SLIDE 20 Next Steps – Measured Approach
‐ MI MILEST STONE: ONE: Upper Upper Dublin ublin To Township Consi Consider er Acti Action
to Ex Execut ecute Cam Camp Hill ill Rd Rd & Virgin inia ia Dr Dr TE TE‐160 160 Fo Form to to Authoriz Authorize In Installa latio tion of
New Tr Traffic Si Signal nal g ‐ Upon Upon Authoriz Authorization, ion, Fo Formalize the the Signaliz Signalized In Intersectio tion Concep Concept and and Submit Submit fo for PennD nnDOT Review view (Assum (Assumed 1 Mo Mont nth Dur Duration)
Mo Mont nth Dur Duration)
‐MI MILEST STONE: ONE: Response sponse fr from PennDO nnDOT with th either either Concurr Concurrence nce or
quired additional additional To Township coor
dination. tion. (A (Assumed 3 Mo Mont nth Dur Duration)
(A (Assumed 3 Mo Mont nth Dur Duration)
‐ Upon Upon co consensus, Desi Design gn and and Pre Prepare Tr Traffic Signal Signal Cons Construction truction Plans Plans wi with PennDO nnDOT Appr Approval al (Assum (Assumed 6 Mo Mont nth Dur Duration/
Construct truct Signal Signal (Assum (Assumed 4 Mo Mont nth Dur Duration)
Dur Duration/
Construct truct Signal Signal (Assum (Assumed 4 Mo Mont nth Dur Duration)
‐ Mo Monitor tor Tr Traffic Vo Volumes/Distribution at at Pinet Pinetown wn Ro Road & Hi Highl ghland nd Av Avenue (Assum (Assumed 3 Mo Mont nth Dur Duration)
1 In In the the Me Meantime me En Enforce In Intersectio tion Sigh Sight Triang iangle le & Im Improve AD ADA Conditions Conditions
In the the Me Meantime me, En Enforce In Intersectio tion Sigh Sight Triang iangle le & Im Improve AD ADA Conditions Conditions 2.
Update Tr Traffic Signal Signal Wa Warrant Anal Analysis 3.
Review if if Land Land Developmen Development is is submit submitted fo for an any GFW GFW pr properties
that wo would im impac pact the the in intersec ectio tion ‐ MI MILEST STONE ONE – U – Upon cons nstruction truction of
Camp Hill ill & Virgin inia ia signal signal and and Re Revised Anal Analysis of
Pinetown wn & Hi Highl ghland, nd, submit submit the the TE TE‐160 160 Fo Form fo for action action to to ins install all new new signal.
(See abo above fo for Assum Assumed Dur Durations)
5/12/2020 UPPER DUBLIN TOWNSHIP 20