Los Angeles County Metropolitan Transportation Authority
Airport Metro Connector Neighborhood Council of Westchester/Playa - - PowerPoint PPT Presentation
Airport Metro Connector Neighborhood Council of Westchester/Playa - - PowerPoint PPT Presentation
Los Angeles County Metropolitan Transportation Authority Airport Metro Connector Neighborhood Council of Westchester/Playa July 2013 2 Airport Metro Connector Overview Crenshaw/LAX Project: Extends Metro Rail to Aviation and Century
2
Airport Metro Connector
Overview
- Crenshaw/LAX Project:
Ø Extends Metro Rail to Aviation and
Century Boulevards
Ø Provides foundation for connection to
LAX
- Airport Metro Connector Project:
Ø Goal – connect regional transit network
to LAX
Ø Long Range Transportation Plan
- Metro funding: $200 M (2008$)
- Opening Year: 2028, or earlier,
dependent upon airport contribution Airport Future Crenshaw/LAX & Metro Green Lines
3
Alternatives Recommended after the Alternatives Analysis
Direct LRT Branch Modified LRT Trunk (Through LAX)
- Extends Metro Green Line to LAX terminals
- Crenshaw/LAX passengers transfer to Metro Green Line
at Aviation/Century station
- Two or three stations in terminal area
- Both Metro Green and Crenshaw/LAX Lines serve the
LAX terminals
- One underground station in terminal area
Airport Metro Connector
4
Alternatives Recommended after the Alternatives Analysis (Continued)
Circulator (APM)
- Metro Rail passengers transfer to APM system at
Aviation/Century station
- Two or three stations in the terminal area
- INCLUDED AS PART OF SPAS PLAN
Circulator (BRT)
- Metro Rail passengers transfer to BRT system at
Aviation/Century station
- BRT uses existing roadway in terminal area with stops
at each terminal
- NOT ADOPTED IN SPAS PLAN UPDATES
Airport Metro Connector
Potential Transit Connection Locations Proposed by LAWA (12/12)
- Automated People Mover (APM) to connect the terminals and “off-airport” facilities
– Schedule and phasing to be determined
- Three potential locations for LRT / APM connections:
1. West of Sepulveda Boulevard within Central Terminal Area; 2. Intermodal Transportation Facility south of Parking Lot C; or 3. Future Crenshaw/LAX / Metro Green Line rail station at Aviation and Century Boulevards
5
6 Final EIS/EIR
Prepare Final EIS/R Confirm Funding for LPA Board Certifies EIS/ EIR Record of Decision/ Notice of Determination (NOD)
Detailed Engineering Construction Transit Service
Project Development Process
Future Phases Alternative Analysis (AA)
Initial Public Meetings Define Alternatives, Analyze and Screen Alternatives Preliminary Costs Foundation for Draft EIS/EIR
We Are Here
Draft EIS/EIR
Scoping Meetings Prepare Draft EIS/R Preliminary Funding Options Circulate Draft EIS/R & Public Hearings Select Locally Preferred Alternative (LPA)
7
Next Steps
Ø Complete technical studies Ø Preparation for start of environmental process Ø Prepare joint (Metro/LAWA) Request for FAA to initiate EIS Ø Coordinate with:
- LAWA
- FAA and FTA
- Local Cities and Stakeholders