2 nd TSDSI- TEPC Workshop on Standardisation for Developing Countries The Ashok, New Delhi 10 February 2020 5G Rollout and Strategies in Selected Developing Countries by Andreas Sommer Senior Technical Advisor India -EU Cooperation


slide-1
SLIDE 1

2nd TSDSI-TEPC Workshop on “Standardisation for Developing Countries” The Ashok, New Delhi 10 February 2020

5G Rollout and Strategies in Selected Developing Countries by Andreas Sommer

Senior Technical Advisor “India-EU Cooperation on ICT-Related Standardisation, Policy and Legislation”

slide-2
SLIDE 2

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : So South Afr fric ica

Workshop on Standardisation for Developing Countries 10-02-2020

slide-3
SLIDE 3

Workshop on Standardisation for Developing Countries 10-02-2020

Challenges:

  • Spectrum Availability and Allocation

Option under Discussion: Wholesale Wireless Open Access Network (WOAN)

  • Policies Implementation
  • Skill Development
  • Business Cases / Special Use Cases (e.g. Mining Industry)

Corporate (Private) ”5G for Industry” Networks incl Specific Policies (supported by EU)

  • Affordable Devices
  • Infrastructure Rural Areas

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : So South Afr fric ica

slide-4
SLIDE 4

Workshop on Standardisation for Developing Countries 10-02-2020

Challenges Infrastructure Rural Areas (1): Potential 5G Mobile Operators:

  • Vodacom, MTN, Telkom SA, Cell C

5G Fixed-Wireless Operators:

  • Rain (3.6GHz Band), Comsol (28GHz Band)

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : So South Afr fric ica

slide-5
SLIDE 5

Workshop on Standardisation for Developing Countries 10-02-2020

Challenges Infrastructure Rural Areas (2):

  • Remote Infrastructure

Costs, Land Ownership, “Right of Way”, Permissions, Infrastructure Sharing

  • Regular Power Outages (“Load Shedding”)
  • Cable, Batteries, Diesel and Equipment Theft
  • Vandalism, Sabotage
  • Protests of Population (Radiation, Land Ownership)
  • Maintenance

Exchange of Batteries, Diesel Supply, Cleaning Solar Panels

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : So South Afr fric ica

slide-6
SLIDE 6

Workshop on Standardisation for Developing Countries 10-02-2020

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : Nort rth Macedonia ia

slide-7
SLIDE 7

Workshop on Standardisation for Developing Countries 10-02-2020

Challenges:

  • National ICT Strategy 2020-2025 (supported by EU)
  • 5G Planning And Rollout through SoE
  • Infrastructure Rural Areas
  • Operations and Maintenance
  • Skill Availability and Development

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : Nort rth Macedonia ia

slide-8
SLIDE 8

Workshop on Standardisation for Developing Countries 10-02-2020

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : Co Cook Isla Islands (P (Pacif ific ic Isla Island)

slide-9
SLIDE 9

Workshop on Standardisation for Developing Countries 10-02-2020

“Manatua” Submarine Cable (3,700 km) Samoa – Niue – Cook Islands (Aitutaki and Rarotonga) – French Polynesia (Bora Bora and Tahiti) – RfS: mid of 2020 Financing through Asian Development Bank (ADB), European Investment Bank (EIB) / Agence Française de Développement (AFD), and Government of New Zealand (MFAT) The cable system was only feasible jointly through collaboration of the small islands.

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : Co Cook Isla Islands (P (Pacif ific ic Isla Island)

slide-10
SLIDE 10

Workshop on Standardisation for Developing Countries 10-02-2020

Challenges:

  • Very Remote, Typhoons / Cyclones
  • International Connectivity

Redundancy / Backup for Single Submarine Cable, Capacity, Latency, Costs

  • Connectivity “Outer Islands” (Remote Islands)

Maintenance and Repairs, Power Supply

Solutions: 5G for Satellite, Involve Local Communities

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies Use se Ca Case: : Co Cook Isla Islands (P (Pacif ific ic Isla Island)

slide-11
SLIDE 11

Workshop on Standardisation for Developing Countries 10-02-2020

Recommendation:

According UN actual about 3.5 billion people globally have no access to the Internet. Developing Countries need to collaborate and jointly identify their specific requirements (e.g. for Rural / Remote Areas) in short time, and address them to 3GPP to be considered for global 5G standardization and future mobile technologies. For having a strong voice, collaborate with bigger Developing Countries such as Argentina, Brazil, Chile, Egypt, Indonesia, Kenya, Mexico, Philippines, Nigeria, South Africa, Thailand, Vietnam and the Pacific Islands Telecom Association (PITA) for specific needs of islands and remote islands.

5G Roll llout and St Strategie ies in in Se Selec lected Develo lopin ing Co Countrie ies

slide-12
SLIDE 12

Thank You

Workshop on Standardisation for Developing Countries 10-02-2020

Andreas Sommer SEC-Sommer Engineering And Consulting South Africa and Germany a.sommer@sec-sommer.com http://www.sec-sommer.com http://www.indiaeu-ictstandards.in