Civil Engineering Session KNex Bridge Activity Dr. Laura Doyle - - PowerPoint PPT Presentation

civil engineering session
SMART_READER_LITE
LIVE PREVIEW

Civil Engineering Session KNex Bridge Activity Dr. Laura Doyle - - PowerPoint PPT Presentation

Santa Clara University School of Engineering Department of Civil Engineering Civil Engineering Session KNex Bridge Activity Dr. Laura Doyle Department of Civil Engineering Civil Engineering? Civil


slide-1
SLIDE 1

Santa ¡Clara ¡University ¡ School ¡of ¡Engineering ¡ Department ¡of ¡Civil ¡Engineering ¡

  • Dr. Laura Doyle

Department of Civil Engineering

Civil Engineering Session

K’Nex Bridge Activity

slide-2
SLIDE 2

2

Civil Engineering? Civil Engineers design & build structures to support the progress of human civilization!

Cool Civil Engineering Stuff!

slide-3
SLIDE 3

3

Civil Engineering Sub-disciplines? First thing you do after waking up ….

Use the Toilet! Environmental Engineering

Waste Water Treatment Plant Dump Areas Environmental Assessment

Other Environmental Engineering work

slide-4
SLIDE 4

4

Civil Engineering Sub-disciplines? SECOND thing you do after waking up ….

Take a shower (water!) Water Resources Engineering

Water Resources (Lakes, Rivers, ….) Water Demand (Houses, factories, ….)

slide-5
SLIDE 5

5

Civil Engineering Sub-disciplines? How do you go to School?

Transportation (car, bus, train, …) Transportation Engineering

slide-6
SLIDE 6

6

Civil Engineering Sub-disciplines? Where do we live, study, and work?

Buildings (homes, offices, …..) Structural Engineering Other structures: bridges, tunnels, tanks, stadiums ….

slide-7
SLIDE 7

7

Civil Engineering Sub-disciplines? What is wrong with this tower?

Soil Stabilization! Geotechnical Engineering

Beaver Dam! Earth Dam

slide-8
SLIDE 8

8

Civil Engineering Sub-disciplines? Who constructs all these structures?

Construction Engineering

Time Cost Crews

Contractors!

slide-9
SLIDE 9

9

Civil Engineering Sub-disciplines?

Environmental Engineering Structural Engineering Geotechnical Engineering Water Resources Engineering Transportation Engineering Construction Engineering

slide-10
SLIDE 10

10

K’NEXercise

Pedestrian Bridge Construction

slide-11
SLIDE 11

11

Background

  • Critical need for a pedestrian bridge across

El Camino Real between CalTrain and SCU.

  • Traffic Engineers have noted a distinct

safety concern for pedestrians

  • Traffic Engineers have also noted light

signal timings to allow for pedestrian crossings delays traffic.

slide-12
SLIDE 12

12

You are the Contractor!

  • Costs = labor + materials
  • Must adhere to provided plans
  • Purchase materials from K’NEX
  • Labor costs = $10/person/second
  • Any bridge that fails the load test or does not

meet project specifications is disqualified

  • Lowest successful cost is the winner
slide-13
SLIDE 13

13

Competition Format

  • Bidding is 30 minutes

– read contract directions – study plans – submit first order

  • Delivery and Inventory

– delivery of parts – may inventory parts, but cannot connect any parts

  • Construction

– Running clock $$$ – Quality control

  • Load test
slide-14
SLIDE 14

14

K’NEXercise

Pedestrian Bridge Construction

Bidding

slide-15
SLIDE 15

15

K’NEXercise

Pedestrian Bridge Construction

Delivery & Inventory

slide-16
SLIDE 16

16

K’NEXercise

Pedestrian Bridge Construction

Construction

slide-17
SLIDE 17

17

K’NEXercise

Pedestrian Bridge Construction

Load Testing

slide-18
SLIDE 18

18

LAST Advise! Follow Your Heart & Passion! Best wishes for your future career!