Los Angeles County Metropolitan Transportation Authority Airport Metro Connector Neighborhood Council of Westchester/Playa July 2013 2 Airport Metro Connector Overview Crenshaw/LAX Project: Extends Metro Rail to Aviation and Century


slide-1
SLIDE 1

Los Angeles County Metropolitan Transportation Authority

Neighborhood Council of Westchester/Playa July 2013

Airport Metro Connector

slide-2
SLIDE 2

2

Airport Metro Connector

Overview

  • Crenshaw/LAX Project:

Ø Extends Metro Rail to Aviation and

Century Boulevards

Ø Provides foundation for connection to

LAX

  • Airport Metro Connector Project:

Ø Goal – connect regional transit network

to LAX

Ø Long Range Transportation Plan

  • Metro funding: $200 M (2008$)
  • Opening Year: 2028, or earlier,

dependent upon airport contribution Airport Future Crenshaw/LAX & Metro Green Lines

slide-3
SLIDE 3

3

Alternatives Recommended after the Alternatives Analysis

Direct LRT Branch Modified LRT Trunk (Through LAX)

  • Extends Metro Green Line to LAX terminals
  • Crenshaw/LAX passengers transfer to Metro Green Line

at Aviation/Century station

  • Two or three stations in terminal area
  • Both Metro Green and Crenshaw/LAX Lines serve the

LAX terminals

  • One underground station in terminal area

Airport Metro Connector

slide-4
SLIDE 4

4

Alternatives Recommended after the Alternatives Analysis (Continued)

Circulator (APM)

  • Metro Rail passengers transfer to APM system at

Aviation/Century station

  • Two or three stations in the terminal area
  • INCLUDED AS PART OF SPAS PLAN

Circulator (BRT)

  • Metro Rail passengers transfer to BRT system at

Aviation/Century station

  • BRT uses existing roadway in terminal area with stops

at each terminal

  • NOT ADOPTED IN SPAS PLAN UPDATES

Airport Metro Connector

slide-5
SLIDE 5

Potential Transit Connection Locations Proposed by LAWA (12/12)

  • Automated People Mover (APM) to connect the terminals and “off-airport” facilities

– Schedule and phasing to be determined

  • Three potential locations for LRT / APM connections:

1. West of Sepulveda Boulevard within Central Terminal Area; 2. Intermodal Transportation Facility south of Parking Lot C; or 3. Future Crenshaw/LAX / Metro Green Line rail station at Aviation and Century Boulevards

5

slide-6
SLIDE 6

6 Final EIS/EIR

Prepare Final EIS/R Confirm Funding for LPA Board Certifies EIS/ EIR Record of Decision/ Notice of Determination (NOD)

Detailed Engineering Construction Transit Service

Project Development Process

Future Phases Alternative Analysis (AA)

Initial Public Meetings Define Alternatives, Analyze and Screen Alternatives Preliminary Costs Foundation for Draft EIS/EIR

We Are Here

Draft EIS/EIR

Scoping Meetings Prepare Draft EIS/R Preliminary Funding Options Circulate Draft EIS/R & Public Hearings Select Locally Preferred Alternative (LPA)

slide-7
SLIDE 7

7

Next Steps

Ø Complete technical studies Ø Preparation for start of environmental process Ø Prepare joint (Metro/LAWA) Request for FAA to initiate EIS Ø Coordinate with:

  • LAWA
  • FAA and FTA
  • Local Cities and Stakeholders