WEST COLFAX PEDESTRIAN CROSSING & TRANSIT IMPROVEMENTS PROJECT - - PowerPoint PPT Presentation

west colfax pedestrian crossing transit improvements
SMART_READER_LITE
LIVE PREVIEW

WEST COLFAX PEDESTRIAN CROSSING & TRANSIT IMPROVEMENTS PROJECT - - PowerPoint PPT Presentation

WEST COLFAX PEDESTRIAN CROSSING & TRANSIT IMPROVEMENTS PROJECT Community Open House June 25 th , 2019 BACKGROUND Elevate Denver Bond Program approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries,


slide-1
SLIDE 1

WEST COLFAX PEDESTRIAN CROSSING & TRANSIT IMPROVEMENTS PROJECT

Community Open House June 25th, 2019

slide-2
SLIDE 2

BACKGROUND

  • Elevate Denver Bond Program

approved by voters in 2017 to enhance roads, sidewalks, parks, recreation centers, libraries, cultural centers, public-owned buildings, health and safety facilities.

  • Included: Funds to construct

pedestrian c n crossing ng e enhanc ncement nts

  • n West Colfax, and funds to

improve speed eed a and r rel eliability o

  • f

transi sit along the corridor

slide-3
SLIDE 3

PROJECT AREA

slide-4
SLIDE 4

PROJECT BACKGROUND

West Colfax has been identified as needing pedestrian safety and transit improvements in various studies and initiatives

slide-5
SLIDE 5

2015 REIMAGINE WEST COLFAX COLLABORATIVE

  • Community led outreach, data

collection, and collaboration

  • Included one-day pop-up

demonstration of pedestrian and bicycle enhancements along West Colfax

slide-6
SLIDE 6

What three elements of today’s demonstration do you think would have the most positive impact on West Colfax if they were made permanent?

slide-7
SLIDE 7

WHY?

SAFETY

slide-8
SLIDE 8

DENVER’S HIGH INJURY NETWORK

  • High Injury Network

includes Colfax

  • Corridors with the

highest number of fatal and injury crashes.

  • 14% of all crashes

between a motorist and pedestrian occurred on Colfax between 2011- 2015.

slide-9
SLIDE 9

WHY?

IMPROVED TRANSIT EXPERIENCE

  • Denver Moves Transit
  • RTD West Colfax Study
  • High RTD ridership corridor

6, 6,00 000 d 0 daily weekday RTD riders

slide-10
SLIDE 10

CURREN ENT T CONDITI TIONS

slide-11
SLIDE 11
  • Crash Data
  • Speed Data
  • Parking Data
  • Existing Roadway Width
  • Vehicle Traffic Counts
  • Bicycle and Pedestrian Counts
  • Land Use Data
  • Existing Signal Spacing

Considerati tions t that w t went t into o

  • ur a

analysi sis: s:

slide-12
SLIDE 12

DESIG IGN ALTER TERNATIVES ES

What can we do to improve safety and transit speed and reliability on West Colfax?

slide-13
SLIDE 13

MEDIANS

  • Discourage speeding
  • Provide safer crossings

EXAMPLE LES

slide-14
SLIDE 14

PEDESTRIAN BULBOUTS (CURB EXTENSIONS)

  • Decrease crossing distance
  • Make pedestrians more

visible to vehicles

  • Slow down turning vehicles

EXAMPLE LES

slide-15
SLIDE 15

SIGNALIZED & MARKED CROSSINGS

  • Requires vehicles to fully

stop to allow for pedestrians to cross

EXAMPLE LES

slide-16
SLIDE 16

IMPROVE TRANSIT SPEED & RELIABILITY

  • Bus Bulb-outs
  • Consolidated stops
  • Transit Signals
slide-17
SLIDE 17

Construction is dependent on bond funding and availability, and is to be determined.

PROJECT TIMELINE

slide-18
SLIDE 18

THANK YOU!

  • Ask q

quest stions s of any people wearing a badge around the room

  • Provid

ide in input at the map and board activity stations

  • Learn

rn m more re about the project by reading the boards

  • Share t