ABINGDON ELEMENTARY v SCHOOL PFRC MEETING #2 Agenda 01 Project - PowerPoint PPT Presentation

NOVEMBER 19, 2014 ABINGDON ELEMENTARY v SCHOOL PFRC MEETING #2 Agenda 01 Project Updates 02 Historic Preservation 03 Toole Multimodal Transportation Study 04 Site Design Options/ Community Feedback 05 Next Steps PROJECT UPDATES 3


  1. NOVEMBER 19, 2014 ABINGDON ELEMENTARY v SCHOOL PFRC MEETING #2

  2. Agenda 01 Project Updates 02 Historic Preservation 03 Toole Multimodal Transportation Study 04 Site Design Options/ Community Feedback 05 Next Steps

  3. PROJECT UPDATES 3

  4. PROJECT MILESTONES: • Construction Documents – December 2015 • Concept Design Submission to APS Board - Information – Feb 5, 2015 • Building Permit – February 2016 • Concept Design Submission to APS Board - Approval – Feb 19, 2015 • Bidding – March 2016 • Schematic Design – April 15, 2015 • Construction – April 2016 • Design Development – July 15, 2015 • Occupancy – September 2017 • Use Permit – September 2015 4 OVERALL PROJECT SCHEDULE

  5. September O ctober November December January F ebruary March BL BLPC PC 18 2 16 6 20 16 3 17 3 17 30 28 PFRC RC 15 19 17 21 18 18 APS BD APS BD * 5 19 14 PT PT A/ A/C C o omm 30 * Joint School and County Board Site R eview project kickoff meeting P rogram R eview C oncept Design Schematic Design 5 BLPC & PFRC SCHEDULE

  6. Upc pcoming ng PFRC M Meetings ngs: Dec ecem ember er 1 17th PFRC M Meet eeting Januar anuary 2 21st PFRC Meet M eeting Febr bruar uary 1 18th h PFRC C Meet eeting Mar arch 1 h 18th h PFRC M Meet eeting Apr pril 1 15th h PFRC Meet M eeting Ap April T TBD BD C ommuni unity G G allery W al Wal alk May ay 2 20th h PFRC Meet M eeting O ne ne P PFRC meeting i ng in n Jul uly and o and one ne in n O ctobe ber / / N Novembe ber Pre C ons nstruc uction C n C ommuni unity m meeting ng 6 PFRC MEETINGS

  7. BLPC PC – Building B ilding Block G ck Group up Exercise ercise 7 BLPC MEETINGS

  8. Hord Coplan Macht’s Baltimore Location Historic Preservation 8

  9. ARCHEOLOGI CHEOLOGICAL S CAL STUDY UDY – Pres Present Day Aeri Day Aerial 9

  10. ARCHEOLOGI CHEOLOGICAL S CAL STUDY UDY – 1945 T 5 Topogra pographic M phic Maps ps Abingdon ES Property 10

  11. ARCHEOLOGI CHEOLOGICAL S CAL STUDY UDY – 1871 T 1 Topogra pographic M phic Map Abingdon ES Property 11

  12. ARCHEOLOGI CHEOLOGICAL S CAL STUDY UDY – 1950 1950s Aeri Aerial of of Par Park Shirlingto irlington 12

  13. ARCHEOLOGI CHEOLOGICAL S CAL STUDY UDY – Archeo heologist logist P Prese sentatio ntation t n to Students udents 13

  14. Hord Coplan Macht’s Baltimore Location MULITMODAL TRANSPORATION STUDY 14

  15. Hord Coplan Macht’s Baltimore Location SITE DESIGN OPTIONS/ COMMUNITY FEEDBACK 15

  16. HCM HCM SITE SITE OPT OPTION A A – POSITIVE COMMENTS • Green Space • Preserves green space and playing field. • Important that it keeps actual green space next to tennis court. • Multimodal Transportation • Helps relieve parking issue in a less disruptive way. • Like dual access/Improved flow of traffic into the school. • Like parking + drop off access from 31 st Street • Potential for teaching opportunity with stormwater management area OPTION A: • Best option for Fairlington residents, Green area is Main addition at saved. Parking on 31 st Street is great. front: • Building / Program Spaces 3-story CR wing • • Provides a nice entrance to the school. New cafeteria • • Like the addition at the front of the school. New Entry/Admin • • Expansion of cafeteria is positive. Gym expansion in • Good view for new cafeteria - overlooking the hill. back • Consider putting cafeteria above the gym (Gym at field level, allow more space for classrooms, etc.) 2 nd access off 31 st St. 16 COMMUNITY FEEDBACK 116 parking spaces

  17. HCM HCM SITE SITE OPT OPTION A A – NEGATIVE COMMENTS • Green Space • Insufficient trees and green space between school and community. • Loss of field space. • Negative impact on the existing trees. • Multimodal Transportation • Too much parking on site • Too little parking/in front • Car drop-off on 31st Street difficult especially in the morning during morning rush-hour with buses and OPTION A: commuters Main addition at • Courtbridge entrance blocked front: • Building / Program Spaces 3-story CR wing • • 3-story should be at the back of the school so as not to change the aesthetics of the surrounding community New cafeteria • • Gym too far from field. New Entry/Admin • • Cafeteria used as an overflow for gym – too far away Gym expansion in from gym. back • Cafeteria is too close to hill. Tree cover on hill 2 nd access off 31 st essential for area. St. • Concerned about Cafeteria creating soil erosion on the 17 COMMUNITY FEEDBACK 116 parking spaces school and neighborhood property. • Loss of view toward Ballston from 30 th Road

  18. HCM SITE HCM SITE OPT OPTION A A – NEGATIVE COMMENTS POSITIVE COMMENTS • Most green space • Parking lot still has bottleneck (perhaps preserved. switch with field like • Like parking in back / Option C) second entrance • Gym needs to be near • Nice spread of new field construction • Cafeteria needs to be • New place for cafeteria near playground and gym • Not a lot of extra • Most pleasing design. classroom space OPTION A: Main addition at front: 3-story CR wing • New cafeteria • New Entry/Admin • Gym expansion in back 2 nd access off 31 st St. 18 FACULTY FEEDBACK 116 parking spaces

  19. HCM HCM SITE SITE OPT OPTION B B – POSITIVE COMMENTS • Green Space • Maintains existing field and green space remains. • Best compromise between new additions and impacts to neighbors and green space / trees. • Multimodal Transportation • Like new entry to parking lot off 29 th St. • Helps relieve parking in less disruptive way. • Like new traffic pattern for drop-off and better entry to school. • Building / Program Spaces OPTION B: • Like that this seems to have less disruption overall. Main addition at • Minimizes impact to current façade back: • Keeps aesthetics of the community in place 3-story CR wing • • Good mix of construction at front of building & back of Expanded Gym • school. Learning • • 3-story classroom addition at back is a good idea. Courtyard • Leverages underutilized space in back. Admin addition at • Like outdoor classroom next to gym. front Emerg. access off 19 COMMUNITY FEEDBACK 31 st St. 105 parking spaces

  20. HCM HCM SITE SITE OPT OPTION B B – NEGATIVE COMMENTS • Green Space • Need more green space between parking lot and community. • Loss of open space. • Ask parks to deed all of Fort Reynolds to APS allowing the school to expand in that direction. • Multimodal Transportation • Does not improve traffic flow • Not sure if this version gives the school a OPTION B: ‘proper’ sense of arrival. Main addition at • Building / Program Spaces back: • Why not build up instead of back? 3-story CR wing • • Don’t like the addition at the back. Expanded Gym • • Dislike separation of gym from field. Learning • • Cafeteria expansion seems too small/Doesn’t Courtyard help situation • Placement of geothermal facilities may have an Admin addition at impact to building that sits on a hill. front Emerg. access off 20 COMMUNITY FEEDBACK 31 st St. 105 parking spaces

  21. HCM HCM SITE SITE OPT OPTION B B – NEGATIVE COMMENTS POSITIVE COMMENTS • Extra parking • Parking Bottleneck • No 3-Story • Like 3-Story classroom addition • Cafeteria too far from • Expansion of gym playground • Outdoor classroom • More classroom space needed • Extra classroom space OPTION B: Main addition at back: 3-story CR wing • Expanded Gym • Learning • Courtyard Admin addition at front Emerg. access off 21 FACULTY FEEDBACK 31 st St. 105 parking spaces

  22. HCM HCM SITE SITE OPT OPTION C C – POSITIVE COMMENTS • Green Space • Like smaller field size and location so it can be seen from the school. • Increased play area in back. • Multimodal Transportation • Parking lot makes easy drop-off / pick-up. • Better parking flow and no bottleneck at end of cul-de- sac. • Like separation of the parking lot from the school. • Good traffic flow, most building in one place. OPTION C: • Staff and community parking spaces are adequate. Main addition at • Building / Program Spaces front: • Welcoming front entry / administration / new classrooms. 3-story CR wing • • Addition at the front adds to the visual look of the New Gym • school. New entry/admin • • 3-story classrooms a good idea. Demolish ex. Gym • Like having everything up front as long as trade-off of gym demo doesn’t prevent work on needed improvements. Emerg. access off • Easy access from gym to field. Gym accessible for 31 st St. community events 115 parking spaces 22 COMMUNITY FEEDBACK

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.