Tri‐County Element: Long Range Transportation Plan

slide-2
SLIDE 2

2

 E

nc our age in loc al gover nment c ompr ehensive plans

  • Re inve st in ne ig hbo rho o ds
  • Stre ng the n do wnto wns, c re ate

mo re do wnto wn-like plac e s

  • Minimize o utward g ro wth

2

Guidanc e for the 2045 Plan

Hybrid Sc e nario

Growth / Land Use Elements

slide-3
SLIDE 3

3

 Consider

  • ptions for

inc or por ating r ail in the 2045 Plan

  • Virg in T

rains USA (Brig htline )

  • Stre e tc ar
  • Othe r rail o r fixe d g uide way transit
  • Plan sho uld inc lude e xpre ss bus and

BRT c o nne c tio ns

3

Guidanc e for the 2045 Plan

Hybrid Sc e nario

Transit Elements

slide-4
SLIDE 4

4

 Continue to explor

e elevated expr ess lane pr

  • jec ts
  • Po ssible strate g y fo r Do wnto wn T

ampa inte rc hang e (i.e . alts C & D)

  • Po ssible strate g y fo r SR 54 / US 41

inte rc hang e are a in Pasc o

  • T
  • lls sho uld be use d fo r c o ng e stio n

manag e me nt rathe r than raising re ve nue

4

Guidanc e for the 2045 Plan

Hybrid Sc e nario

Roadways Elements

slide-5
SLIDE 5

5

Guidanc e for the 2045 Plan

Hybrid Sc e nario

F

  • c us o n bo ttle ne c ks suc h as ne w &

e xpande d inte rc hang e ramps

Walk and bike mo de s are impo rtant to inc lude and addre ss

Public suppo rt no t c urre ntly pre se nt fo r I

  • 275

bo ule vard c o nve rsio n

De mo nstrate ho w te c hno lo g y advanc e s c an be imple me nte d re alistic ally and safe ly

Other Transportation Elements

slide-6
SLIDE 6

Tri‐County Vision Map

Results from Its Time Survey

slide-7
SLIDE 7

Next Steps: What can be funded? What’s needed most?

  • One regional model for travel demand ‐ shows effects on all counties
  • Forecast future traffic
  • Test effect of transportation projects in the Tri‐County Vision
  • Each MPO estimates costs and available revenues
  • Determining cost‐feasibility:
  • Some Vision projects are part of FDOT’s Strategic Intermodal System
  • Some projects will require local funds or even interlocal agreements
  • Second phase of outreach, by each MPO, to gain feedback on

priorities

  • Dialogue at TMA about funding available for Tri‐County Vision
  • Each MPO adopts cost‐feasible plan
slide-8
SLIDE 8

Tri‐County Plan Element: Ingredients

  • Corridors of Regional

Significance

  • Moving Transit Forward
  • Vulnerability Assessment
  • Technology and Automation
  • Environmental Consultation
  • Other Considerations?