2045 Long Range Transportation Plan Update FABRIKAM RESIDENCES Needs - - PowerPoint PPT Presentation

2045 long range transportation plan update
SMART_READER_LITE
LIVE PREVIEW

2045 Long Range Transportation Plan Update FABRIKAM RESIDENCES Needs - - PowerPoint PPT Presentation

2045 Long Range Transportation Plan Update FABRIKAM RESIDENCES Needs Presentation TAC/CAC and TPO Board March 2020 Agenda Where We Are Summary of Stakeholder and Public Outreach Draft Needs List Revenue Forecast Next Steps


slide-1
SLIDE 1

FABRIKAM RESIDENCES

2045 Long Range Transportation Plan Update

Needs Presentation TAC/CAC and TPO Board March 2020

slide-2
SLIDE 2

Agenda

  • Where We Are
  • Summary of Stakeholder and Public Outreach
  • Draft Needs List
  • Revenue Forecast
  • Next Steps

Space Coast TPO | 2045 Long Range Transportation Plan Update 2

slide-3
SLIDE 3

Where We Are

Space Coast TPO | 2045 Long Range Transportation Plan Update 3

We Are Here

slide-4
SLIDE 4

Stakeholder & Public Meeting Summary

slide-5
SLIDE 5

Stakeholder Meetings

  • Purpose: Review and Identify Needed Projects
  • February Stakeholder Meetings:

(Brevard County Included in Each Meeting)

Multi‐Modal – Transit, Port, Airport, Space, and Tourism North County – Titusville, Cocoa, and Rockledge South County – Melbourne, Palm Bay, West Melbourne, Grant‐ Valkaria, Malabar, and Melbourne Village Beaches – Melbourne Beach, Indialantic, Indian Harbor Beach, Satellite Beach, Cocoa Beach, and Cape Canaveral

  • March Stakeholder Meeting:

Environmental ‐ Natural Resources, EELs, SJWMD, Melbourne Tillman, IRL, US Fish & Wildlife, Federal Lands, FWS, DEP

Space Coast TPO | 2045 Long Range Transportation Plan Update 5

slide-6
SLIDE 6

3 Public Open Houses

  • Targeted Different Areas of County

 North County – Cocoa City Hall  South County – West Melbourne Veterans Memorial Center  Beaches – Satellite Beach City Hall

  • Outreach Stats

Over 5,500 people reached via Facebook Nearly 1,500 impressions via Twitter and Nextdoor

  • First “Facebook Live” Promoting Open House!

Space Coast TPO | 2045 Long Range Transportation Plan Update 6

slide-7
SLIDE 7

Draft Needs List Development Process

slide-8
SLIDE 8

Space Coast TPO | 2045 Long Range Transportation Plan Update 8

Draft Needs List

Development

  • Started with Projects from 2040 LRTP
  • Reviewed TIP/FDOT Work Program Projects
  • Identified Additional Projects through Plan Synthesis
  • Identified Additional Projects through Stakeholder

Meetings and Public Open Houses

slide-9
SLIDE 9

Plan Synthesis

Overview

  • High‐level review of over 100 Statewide and

Brevard County specific plans

  • Types of plans reviewed –
  • General Plans (Statewide/Countywide)
  • Completed/Ongoing Studies in Brevard
  • Modal Plans (Ped/Bike/Transit/Ports/Freight)
  • Environmental Agencies/Plans
  • Goods and Services Plans
  • Comprehensive Plans
  • Community Redevelopment Agencies/Plans

Space Coast TPO | 2045 Long Range Transportation Plan Update 9

slide-10
SLIDE 10

Space Coast TPO | 2045 Long Range Transportation Plan Update 10

Draft Needs List

Project Types

  • Safety Projects
  • Roadway, Capacity, and Intersection Projects
  • Study Implementation Projects
  • ITS Master Plan Priority Projects
  • Bicycle & Pedestrian Master Plan Priority Projects
  • Bus Rapid Transit Projects Identified from 2040 LRTP
  • Space Coast Area Transit – Transit Development Plan Projects
slide-11
SLIDE 11

Space Coast TPO | 2045 Long Range Transportation Plan Update 11

Draft Needs List Safety

Project Roadway From To

Clearlake Road Pedestrian/Bicycle Safety Review SR 501 (Clearlake Rd.) Dixon Rd. Michigan Ave. Wickham Road Safety Audit Wickham Rd. Sarno Rd. Parkway Dr. Fiske Blvd. Corridor Planning Study SR 519 (Fiske Blvd.) Rosa Jones Blvd. SR 520 US 1 Pedestrian/Bicycle Safety Review US 1 University Blvd. New Haven Ave. Malabar Road Safety Audit Malabar Rd. Emerson Dr. San Filippo Dr. Emerson Drive Road Safety Audit Emerson Dr. Jupiter Blvd. Minton Rd. Palm Bay Road Pedestrian/Bicycle Safety Review Palm Bay Rd. SR 507 (Babcock St.) Lipscomb St.

PALM BAY MELBOURNE COCOA BREVARD COUNTY

slide-12
SLIDE 12

Space Coast TPO | 2045 Long Range Transportation Plan Update 12

Draft Needs List

Roadway and Capacity Projects

SR A1A N 2nd St. Sunflower St. Roadway Improvements (Adding Curb/Gutter) SR 507 (Babcock St.) Grant Rd. Foundation Park Blvd. Widen to 4 Lanes SR 507 (Babcock St.) Foundation Park Blvd. Unknown Road S of Canvoa St. Widen to 4 Lanes SR 514 (Malabar Rd.) SR 507 (Babcock St.) US 1 Widen to 4 Lanes US 1 SR 514 (Malabar Rd.) RJ Conlan Blvd. Widen to 6 Lanes SR 507 (Babcock St.) SR 514 (Malabar Rd.) Palm Bay Rd. Widen to 6 Lanes US 192 Wickham Rd. Dairy Rd. Widen to 6 Lanes US 192 Dairy Rd. SR 507 (Babcock St.) Widen to 6 Lanes Dairy Rd. US 192 Hibiscus Blvd. Widen to 4 Lanes Hollywood Blvd. Palm Bay Rd. US 192 Widen to 4 Lanes I‐95 SR 518 (Eau Gallie Blvd.) Wickham Rd. Widen to 8 Lanes SR 528 SR 520

  • E. of Industry Rd.

Interim Widen to 6 Lanes, Ultimate Widen to 8 Lanes SR 528

  • E. of Industry Rd.
  • E. of SR 3

Widen to 6 Lanes SR 528

  • E. of SR 3

Port Canaveral Interchange (SR 401) Widen to 6 Lanes

MELBOURNE WEST MELBOURNE FLORIDA DEPARTMENT OF TRANSPORTATION COCOA BEACH GRANT‐VALKARIA MALABAR PALM BAY

Dixie Way Hammock Rd. Ditch Rd./County Line Rd. Pave New Asphalt Road Nasa Causeway Bridge N/A N/A Bridge Replacement SR 401 N/A N/A Bridge Replacement Space Commerce Wy. NASA Pkwy. W Kennedy Pkwy. N Widen to 4 Lanes Pineda Cswy. Extension Osceola County Line I‐95 New 4 Lane Road SR A1A N Atlantic Ave. George King Blvd. Roadway Improvements (Adding Curb/Gutter) SR 524 S Friday Rd. Industry Rd. Widen to 4 Lanes SR 501 (Clearlake Rd.) Michigan Ave. Industry Rd. Widen to 4 Lanes SR 507 (Babcock St.) Indian River County Line Micco Rd./Deer Run Rd. Widen to 4 Lanes SR 507 (Babcock St.) Micco Rd./Deer Run Rd. Grant Rd. Widen to 4 Lanes Western Norfolk Pkwy. Extension

  • St. Johns Heritage Pkwy.

Current End of Norfolk Pkwy. W of Minton Rd. New 2 Lane Road Ellis Rd. John Rhodes Blvd. W of Wickham Rd. Widen to 4 Lanes

  • St. Johns Heritage Pkwy.

Washingtonia Ext. Ellis Rd. SR 404 (Pineda Cswy.) New 2 Lane Road Micco Rd.

  • St. Johns Heritage Pkwy.

US 1 Widen to 4 Lanes Malabar Rd.

  • St. Johns Heritage Pkwy.

Minton Rd. Widen to 4 Lanes Eastern Norfolk Pkwy. Extension Norfolk Pkwy. Imagine Way New 2 Lane Road and I‐95 Flyover US 192

  • St. Johns Heritage Pkwy.

Coastal Ln. Widen to 6 Lanes/ Interchange Improvements US 192 Coastal Ln. Wickham Rd. Widen to 6 Lanes SR 405 (South St.) SR 50 Rock Pit Rd. Widen to 4 Lanes

BREVARD COUNTY

slide-13
SLIDE 13

Space Coast TPO | 2045 Long Range Transportation Plan Update 13

Draft Needs List Intersection Projects

Intersection From To Improvement

SR 518 (Eau Gallie Blvd.) at SR A1A N/A N/A Operational Improvements Palm Bay Rd./Minton Rd./Emerson Dr. Emerson Drive Palm Bay Road Operational Analysis SR A1A at N Atlantic Ave./International Dr. N/A N/A Intersection Realignment/New 2 Lane Road SR 5054 (Sarno Rd.) at SR 518 (Eau Gallie Blvd.) N/A N/A Operational Improvements Wickham Rd. at SR 518 (Eau Gallie Blvd.) N/A N/A Operational Improvements Wickham Rd. at Aurora Rd. N/A N/A Operational Improvements Wickham Rd. at Lake Washington Rd. N/A N/A Operational Improvements Wickham Rd. at Post Rd. N/A N/A Operational Improvements SR 507 (Babcock St.) at SR 514 (Malabar Rd.) Unknown Road S of Canvoa Street Biddle Street Operational Improvements SR 406 (Garden St.) at Singleton Ave. N/A N/A Operational Analysis I‐95/SR 524 Interchange N/A N/A Operational Improvements

FLORIDA DEPARTMENT OF TRANSPORTATION TITUSVILLE PALM BAY MELBOURNE CAPE CANAVERAL BREVARD COUNTY

slide-14
SLIDE 14

Space Coast TPO | 2045 Long Range Transportation Plan Update 14

Draft Needs List Study Implementation

Roadway From To

SR 3 (Courtenay Pkwy.) Fortenberry Rd. McAuliffe Bridge SR A1A Pineda Cswy. (SR 404) Sherry Lee Ln. SR 519 (Fiske Blvd.) Barnes Blvd. Rosa Jones Blvd. SR A1A US 192 SR 404 (Pineda Cswy.) SR 518 (Eau Gallie Blvd.) SR 513 (S Patrick Dr.) SR A1A Wickham Rd. SR 518 (Eau Gallie Blvd.) Lake Washington Rd. US 1 SR 404 (Pineda Cswy.) Park Ave. Minton Rd. Palm Bay Rd. US 192 SR A1A SR 520 N Atlantic Ave. SR 520 US 1 Riveredge Blvd. Dixon Blvd. SR 501 (Clearlake Rd.) FEC Railroad Banana River Dr. Mathers Bridge SR A1A SR 5054 (Sarno Rd.) SR 518 (Eau Gallie Blvd.) Wickham Rd. Sarno Rd. Wickham Rd. US 1 SR 507 (Babcock St.) Palm Bay Rd. US 192 Jackson St. SR 513 (S Patrick Dr.) SR A1A

SATELLITE BEACH MELBOURNE INDIAN HARBOUR BEACH CAPE CANAVERAL COCOA BREVARD COUNTY

slide-15
SLIDE 15

Space Coast TPO | 2045 Long Range Transportation Plan Update 15

Draft Needs List ITS ‐ Fiber

slide-16
SLIDE 16

Space Coast TPO | 2045 Long Range Transportation Plan Update 16

Draft Needs List Bicycle Priorities

slide-17
SLIDE 17

Space Coast TPO | 2045 Long Range Transportation Plan Update 17

Draft Needs List Pedestrian Priorities

slide-18
SLIDE 18

Space Coast TPO | 2045 Long Range Transportation Plan Update 18

Draft Needs List

Transit/Bus Rapid Transit

Bus Rapid Transit Projects SCAT Transit Development Plan

Service Type/Mode Description Original Implementation Year New Implementation Year

Alternative 1: EFSC (formerly Brevard Community College) to UCF Express New Service 2015 2025 Alternative 2: Port St. John to Titusville Circulator New Service 2018 N/A Alternative 3: Grissom Parkway North‐ South Corridor New Service 2018 N/A Alternative 5: US 1/Heritage Corridor via Malabar New Service 2018 N/A Alternative 6: West Cocoa Circulator New Service 2018 N/A Alternative 7: SR 520 to Port Canaveral New Service 2019 N/A Alternative 8: Viera New Service 2019 N/A Alternative 9: Minuteman Causeway East‐West Connector New Service 2019 N/A Alternative 10: US 192 East‐West Connector New Service 2019 N/A Alternative 11: Babcock Road New Service 2019 N/A Alternative 12: Palm Bay Circulator New Service 2019 N/A Alternative 13: Downtown Melbourne to A1A Condo Park New Service 2019 N/A Alternative 14: Heritage High School New Service 2019 N/A Alternative 16: Orlando Airport Express New Service 2021 N/A Alternative 17: Kennedy Space Center Express New Service 2021 N/A Alternative 18: BCC Connector New Service 2021 N/A Alternative 19: US 1 Express New Service 2021 N/A Alternative 20: Sebastian and South County New Service 2022 N/A Alternative 21: Canaveral National Seashore New Service 2022 N/A

Roadway Project Number From To

1A Mims Country Club Dr. 1B SR 50 Fay Blvd. 1C Williams Point SR 520 2A Downtown Cocoa Viera Blvd. 2B Viera Blvd. Lake Washington Rd. 2C Lake Washington Rd. Downtown Melbourne 3A US 192 Port Malabar Blvd. 3B Port Malabar Blvd. Valkaria Rd. 3C Valkaria Rd. Micco Rd. 4A Orange County Line US 1 4B US 1 Port Canaveral I‐95 5A Pineda Cswy. Ellis Rd. Ellis Rd./Nasa Blvd. 5B I‐95 US 1 SR 520 6 West of I‐95 Cocoa Beach Fiske Blvd./Stadium Pkwy. 7 SR 520 Viera Blvd. Wickham Rd. 8A Stadium Pkwy. Lake Washington Rd. Wicham Rd./Minton Rd. 8B Lake Washington Rd. Palm Bay Rd. Minton Rd./Malabar Rd. 8C Palm Bay Rd. US 1 9A US 1 Malabar Rd. 9B Malabar Rd. I‐95 10A Port Canaveral Cocoa Beach 10B Cocoa Beach Satellite Beach 10C Satellite Beach US 192 Babcock St. SR A1A US 1 North US 1 Central US 1 South SR 528

slide-19
SLIDE 19

Revenue Forecast Overview

slide-20
SLIDE 20

Financial Forecasting

  • Federal requirement to develop a Cost Feasible Plan
  • Prioritized Improvements vs. Financial Resource Forecasts
  • State/Federal revenue projections provided by FDOT
  • Local revenue projections estimated by Study Team
  • Potential new revenue sources for informational purposes

Space Coast TPO | 2045 Long Range Transportation Plan Update 20

slide-21
SLIDE 21

Financial Forecasting

STATE/ F EDE R AL REVENUE PROGRAMS

  • Strategic Intermodal System (SIS)
  • Other Roadways and Right of Way
  • Transportation Management Area (TMA)
  • Transportation Alternatives (TA), Transit

Space Coast TPO | 2045 Long Range Transportation Plan Update 21

slide-22
SLIDE 22

Financial Forecasting

LOC AL REVENUE PROGRAMS

  • State distributed fuel taxes
  • Local option fuel taxes
  • Transportation Impact Fees

Space Coast TPO | 2045 Long Range Transportation Plan Update 22 Space Coast TPO | 2045 Long Range Transportation Plan Update 22

Caveat: All fuel tax revenues likely committed to debt service and maintenance needs

slide-23
SLIDE 23

SIS $1,654.1 M Other Roadways $1,122.2 M Transit $385.9 M TMA $190.4 M TA $15.4 M

$0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000

  • State/Federal programs: $3.4 billion
  • Strategic Intermodal System (SIS)
  • Other Roadways and Right of Way
  • Transit
  • Transportation Management Area (TMA)
  • Transportation Alternatives (TA)
  • Local revenue sources: $1.5 billion
  • Transportation Impact Fees
  • State distributed fuel taxes
  • Local option fuel taxes

Space Coast TPO | 2045 Long Range Transportation Plan Update 23

Financial Forecasting

Local Revenue = $1.5 billion State/Federal = $3.4 billion

Impact Fees $707.4 M LOFT $389.1 M State Fuel Taxes $365.0 M 9th Cent $45.2 M

~$800M Already Committed to O&M

slide-24
SLIDE 24

Financial Forecasting

POTENTIAL NEW REVENUE SOURCES

  • Sales Surtax
  • 0.5% yields additional $1.2 billion
  • 1.0% yields additional $2.3 billion
  • Local option fuel taxes
  • 1 to 5 cent option yields additional $215 million
  • 9th cent on non‐diesel fuel yields additional $100 million
  • $1.5 to $2.6 billion of untapped potential

from these two sources alone

Space Coast TPO | 2045 Long Range Transportation Plan Update 24

slide-25
SLIDE 25

Space Coast TPO | 2045 Long Range Transportation Plan Update 25

Financial Forecasting

POTENTIAL NEW REVENUE SOURCES

  • Only 12 out of Florida's 67 counties

have not implemented more than the 6 cent gas tax, Brevard is one of them

slide-26
SLIDE 26

Cost Feasible Plan Funding Programs

  • Utilize State and Local Funding Sources for Roadway and

Intersection Projects

  • Utilize State and Local Funding to also set aside “boxed

funds” for other specific project types

Prioritized Corridors from Bicycle & Pedestrian Master Plan Prioritized ITS Projects Transit O&M Study Implementation Projects Safety Projects

26

slide-27
SLIDE 27

Next Steps

slide-28
SLIDE 28

Next Steps

  • Cost Feasible Plan Development
  • Draft Cost Feasible: Post June 17th for Public Comment
  • Open House June 17th: Present Draft Cost Feasible Plan
  • July TAC/CAC/TPO: Present Draft Cost Feasible Plan
  • Local Agency Implementation Guide Development
  • September TAC/CAC/TPO: Present 2045 LRTP for adoption

Space Coast TPO | 2045 Long Range Transportation Plan Update 28

slide-29
SLIDE 29

2045 Long Range Transportation Plan Update

Travis Hills – PM, Kittelson & Associates, Inc. 407.540.0555 thills@kittelson.com

Thank You!

Steven Bostel – PM, Space Coast TPO 321.690.6890 Steven.bostel@brevardfl.gov spacecoasttpo.com