welcome
play

Welcome Downtown wn Tampa mpa Ur Urban Core e Area ea Comm - PowerPoint PPT Presentation

Welcome Downtown wn Tampa mpa Ur Urban Core e Area ea Comm mmun unit ity y Worki rking g Group oup June 25, 2018 Tina na Fisch cher er Collaborative Labs, St. Petersburg College Tonights Agenda Open House Area (6:00 -


  1. Welcome Downtown wn Tampa mpa Ur Urban Core e Area ea Comm mmun unit ity y Worki rking g Group oup June 25, 2018 Tina na Fisch cher er Collaborative Labs, St. Petersburg College

  2. Tonight’s Agenda • Open House Area (6:00 - ongoing) – Information about related studies, projects, etc. • Presentation (6:30 - 7:00) – SEIS Update – Overview of Downtown Interchange Concept Options • Roundtable Discussions (7:00 - 8:00) – Dive into details and provide input • Closing Comments/Announcements (8:00 - 8:30)

  3. Rea eal l Tim ime e Rec ecord ord • Comprehensive meeting notes and graphics - available next week • Presentation and Graphic Displays – available tomorrow • Posted on TampaBayNext.com TampaBayNext.com (813) 975-NEXT @TampaBayNext TampaBayNext TampaBayNext@dot.state.fl.us

  4. Your ur inp input ut ma matter ers. s. Your ur id idea eas s hel elp p sh shap ape e the e Tam ampa pa Bay Next xt program. gram. No Now on on to o ou our r pr present esentation tion

  5. Da David vid Gwynn, wynn, P.E .E. FD FDOT Di Distr stric ict Se t Seven en Sec ecreta tary

  6. Inter erstat tate e Moder Overvie ernizat view nization ion I-275 75 @ I-4 - High ghli light ghted ed in n Or Orang nge

  7. Al Alice ice Pr Price ice SEIS Update FDO DOT Di Dist stric ict S t Seven en

  8. SEIS Updat ate Whe here re Are re We In Th n The Proces rocess? s? ALL docume ument nts s remain n in DRAFT FT form and open for public ic comment mment until after er the We are e here Public ic He Heari ring g in 2019. Public lic Prepar aratio ation Public lic SEIS IS Public lic SEIS IS Began an Worksh shop op of Worksh shop op Hear aring ing January October Documen ents ts December Summer 2017 2017 Ongoing 2018 2019 *A Preferred Alternative will be recommended after the December 2018 Public Workshop.

  9. SEIS Updat ate Tampa mpa Int nterstat state St Study dy (TIS) Purp rpose ose & N & Need: • Im Impro rove re regional onal conn nnec ectivity tivity • Pro rovide vide multimoda imodal l corrido dor Supp pplemental ntal • Meet et future travel el demand nd Envir ironme nmental ntal • Relie lieve cong ngestio estion Impa pact ct St Statem ement nt • Impro rove safety ety (SEIS) • Impro rove accessib ssibility ility

  10. SEIS Updat ate How will we ultimately make a decision? Environment Constructability Follow the Process Engineering and Traffic Balance the Issues Public Comment Balance the Issues *No single factor outweighs all others 11

  11. SEIS Updat ate What Are re We Evaluating uating in the S SEIS? S? These are documents we are preparing to aid in decision making. Draft documents will be available at the December 10 & 13, 2018 Public Workshop. Natura ral and Enginee ineeri ring ng Publi lic c Sociocul ciocultu tural ral Ef Effects ts Physi sica cal Effe fects cts Consi side dera rati tion ons Outre reac ach SCE Tech Memo (includes Air Quality Tech Memo Preliminary Engineering Public & Agency Environmental Justice and Coordination Plan Economic Considerations) Natural Resources Traffic Tech Memo Comments & Coordination Evaluation Tech Memo Cultural Resources Pond Siting Noise Tech Memo Public Workshops & Conceptual Relocation Hearing Plan Contamination Screening

  12. SEIS Updat ate What is FD FDOT T still conside iderin ring for for the he Down wntown wn Int nterch change? ange? Tolled lled Express press Lanes s or Non-Tolle olled d Expre ress ss Lane nes Or Original ginal TIS TIS No Furth ther Preferr eferred ed B D Action Ac ion Altern ernativ ative A C Four ur Design ign Op Optio ions

  13. Rou oundtable ndtable Dis iscus cussion sion Top opics ics Operation rations s & Sociocul ciocultu tural ral Access ess Effe fects ts Natura ral & Physical sical Commitme tment nts s & Envir iron onment nt Opportuni nities ties

  14. Je Jeff f Dr Drapp app, , P.E .E. Downtown Interchange Concept Options Overview

  15. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork ROW Footprint

  16. Reconstructed Interchange without Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork ROW Footprint

  17. Existing Interchange with Elevated Express Lanes South Option General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork ROW Footprint

  18. Existing Interchange with Elevated Express Lanes North Option General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork ROW Footprint

  19. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Egress from the West General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  20. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Egress from the North General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  21. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Egress from the East General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  22. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Ingress to the West General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  23. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Ingress to the North General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  24. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Ingress to the East General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  25. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork Express Lane Egress General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  26. Reconstructed Interchange with Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork Express Lane Ingress General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  27. Reconstructed Interchange without Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Egress from the West General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  28. Reconstructed Interchange without Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Egress from the North General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

  29. Reconstructed Interchange without Express Lane Ramps to the North General Purpose Lanes – New Construction Express Lanes Collector / Distributor Lanes Non-Interstate Roadwork General Purpose Lanes Egress from the East General Purpose Ramp Access Express Lane Ramp Access Ramp Access Points Existing Local Road Connections From Access Points Existing Ramp Access To Be Removed

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend