American American Council Council of of Engineering Companies En of Da Dallas Bob Bau Bob Baulsir lsir Vice President t of TEXR EXRail and Procurement t August t 24, 2015 } TOTAL COST: $999 million } Opening Day Stations: 10


slide-1
SLIDE 1

Bob Bau Bob Baulsir lsir Vice President t of TEXR EXRail and Procurement t August t 24, 2015

American American Council Council of

  • f

En Engineering Companies

  • f Da

Dallas

slide-2
SLIDE 2
slide-3
SLIDE 3

} TOTAL COST: $999 million } Opening Day Stations: 10 } Full Build Stations: 10 } Average Cost per station: $8.6 million } Cost per Mile: $36.7 million } Total Corridor Length: 27.2 miles

slide-4
SLIDE 4

Constr tructi tion $411M

Syste tems (Positive Train Control (PTC), Centralized Traffic Control (CTC) $51M Right t of Way Acquisiti tions $107M

Vehicles Vehicles $107M

Pr Professio fessiona nal l Se Servi vices s $109M Capita talized Fin Finan ance ce Cost $22M Conti tingency $192M

Project t Tota tal Cost t $999M $999M

slide-5
SLIDE 5

} Se

Servi vice Freque uenc ncy

  • AM Peak:

30-minute headways

  • PM Peak:

30-minute headways

  • Off-peak/weekends:90-minute headways (2018)
  • Off-peak/weekends:60-minute headways (2030)

} Da

Daily Train movements ts

  • 42 passenger trains a day (Full-Build)
  • Freight Service – 3 trains a week to be served during
  • ff-peak times
slide-6
SLIDE 6

} Travel Time:

  • End to end: 54 min. (NB) + 52 min. (SB) + Total Turnback time

30 min. = 136 min.

} Daily Ridership Projections:

  • 2014:

9,028 passengers/day

  • 2018:

10,018 passengers/day

  • 2035:

14,664 passengers/day

slide-7
SLIDE 7

By ¡Station: Parking ¡Spaces ¡ T&P ¡(Existing) 350 ITC ¡(Existing) 16 ¡-­‑ ¡Paid Northside 125 Beach ¡Street ¡ 312 Haltom ¡City 218

  • N. ¡Richland ¡Hills/Iron ¡Horse ¡

386

  • N. ¡Richland ¡Hills/Smithfield ¡

580 Grapevine/Main ¡Street 149 DFW ¡Airport ¡North 208 DFW ¡Airport ¡Terminal ¡A/B No

slide-8
SLIDE 8

} Awarded Parsons-Transystem contract for Final Design-

November 2014

} Awarded CMGC (pre-construction phase) contract to Archer

Western and Herzog – June 2015

} Awarded Vehicle Contract to Stadler Bussnang– June 2015 } Awarded EMF Design contract to Huitt Zollars - June 2015 } Full Funding Grant Agreement Award – Q1 2016 } Revenue Service – 2018

Project Status

slide-9
SLIDE 9

} FY16 New Starts rating Medium-High in February 2015 } Amended Record of Decision (ROD) received on April 2015 } FTA Permission to enter the Engineering Phase of the Project received

  • n June 2, 2015

} Parsons/TranSystems Final Design Schedule

  • 60% Design – June 30, 2015
  • 95% Design – September 15, 2015
  • IFC Design – November 2015

} The T has begun acquiring Real Estate for the Project

slide-10
SLIDE 10

} Q4 2015 – Complete Final Design } Q1 2016 – FFGA } Q1 2016 to Q3 2018 Construction } Q3/Q4 2018 Revenue Operations begin

slide-11
SLIDE 11

Ø Passenger Amenities

  • Canopy/shelter
  • Windscreens
  • Seating
  • Trash Receptacles
  • Landscaping
  • Signage
  • Ticket Vending
  • Lighting
  • Emergency Call Station
  • Security Cameras

Station Amenities

slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14

Terminal B Terminal A Terminal Connector The T Station DART Station Employee Drop-off Area

slide-15
SLIDE 15

Th The T, e T, Sta tadler s sig ign contr tract t for TEX EX Rail ve vehi hicles s

Officials of The T signed a contract with Stadler Bussnang AG for the manufacture and delivery of eight Diesel Multiple Unit (DMU) rail vehicles for the TEX Rail commuter system at a ceremony at The T’s Intermodal Transportation Center (ITC) on Tuesday

slide-16
SLIDE 16
slide-17
SLIDE 17

} Roomy design for even greater passenger

comfort.

} Comfortable ride } Low noise level } Double leaf swing-plug doors } Extendable platforms guarantee rapid and

comfortable passenger boarding even for people with disabilities, parents pushing strollers


slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21

Contact Information Bob Baulsir Vice President of Tex Rail and Procurement Fort Worth Transportation Authority bbaulsir@the-t.com