Welcome TO LIBERTY UTILITIES' WILDFIRE MITIGATION AND PUBLIC SAFETY - - PowerPoint PPT Presentation

welcome
SMART_READER_LITE
LIVE PREVIEW

Welcome TO LIBERTY UTILITIES' WILDFIRE MITIGATION AND PUBLIC SAFETY - - PowerPoint PPT Presentation

Welcome TO LIBERTY UTILITIES' WILDFIRE MITIGATION AND PUBLIC SAFETY POWER SHUTOFF TOWN HALL please wait for your host to join Wildfire Mitigation: PROTECTING OUR COMMUNITY FOR TODAY AND FUTURE GENERATIONS ELIOT JONES, SENIOR MANAGER, WILDFIRE


slide-1
SLIDE 1

Welcome

TO LIBERTY UTILITIES' WILDFIRE MITIGATION AND PUBLIC SAFETY POWER SHUTOFF TOWN HALL

please wait for your host to join

slide-2
SLIDE 2

Wildfire Mitigation:

PROTECTING OUR COMMUNITY FOR TODAY AND FUTURE GENERATIONS ELIOT JONES, SENIOR MANAGER, WILDFIRE PREVENTION PAT DILLON, FIRE PROTECTION SPECIALIST LEE KIOLBASA, EMERGENCY MANAGEMENT MANAGER KURT ALTHOF, REGIONAL PROGRAM MANAGER, EXTERNAL COMMUNICATIONS

slide-3
SLIDE 3

All Liberty service areas are within the High Fire Threat District and have been designated either “Tier 2” (Elevated) or “Tier 3” (Extreme) fire risk, meaning that the possibility of wildfire is at an elevated risk. To combat this risk, Liberty developed and is currently executing an aggressive Wildfire Mitigation Plan.

About Our Service Area

Background

slide-4
SLIDE 4

Vegetation management Wildfire Mitigation Plan

Components of the Wildfire Mitigation Plan

Infrastructure hardening Public Safety Power Shutoffs (PSPS) Situational awareness

slide-5
SLIDE 5

Vegetation Management

12 Feet

Vegetation Management

Prune branches and vegetation back to a minimum of 12 feet from the high voltage power lines to ensure adequate clearance is maintained

  • ver the maintenance cycle period.

We will notify the property owner prior to starting work via a doorhanger. Customers can submit a tree trimming request at 530-546-1787

slide-6
SLIDE 6

Install covered conductors Infrastructure Hardening

Over the next several years, Liberty will:

Replace conventional fuses with limiting fuses Test and replace aging poles Enhance grid topology

slide-7
SLIDE 7

In North Lake, Liberty is:

Infrastructure Hardening

www.alertwildfire.org

Did you know Alert WildFire cameras are stationed throughout the North Lake area?

Conducting pole and

  • ther equipment

inspections Installing two new weather stations Trimming at-risk trees and other invading vegetation Installing covered conductors in Meeks Bay

To learn more about weather stations, visit https://liberty.westernweathergroup.com/

slide-8
SLIDE 8

PSPS

Public Safety Power Shutoffs

A Public Safety Power Shutoff, or PSPS, is a safety procedure where Liberty proactively turns off power in certain areas when and where weather conditions create a high wildfire risk. Liberty will only implement a PSPS as a last resort to protect the safety of our customers and communities.

slide-9
SLIDE 9

While no one factor will determine a PSPS, Liberty coordinates with fire weather experts to monitor:

Determining When to Issue a PSPS

Forecast sustained wind and gusts Low humidity levels Dry fuel conditions Red flag warnings

slide-10
SLIDE 10

Determining When to Issue a PSPS

Energy Release Component (dry fuel conditions) exceeds 92nd percentile Wind gusts exceed 40 miles per hour Fosberg Fire Weather Index (measures speed of potential fire) exceeds 50 INITIATE PSPS PROTOCOLS

slide-11
SLIDE 11

50 MPH

WIND GUSTS

TRANSMISSION LINES SUBSTATION DISTRIBUTION LINES 5 MPH

WIND GUSTS

Determining When to Issue a PSPS

slide-12
SLIDE 12

The length of a PSPS will be determined on a case- by-case basis, but the power restoration process will follow a simple formula:

Fire conditions improve

Restoring Power After a PSPS

Liberty dispatches crews to conduct safety inspections of the grid Liberty makes any needed repairs Power is restored

slide-13
SLIDE 13

Approximately 48 hours before power is shut off Approximately 24 hours before power is shut off Just before power is shut off During the PSPS Once power has safely been restored The multiple factors Liberty assesses before deciding to shut off power are

  • unpredictable. Therefore, customers

should prepare for a scenario where a PSPS might need to be instituted without 48 hours’ notice.

When and How Will I Be Notified?

Timing of Notifications (when possible):

Phone calls Emails Twitter News Texts Facebook Radio alerts And more!

IT IS IMPERATIVE THAT CUSTOMERS UPDATE THEIR CONTACT INFORMATION AND FOLLOW LIBERTY ON SOCIAL MEDIA TO RECEIVE TIMELY PSPS NOTIFICATIONS.

slide-14
SLIDE 14

Customers should consider the following to make certain their homes, businesses and families are prepared:

Call 1-800-782-2506 to confirm your contact information is up to date

How Can I Prepare for a PSPS?

Create an emergency kit Keep your important documents in a fireproof place and create password-protected digital copies Plan for medical needs that may be impacted by a power shutoff

CALIFORNIA FOUNDATIONS FOR INDEPENDENT LIVING CENTERS CFILC.ORG AMERICAN DISABILITIES ACT NATIONAL NETWORK ADAPACIFIC.ORG

ADDITIONAL RESOURCES

slide-15
SLIDE 15

QUESTIONS?

Local and Responsive. We Care.

CATahoeWildfireinfo@libertyutilities.com

TO REQUEST SUPPLEMENTAL EDUCATIONAL MATERIAL IN ENGLISH, SPANISH OR AN ADDITIONAL LANGUAGE @LibertyUtil_CA @LibertyUtilitiesLT