Ac ade my Distric t 20 T ranspo rtatio n GROWT H AND CAPI T AL - - PowerPoint PPT Presentation

ac ade my distric t 20 t ranspo rtatio n
SMART_READER_LITE
LIVE PREVIEW

Ac ade my Distric t 20 T ranspo rtatio n GROWT H AND CAPI T AL - - PowerPoint PPT Presentation

Ac ade my Distric t 20 T ranspo rtatio n GROWT H AND CAPI T AL NE E DS COMMI T T E E 2015-2016 T he Driving F o rc e to E duc atio n F ac ts: E mplo ye e s 222 Ro ute s Ge ne ral E duc atio n 77 Spe c


slide-1
SLIDE 1

Ac ade my Distric t 20 T ranspo rtatio n

GROWT H AND CAPI T AL NE E DS COMMI T T E E 2015-2016

slide-2
SLIDE 2

T he Driving F

  • rc e to E

duc atio n

 F

ac ts:

E

mplo ye e s 222

Ro ute s Ge ne ral E

duc atio n 77

Spe c ial Ne e ds

47

Ye llo w Buse s

155

White Buse s

5

E

xc ursio ns and Vans 8

Suppo rt Ve hic le s

28

slide-3
SLIDE 3

Parking L

  • t is full….staff spill
  • ve r to the parking by the

ware ho use .

slide-4
SLIDE 4

Ve hic le s park in the g rass—mo re

park he re whe n it is dry.

slide-5
SLIDE 5

Bus lo t be hind the parking lo t is full…

F ive g e n-e d buse s o n the c urb F ive white ac tivity buse s

  • n the c urb

No plac e to push the sno w

slide-6
SLIDE 6

We share the lo t with the Ware ho use , So de xo , and pro g rams ho using stude nts in the mo dular.

slide-7
SLIDE 7

Bac k o f the lo t to the fro nt

slide-8
SLIDE 8

Bus lo t be hind the ware ho use . Also full.

slide-9
SLIDE 9

Ravine runs be hind the parking lo t, limiting ability to e xpand.

slide-10
SLIDE 10

L

  • o king to the no rth is five

ac re s be lo ng ing to the distric t

slide-11
SLIDE 11

F ac ility do e s no t ac c o mmo date 222 e mplo ye e s

 F

ac ility and Parking lo t built in 1986

 Offic e spac e is limite d—20Ride Offic e adde d 3

ye ars ag o —use d sto rag e ro o m

 No me e ting ro o ms fo r CDE

re quire d in-se rvic e — using a se parate mo dular fo r ne w training , CPR and F irst Aid c lasse s

 Bre ak Ro o m will no t ac c o mmo date all

e mplo ye e s

 Bathro o ms have 4 stalls fo r wo me n and two stalls

and two urinals fo r me n—waiting line s during the he avie st traffic le ave and re turn time s

 Me c hanic s have o ne bathro o m and c hang ing are a

slide-12
SLIDE 12

Carpe ting is staine d and 17 ye ars

  • ld.
slide-13
SLIDE 13

T ile —mismatc he d, to o o ld to find any matc hing tile .

slide-14
SLIDE 14

T ile with asbe sto s bac king c o nstantly ne e ds re pair. (29

ye ars o ld)

L arg e Co sts inc urre d with fe de ral re quire me nts fo r training .

slide-15
SLIDE 15

Bus Re plac e me nt Sc he dule

 Plan re quire s purc hasing 10-11 buse s pe r ye ar in o rde r

to have no buse s o ve r 15 ye ars o ld afte r e ig ht ye ars

 Curre ntly have 31 buse s o ve r 15 ye ars o ld  35 buse s have be e n purc hase d in the last fo ur ye ars.

T he purc hase o f 42 buse s wo uld have ke pt us in line with the re plac e me nt sc he dule .

 I

f o nly 9 buse s are purc hase d pe r ye ar the n we will always have 20 buse s o ve r 15 ye ars o ld

 I

f we e xpe rie nc e g ro wth in transpo rtatio n, o lde r buse s will ne e d to be ke pt to me e t the de mand

 Re plac e all buse s o ve r 15 ye ars o ld: $3,200,000  Co st to maintain sc he dule plus o ne fo r g ro wth o f

stude nts pe r ye ar—$1,340,000 pe r ye ar

slide-16
SLIDE 16

Building Ne e ds

 Additio nal training ro o ms—larg e e no ug h to

ac c o mmo date 200 e mplo ye e s with ability to divide into smalle r individual c lasse s

 E

quip with kitc he n fo r me e ting s and e mplo ye e s that stay all day

 Additio nal bathro o ms  Stand alo ne bus wash to pre pare fo r using

e xisting wash bays fo r re pair bays: $110,000

slide-17
SLIDE 17

Building Ne e ds, Co ntinue d

 Bac k up dispatc h c e nte r  Po ssible split be twe e n Spe c ial Ne e ds and

Ge ne ral E duc atio n—o ffic e s and training

 Co st E

stimate : $2.4 Millio n

 Re no vate e xisting fac ility, abate asbe sto s: Co st

E stimate : $200,000

slide-18
SLIDE 18

Came ra and GPS Re plac e me nt Plan

 Came ras we re purc hase d fo r all buse s in 2009  We are c urre ntly in ne e d to start a re plac e me nt

  • plan. We wo uld like to re plac e 30 c ame ras pe r

ye ar.

 Co st fo r c ame ra re plac e me nt plan--$48,000 pe r

ye ar

 Co st fo r GPS re plac e me nt plan--$23,000 pe r

ye ar

slide-19
SLIDE 19

Parking L

  • t Co nc e rns

 I

nc re ase parking fo r buse s and e mplo ye e s de spe rate ly ne e de d

 Parking lo t ne e ds to be re pave d and e le c tric al

po we r to e ve ry bus fo r plug in during c o ld te mpe rature s

 Additio nal lig hting fo r safe walking to buse s  Ne e d additio nal e xit to Wo o dme n—o ne e xit has

c o nc e rns whe n inte rse c tio n is c lo se d. T his has happe ne d thre e time s this last c ale ndar ye ar. T he last e piso de c ause d o ur buse s to be stuc k in the lo t. $150,000

 Auto matic g ate fo r inc re ase d se c urity—$20,000

slide-20
SLIDE 20

5 Ac re E xpansio n

Parking with e le c tric fo r

buse s

Parking fo r e mplo ye e s F

e nc ing and lig hting

Co st e stimate : 2,000,000

slide-21
SLIDE 21

Co nc lusio n

We have be c o me the larg e st transpo rtatio n

de partme nt in the Co lo rado Spring s are a e mplo ying appro ximate ly 220. Ne xt in c o mpariso n is D11 with 155.

Ge ne ral e duc atio n buse s are c ro wde d Cho ic e use inc re asing Spe c ial ne e ds (Re quire d by law) Spe c ial Pro g rams in and o utside o f the

distric t—ve ry fe w are buse d to the ir ho me sc ho o l.

Ho me le ss and F

  • ste r familie s (Re quire d by

law)

E

L L (Re quire d by law)

slide-22
SLIDE 22

Co nc lusio n, c o ntinue d

 Gro wth is c atc hing up with T

ranspo rtatio n!!

 We Ne e d yo ur he lp to maintain a ste llar se rvic e

and suppo rt the sc ho o l distric t.

 Re c urring bus re plac e me nt, c ame ra/ GPS c o sts:

$1,411,000

 Building , parking lo t, bus wash, and re no vatio ns:

$7,930,000

slide-23
SLIDE 23

Co nc lusio n, Co ntinue d

Que stio ns?