An Update to the Round Rock Campus Master Plan and FSS Services Eric Algoe Vice President for Finance and Support Services Nancy Nusbaum Associate Vice President for Finance and Support Services Planning Tom Shewan Associate Vice President


  1. An Update to the Round Rock Campus Master Plan and FSS Services Eric Algoe Vice President for Finance and Support Services Nancy Nusbaum Associate Vice President for Finance and Support Services Planning Tom Shewan Associate Vice President for Facilities Laurie Clouse Director of University Police

  2. University Master Plan

  3. Campus Services Building Avery Building houses Academic Affairs, Student Affairs and campus classrooms The Nursing Building is home of the St. David’s School of Nursing Willow Hall houses Communication Disorders, Physical Therapy and Respiratory Care Esperanza Hall will house Clinical Laboratory Sci, Health Admin, HIM and Radiation Therapy BRW Architects was engaged to provide a high- level space program, conceptual design and cost estimates for a Campus Support Services Building and (second) Central Utilities Plant

  4. Site Analysis

  5. Five sites were studied for the Site Analysis Support Services Building and a second Central Utility Plant Site Analysis Categories: • Quality of Campus • Vehicular Circulation • Geography • Infrastructure • Natural Features • Sensory | Experience

  6. Occupants in the Campus Services Building • Facilities with Conditioned and Unconditioned Warehouse/Receiving Space (relocate from Avery and Nursing) • University Police Department (relocate from Avery) • Parking Services (relocate from Avery) • Mail Services (new) • Environmental Health, Safety and Risk Management (new) • Information Technology (relocate from Nursing) • Office of Distance and Extended Learning (relocate from Nursing) • Shared space – lobby, reception, breakroom, copy room, conference (EOC), restrooms • Parking, loading dock, yard storage

  7. Site 1

  8. Site 2

  9. Site 3

  10. Site 4

  11. Site 5

  12. Site 5 Details Quality of Campus • Minimizes student and service vehicle cross traffic • Preserves character of the academic mall Vehicular Circulation • Close to existing roadways for distribution of goods and service • Close to existing pedestrian pathways Geography • Site supports building program plus 20% expansion • Site supports service vehicle maneuvering • Efficient land use Infrastructure • Close to existing utility systems (electric, water, natural gas, wastewater, storm water lines and communications) Natural Features • Minimal grade change (normal development costs) • Minimize environmental impacts Sensory | Experience • Warehouse portion will be visually shielded from student areas • Physically separated from existing or future student centric areas to control noise pollution from CUP2

  13. Conceptual View at Entry

  14. Renovation Plan to Relocate Other Health Profession Programs

  15. Avery Level 1

  16. Avery Level 1

  17. Avery Level 1

  18. Avery Level 2

  19. Avery Level 2

  20. Avery Level 2

  21. Avery Level 3

  22. Avery Level 3

  23. Avery Level 4

  24. Avery Level 4

  25. Nursing Level 1

  26. Nursing Level 2

  27. Nursing Level 3

  28. FSS at Round Rock

  29. Questions and Answers

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.