aicrp on goat improvement
play

AICRP on Goat improvement Name of the unit Annual Report Year - PowerPoint PPT Presentation

AICRP on Goat improvement Name of the unit Annual Report Year 2015-16 Name of PI, Affiliation Clusters & Goat keepers Sr. Cluster Area Villages No. of House hold / No. of Goats No Family / Farmer April 01, 2015 March 31, 2016


  1. AICRP on Goat improvement Name of the unit Annual Report Year 2015-16 Name of PI, Affiliation

  2. Clusters & Goat keeper’s Sr. Cluster Area Villages No. of House hold / No. of Goats No Family / Farmer April 01, 2015 March 31, 2016 Village 1 1. Village 2 Village 1 2. Village 2 Village 1 3. Village 2 Village 1 4. Village 2

  3. Farmer’s Distribution No. of farmers Name of Villages Tribal Women Headed Landless Small Medium

  4. Description of Natural Habitat  Temperature • Location Map  Rain Fall  Biomass • Breed Picture

  5. Production System Characterization

  6. Flock Dynamics Year Initial Adult No. of Kids No. of Kids No. of Animal Population Doe born died Growth (%) Sold 2012-2013 2013-2014 2014-2015 2015-2016

  7. Body Weight Growth Weight at (Kg) Year of Birth Birth 3 mo 6 mo 9 mo 12 mo Base Year 2013-14 2014-15 2015-16 Overall * Least squares mean ± SE & observations *overall mean of previous three years.

  8. Growth Performance last 3 year • 2013-14 • 2014-15 5 • 2015-16 4.5 4 3.5 3 Series 1 2.5 Series 2 2 Series 3 1.5 1 0.5 0 Category 1 Category 2 Category 3

  9. Milk Production Performance Locational traits 90 Days (L) LMY (L) LL (Days) Base Year 2013-14 2014-15 2015-16 Overall* Least squares mean ± SE & observations *overall mean of previous three years.

  10. Milk yield last 3 year • 2013-14 • 2014-15 5 • 2015-16 4 3 Series 1 Series 2 2 Series 3 1 0 Category 1 Category 2 Category 3

  11. Reproduction Performance S. No Particulars 2015-16 1 No. of available does for breeding 2 No. of does available for kidding 3 Does Kidded Single Twine Triplet More > 3 4 No. of abortion 6 Actual live birth 7 Kidding (%) 8 Kidding Rate ( Liter Size )

  12. Selection Differential Traits Parameter Population mean Difference Dam’s Milk Yield @ selected male 90 days 6/9 month body individual weight No. of kids Intensity of Particulars No. selected Remarks monitored selection Male female Overall Least square mean along with no. of observation is required

  13. Bucks Distribution Sr. Cluster Villages Bucks Bucks Bucks Total No Area already distributed Withdrawn/ available Exchanged 1. Village 1 Village 2 2. Village 1 Village 2 3. Village 1 Village 2 4. Village 1 Village 2 Overall

  14. Mortality for the year ________ Particulars 0-3M 3-6M 6-12M Adult Overall No. of animals available No. of animals died Mortality (%) Year 2013-14 2014-15 2015-16 Flock Strength Goat Died Mortality (%)

  15. Cause of Morbidity Sl. No Cause of Morbidity 0-3M 3-6M 6-12M Over 1 Yr. Total No. Percentage Colibacillosis Pnemo-Enterities Coccidiosis Pneumonia NAD/ Gen. weakness Toxaemia/ Acidosis Predation Putrified Haemorrhage/ Shock Gid Liver abscess Total

  16. Activity / Capacity building • Training conducted Place Sl. Name/number Date Period No. of Remarks no of Training From to beneficiaries programme • Training impact

  17. Activities Carried Out Activities No./Name Technology developed Technology Demonstrated Technology transfer and validation in field flock Good Practices including ITK Linkage Developed (Self Help Group, Goat Cooperatives, Status or efforts in development of market infrastructure Success stories Goat Fair/exhibition performed Leaflet and other documents Package of practices

  18. Income & Profits • From milk • Meat • Fiber • Manure

  19. Targets & Achievements Target for the Achievement Remarks (if year any) Coverage of New Adult 250 doe New Buck Distribution 10 No. of does serviced 700 Health Management Practices ( Vaccination etc.) 2000 Capacity Building 250 Income Enhanced 5% per year

  20. Impact of the project • on Population growth • on body weight growth • on Reproduction • on Milk production • on income of the farmer • Any other

  21. Salient Achievement • 5-6 Bullet point

  22. Budget Utilization Opening Balance RE Total Expenditure Closing Balance (A) Capital Work Equipment (B)Estt. Charges (C) General TA Contingency Total (A+B+C ) Percentage of Total Fund Utilization

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend