Engineering Company How Far Do You Go to Get Gravity Flow? - PowerPoint PPT Presentation

General Engineering Company How Far Do You Go to Get Gravity Flow? Presenter - Jerry Foellmi, PE Project Available Code Challenges Options Contact Case - Abbyland Foods - WI CSA Information - Dekorra Utility District Study -


  1. General Engineering Company How Far Do You Go to Get Gravity Flow? Presenter - Jerry Foellmi, PE

  2. Project Available Code Challenges Options Contact Case - Abbyland Foods - WI CSA Information - Dekorra Utility District Study - Greenwood/Loyal

  3. Code  Replacement vs. New  Pipe Size vs. Slope  Manhole to Manhole Distance  Private vs. Public  Open Cut/Directional Bore  Stream Crossing Req. Ch. 30 permit

  4. Site Conditions/Layout - Terrain - Bedrock - Groundwater - Wetlands - Floodplain - Streams Project Issues Project Challenges - Grants/Loans - Budget - Owner Directives Client/DPW Expectations - Budget - OMR - Lift Station ?

  5. Available Gravity Options 1 – Increasing Pipe Size 2 – MH to MH Separation 3 – Directional Bore 4 – Lift Station 5 – Stream Crossing Aerial Crossing Inverted Syphon

  6. Case Studies Abbyland Foods - Abbotsford, WI

  7. Abbyland Foods - Abbotsford, WI

  8. Abbyland Foods - Abbotsford, WI - 1700’ - 10” @ .28% - Every obstacle - Owner Directives

  9. Abbyland Foods - Abbotsford, WI

  10. Abbyland Foods - Abbotsford, WI

  11. Case Studies WI CSA

  12. Case Studies Crystal, Fish & Mud Lakes Protection District Dane Co, WI

  13. Case Studies Crystal, Fish & Mud Lakes Protection District Dane Co, WI

  14. Case Studies Crystal, Fish & Mud Lakes Protection District - Dane Co, WI

  15. Case Studies Crystal, Fish & Mud Lakes Protection District - Dane Co, WI

  16. Case Studies Crystal, Fish & Mud Lakes Protection District Dane Co, WI

  17. Case Studies Crystal, Fish & Mud Lakes Protection District Dane Co, WI

  18. Case Studies Crystal, Fish & Mud Lakes Protection District Dane Co, WI

  19. Case Studies Dekorra Water Utility District Dekorra, WI

  20. Case Studies Greenwood, WI

  21. Case Studies Greenwood, WI

  22. Takeaways  Open mind when considering sewer service for challenging sites  Tight Pocketbook  Reducing Costs vs Long-Term OMR

  23. Contact Information General Engineering Company Jerry Foellmi, PE Project Manager President Emeritus jfoellmi@generalengineering.net generalengineering.net 608-742-2169

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.