william s richardson school of law community legal
play

William S. Richardson School Of Law Community Legal Outreach Center - PowerPoint PPT Presentation

William S. Richardson School Of Law Community Legal Outreach Center (CLOC) UHM 12-306 University of Hawaii at Mnoa COMMUNITY LEGAL OUTREACH CENTER (CLOC) June, 2015 Circulation Library Stacks Utility/Restrooms Classrooms Student Areas


  1. William S. Richardson School Of Law Community Legal Outreach Center (CLOC) UHM 12-306 University of Hawaiÿi at Mänoa COMMUNITY LEGAL OUTREACH CENTER (CLOC) June, 2015

  2. Circulation Library Stacks Utility/Restrooms Classrooms Student Areas Vertical Circulation Offices Outdoor Space Library Storage Conference Rooms Public Areas Computer Labs Garden/Courtyard 0’ 40’ 80’ 160’ NORTH EXISTING SITE PLAN June, 2015

  3. Dole Street CLOC Pedestrian Area West Wing Circulation Reception/Lobby Conference Rooms Classroom/Conference Food Prep Student Areas Offices / Workspace Interview Room Utility/Restrooms Garden/Courtyard Copy/File Vertical Circulation 0’ 20’ 40’ 80’ NORTH LEVEL 1 PROGRAM DIAGRAM June, 2015

  4. Dole Street CLOC West Wing Circulation Reception/Lobby Conference Rooms Classroom/Conference Food Prep Student Areas Offices / Workspace Interview Room Utility/Restrooms Garden/Courtyard Copy/File Vertical Circulation 0’ 20’ 40’ 80’ NORTH LEVEL 2 PROGRAM DIAGRAM June, 2015

  5. 0’ 15’ 30’ 60’ NORTH LANDSCAPE PLAN June, 2015

  6. DOLE STREET DOLE STREET ZONE 17 CAMPUS LANDSCAPE IMPROVEMENTS GRO UP 7o SCOPE OF WORK BUS STOP CONTINUOUS MONKEYPODS EXISTING SEWER LINE TEMPORARY I N T E R N A T I O N A L BOLLARDS MANHOLE 9 2 5 b e t h e l s t r e e t , f i f t h f l o o r h o n o l u l u , h i 9 6 8 1 3 - 4 3 9 8 8 0 8 . 5 2 3 . 5 8 6 6 EXISTING PARKING w w w . g r o u p 7 0 i n t . c o m CURB LOCATION REVISIONS BACKFLOW No. Date Description PREVENTION PIPE RETAINING WALL DN TERRACED SEATING - N.I.C. ONLY ONLY EXISTING EXISTING SEWER LINE LAW SCHOOL DROP-OFF CANOPY BRIDGE ABOVE CLOC MAIN ENTRANCE DN EXISTING PARKING LEV LEV LEV DROP-OFF CURB LOCATION SEATING - N.I.C. PEDESTRIAN PEDESTRIAN AREA - N.I.C. AREA - N.I.C. PLANTING AREA - BIOSWALE SEE LANDSCAPE PLANTING AREA VIP VIP Schematic Design DN EXISTING This work was prepared by me or under my TRANSFORMER LOADING ZONE supervision and construction of this project DO NOT BLOCK will be under my EXISTING CENTER BICYCLE LOCKERS observation PARKING ISLAND TEMPORARY LOCATION BOLLARDS Supervision and Observation of this project is as defined in Section 16-115-9 of the Hawaii PAY STATION Administrative Rules, Title 16, Chapter 115, 04/30/16 Professional Engineers, License Expiration Date Architects, Land Surveyors, PLANTING AREA PLANTING AREA DN and Landscape Architects. DN VISITOR STALLS PROJECT TITLE REFUSE / RECYCLING COMMUNITY LEGAL OUTREACH CENTER (CLOC) LOWER CAMPUS ROAD FILENAME: C:\Users\natalies\Documents\CLOC-A14_Central_natalies.rvt DRAWING TITLE Type in Central File Path Here SITE PLAN - FUTURE PHASE SCALE: 1" = 10'-0" 0’ 15’ 30’ 60’ DRAWN BY: CHECKED BY: NORTH N Author Checker SITE PLAN - FUTURE PHASE NORTH 1 PROJECT NO. DRAWING NO. 6/2/2015 5:18:02 PM W E SCALE: 1" = 10'-0" 10' 5' 0' 10' 20' 212067-01 A-101A S DATE: 05/07/2015 SITE PLAN - FUTURE PHASE June, 2015

  7. GRO UP 7o I N T E R N A T I O N A L 9 2 5 b e t h e l s t r e e t , f i f t h f l o o r h o n o l u l u , h i 9 6 8 1 3 - 4 3 9 8 8 0 8 . 5 2 3 . 5 8 6 6 w w w . g r o u p 7 0 i n t . c o m REVISIONS ELEV No. Date Description 102 MECH ELEC TEL WC JAN. 83 SF 103 104 105 106 107 57 SF 70 SF 69 SF 67 SF 57 SF OFFICE 109 DROP-OFF 121 SF CANOPY WORKSPACE 108 287 SF OFFICE OPEN TO ABOVE BRIDGE ABOVE B/I BENCH 110 126 SF COURTYARD RECEPTION / ENTRANCE CIRCULATION INTERVIEW INTERVIEW 100 101 112 111 197 SF 890 SF POTTED PLANTS 121 SF 121 SF DISPLAY WALL DECORATIVE SCREEN EXIT / SECONDARY PEDESTRIAN AREA SECURE Schematic Design ENTRANCE This work was prepared by me or under my AV CLOSET AV CLOSET supervision and construction of this project will be under my STAIR observation CLASSROOM / CLASSROOM / CLASSROOM / 117 MOVABLE CONFERENCE CONFERENCE CONFERENCE Supervision and FOOD PREP PARTITION 156 SF ROOM ROOM ROOM Observation of this project REF is as defined in Section 116 115 114 113 16-115-9 of the Hawaii 233 SF DW 237 SF 249 SF 274 SF Administrative Rules, Title INSTRUCTION WALL 16, Chapter 115, 04/30/16 Professional Engineers, License Expiration Date Architects, Land Surveyors, and Landscape Architects. INSTRUCTION WALL INSTRUCTION WALL PROJECT TITLE COMMUNITY LEGAL OUTREACH CENTER (CLOC) FILENAME: C:\Users\natalies\Documents\CLOC-A14_Central_natalies.rvt DRAWING TITLE FIRST LEVEL - FURNITURE PLAN Circulation Reception/Lobby Utility/Restrooms Classroom/Conference Food Prep Vertical Circulation Offices / Workspace Interview Room Garden/Courtyard Copy/File SCALE: 1/4" = 1'-0" DRAWN BY: CHECKED BY: 0’ 5’ 10’ 20’ Author Checker NORTH LEVEL 1 - FURNITURE PLAN 1 PROJECT NO. DRAWING NO. 1/4" = 1'-0" SCALE: 212067-01 ID-101 DATE: 05/07/2015 LEVEL 1 PLAN June, 2015

  8. GRO UP 7o I N T E R N A T I O N A L MECHANICAL 9 2 5 b e t h e l s t r e e t , f i f t h f l o o r CHASE h o n o l u l u , h i 9 6 8 1 3 - 4 3 9 8 8 0 8 . 5 2 3 . 5 8 6 6 w w w . g r o u p 7 0 i n t . c o m ELEV OFFICE OFFICE REVISIONS 202 208 209 No. Date Description ELEC TEL WC SHOWER 83 SF 110 SF 112 SF 204 205 206 207 ELEVATOR CLOSET 59 SF 81 SF 89 SF 111 SF 203 37 SF DROP-OFF CANOPY BRIDGE 221 479 SF CIRCULATION 201 836 SF OPEN TO BELOW OFFICE 214 109 SF OFFICE WORKSPACE 210 217 104 SF 333 SF Schematic Design OFFICE This work was prepared by 211 WORKSPACE me or under my STAIR supervision and 104 SF 213 OFFICE construction of this project 220 FILE / COPY 334 SF will be under my 215 159 SF observation 218 108 SF 126 SF Supervision and Observation of this project is as defined in Section 16-115-9 of the Hawaii Administrative Rules, Title 16, Chapter 115, 04/30/16 Professional Engineers, License Expiration Date Architects, Land Surveyors, OFFICE and Landscape Architects. OFFICE 212 PROJECT TITLE OFFICE 102 SF 219 COMMUNITY LEGAL 216 120 SF OUTREACH CENTER (CLOC) 107 SF FILENAME: C:\Users\natalies\Documents\CLOC-A14_Central_natalies.rvt DRAWING TITLE Circulation Reception/Lobby Utility/Restrooms SECOND LEVEL - FURNITURE PLAN Classroom/Conference Food Prep Vertical Circulation Offices / Workspace Interview Room Garden/Courtyard Copy/File SCALE: 1/4" = 1'-0" 0’ 5’ 10’ 20’ DRAWN BY: CHECKED BY: NORTH LEVEL 2 - FURNITURE PLAN Author Checker 1 SCALE: 1/4" = 1'-0" PROJECT NO. DRAWING NO. 212067-01 ID-102 DATE: LEVEL 2 PLAN 05/07/2015 June, 2015

  9. GRO UP I N T E R N A T 9 2 5 b e t h e l s t r e e t , h o n o l u l u , h i 9 8 0 8 . 5 2 3 . 5 8 w w w . g r o u p 7 0 REVISIONS SHOWER OFFICE OFFICE No. Date 207 208 209 111 SF 110 SF 112 SF BENCHES BRIDGE EXISTING LAW SCHOOL 221 479 SF NEW WALLS OFFICE OFFICE 214 210 109 SF 104 SF Schematic D OFFICE WORKSPACE OFFICE This work was prepared by me or under my 215 213 211 supervision and 108 SF 334 SF 104 SF construction of this project will be under my observation Supervision and Observation of this project is as defined in Section 16-115-9 of the Hawaii Administrative Rules, Title 16, Chapter 115, Professional Engineers, L Architects, Land Surveyors, and Landscape Architects. OFFICE OFFICE 216 212 PROJECT TITLE 107 SF 102 SF COMMUNITY OUTREACH CEN FILENAME: C:\Users\natalies\Documents\CLOC-A14_Central_natalies Circulation Reception/Lobby Utility/Restrooms DRAWING TITLE SECOND LEVEL FLOOR PL Classroom/Conference Food Prep Vertical Circulation BRIDGE Offices / Workspace Interview Room Garden/Courtyard Copy/File 0’ 5’ 10’ 20’ SCALE: 1/4" = 1'-0" NORTH DRAWN BY: N Author PEDESTRIAN BRIDGE NORTH 1 PROJECT NO. W E SCALE: 1/4" = 1'-0" 4' 2' 0' 4' 8' 212067-01 S PEDESTRIAN BRIDGE DATE: 05/07/2015 June, 2015

  10. VIEW FROM DOLE STREET June, 2015

  11. VIEW OF THE COURTYARD June, 2015

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.