Los Angeles County Metropolitan Transportation Authority Airport Metro Connector Neighborhood Council of Westchester/Playa July 2013 2 Airport Metro Connector Overview Crenshaw/LAX Project: Extends Metro Rail to Aviation and Century


  1. Los Angeles County Metropolitan Transportation Authority Airport Metro Connector Neighborhood Council of Westchester/Playa July 2013

  2. 2 Airport Metro Connector Overview • Crenshaw/LAX Project: Ø Extends Metro Rail to Aviation and Century Boulevards Ø Provides foundation for connection to Airport LAX • Airport Metro Connector Project: Ø Goal – connect regional transit network Future to LAX Crenshaw/LAX Ø Long Range Transportation Plan & Metro Green Lines • Metro funding: $200 M (2008$) • Opening Year: 2028, or earlier, dependent upon airport contribution

  3. 3 Alternatives Recommended after the Alternatives Analysis Direct LRT Branch Modified LRT Trunk (Through LAX) • Extends Metro Green Line to LAX terminals • Both Metro Green and Crenshaw/LAX Lines serve the • Crenshaw/LAX passengers transfer to Metro Green Line LAX terminals at Aviation/Century station • One underground station in terminal area • Two or three stations in terminal area Airport Metro Connector

  4. 4 Alternatives Recommended after the Alternatives Analysis (Continued) Circulator (APM) Circulator (BRT) • Metro Rail passengers transfer to APM system at • Metro Rail passengers transfer to BRT system at Aviation/Century station Aviation/Century station • Two or three stations in the terminal area • BRT uses existing roadway in terminal area with stops at each terminal • INCLUDED AS PART OF SPAS PLAN • NOT ADOPTED IN SPAS PLAN UPDATES Airport Metro Connector

  5. Potential Transit Connection Locations 5 Proposed by LAWA (12/12) • Automated People Mover (APM) to connect the terminals and “off-airport” facilities – Schedule and phasing to be determined • Three potential locations for LRT / APM connections: West of Sepulveda Boulevard within Central Terminal Area; 1. Intermodal Transportation Facility south of Parking Lot C; or 2. Future Crenshaw/LAX / Metro Green Line rail station at Aviation and Century 3. Boulevards

  6. 6 Project Development Process Transit Service Alternative Analysis Construction Detailed (AA) Engineering Initial Public Meetings Final EIS/EIR Define Alternatives, Analyze and Screen Alternatives Preliminary Costs Foundation for Draft EIS/EIR Prepare Final EIS/R We Are Here Confirm Funding for LPA Draft EIS/EIR Board Certifies EIS/ EIR Scoping Meetings Prepare Draft EIS/R Record of Decision/ Notice of Preliminary Funding Options Determination (NOD) Circulate Draft EIS/R & Public Hearings Future Phases Select Locally Preferred Alternative (LPA)

  7. 7 Next Steps Ø Complete technical studies Ø Preparation for start of environmental process Ø Prepare joint (Metro/LAWA) Request for FAA to initiate EIS Ø Coordinate with: • LAWA • FAA and FTA • Local Cities and Stakeholders

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.