 CR 3 CR 3 CR PR MS PR WK WK S P E D S P E D

E X I T
slide-14
SLIDE 14

Option 3A

slide-15
SLIDE 15

Enrollment: 400 Students Grades: K - 3rd Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 68,735 GSF Total Area: 68,735 GSF Estimated Cost: ECC: $34,396,047 ETPC: $44,714,861

Eli Whitney Street Arrowhead Lane F a l e s S c h

  • l

Temporary Parking

slide-16
SLIDE 16

Second Floor First Floor

CAFETERIA KITCHEN S T A G E ADMINISTRATION SERVICE STAIR O T P T MAIN ENTRANCE LOADING

E X I T T O P L A Y A R E A & F I E L D S

STAIR

S T A I R EXIT

MECH / STORAGE GYM M E D I A C E N T E R K C R K C R K C R K C R K C R 1 CR 1 CR 1 CR 1 CR 1 CR S P E D W K STAIR STAIR

S T A I R

MECH /STOR 3 CR S P E D 3 CR 3 CR 3 CR 3 CR WK MUSIC ART MS PR PR

G Y M B E L O W C A F E T E R I A B E L O W S T A G E B E L O W MEDIA CENTER BELOW

2 CR 2 CR 2 CR 2 CR 2 CR

ROOF BELOW
slide-17
SLIDE 17

Option 3B

slide-18
SLIDE 18

Enrollment: 400 Students Grades: K - 3rd Demolition: 50,690 GSF Renovation: 0 GSF New Construction: 69,055 GSF Total Area: 69,055 GSF Estimated Cost: ECC: $34,681,653 ETPC: $45,086,149

T e m p

  • r

a r y P a r k i n g

Eli Whitney Street Arrowhead Lane F a l e s S c h

  • l
slide-19
SLIDE 19

CAFETERIA KITCHEN S T A G E ADMINISTRATION SERVICE STAIR O T P T MAIN ENTRANCE LOADING

E X I T T O P L A Y A R E A & F I E L D S

STAIR

S T A I R EXIT

MECH / STORAGE GYM M E D I A C E N T E R K C R K C R K C R K C R K C R 1 CR 1 CR 1 CR 1 CR 1 CR S P E D W K STAIR STAIR

S T A I R

MECH /STOR 3 CR S P E D 3 CR 3 CR 3 CR 3 CR WK MUSIC ART PR

G Y M B E L O W C A F E T E R I A B E L O W S T A G E B E L O W MEDIA CENTER BELOW

2 CR 2 CR 2 CR 2 CR 2 CR

ROOF BELOW

PR MS

Second Floor First Floor

slide-20
SLIDE 20

Option 4

slide-21
SLIDE 21

Enrollment: 400 Students Grades: K - 3rd Demolition: 4,700 GSF Renovation: 40,290 GSF New Construction: 33,225 GSF Total Area: 73,515 GSF Estimated Cost: ECC: $38,429,809 ETPC: $49,958,712

Eli Whitney Street Arrowhead Lane F a l e s S c h

  • l

Temporary Parking Temporary Parking

slide-22
SLIDE 22

S T A I R S T A I R S T A I R K CR K CR K CR K CR K CR S P E D 1 CR 1 CR 1 CR 1 CR PR SM GP 1 CR 2 CR 2 CR PR 2 CR 2 CR SM GP 2 CR WK

MEDIA CENTER BELOW C A F E T E R I A B E L O W G Y M B E L O W S T A G E B E L O W A D M I N I S T R A T I O N B E L O W S E R V I C E B E L O W

STAIR S T A I R M E D I A C E N T E R S T A I R S T A I R SPED PR MECH ART MUSIC WK

CRAWL SPACE CRAWL SPACE L E V E L B E L O W

CAFETERIA S T A I R K I T C H E N S T A G E A D M I N I S T R A T I O N GYM SERVICE S T A I R M A I N E N T R A N C E LOADING

EXIT TO PLAY AREA & FIELDS

S T A I R

MEDIA CENTER BELOW

S T A I R S T A I R S T A I R 3 CR 3 CR 3 CR 3 CR 3 CR PR

ROOF BELOW ROOF BELOW GYM BELOW

Second Floor First Floor Third Floor Fourth Floor

slide-23
SLIDE 23