Welcome Community Consultation Phase 2: Exploring the Options March 11 April 2, 2013 About the Project S TAGES O F P LANNING A ND C ONSULTATION ONGOING Community Relations We#are# here# ONGOING Community Relations Project


slide-1
SLIDE 1

Community Consultation

Welcome

Phase 2: Exploring the Options

March 11 – April 2, 2013

slide-2
SLIDE 2

About the Project

We#are# here#

STAGES OF PLANNING AND CONSULTATION

ONGOING – Community Relations ONGOING – Community Relations

slide-3
SLIDE 3

Project Background

  • Key component of the provincial transportation

system, linking gateways and communities

  • Significant and growing congestions
  • Growing demand, especially off-peak
  • Forecast future growth
  • Life cycle challenges in next 10-15 years
slide-4
SLIDE 4

Current Phase

Exploring the Options

  • Share information, including Phase 1 input
  • Answer your questions
  • Seek input on potential replacement scenarios and

the criteria to evaluate them

  • Provide information on next steps

Outcome: Consultation summary report Determine which option(s) to take forward for additional analysis

slide-5
SLIDE 5

Phase 1 Consultation Results

  • Congestion at the tunnel is a significant problem
  • Replacement options must consider economic

growth, as well as transportation alternatives

  • Sense of urgency to move forward
  • Also need short term solutions
slide-6
SLIDE 6

Technical Update

  • Traffic patterns have changed
  • Forecast future growth in all modes of traffic
  • Geotechnical, seismic and constructability

information

  • Need for long- and short-term solutions
slide-7
SLIDE 7

Draft Project Scope

Highway 99 from Bridgeport Road to the U.S. border

slide-8
SLIDE 8

Draft Project Goals

Improve safety Relieve congestion Protect the existing land base Involve community Support trade and commerce Support

  • bjectives for regional

people movement

slide-9
SLIDE 9

Draft Evaluation Criteria

Efficient transportation for all users Safety Agriculture Environment Jobs and the economy Social and community considerations

slide-10
SLIDE 10

Potential Crossing Scenarios

Scenario 1 – Maintain existing tunnel Scenario 2 – Replace existing tunnel with new bridge Scenario 3 – Replace existing tunnel with new tunnel Scenario 4 – Maintaining existing tunnel and build new crossing along existing Hwy 99 corridor Scenario 5 – Maintain existing tunnel and build new crossing in new corridor

slide-11
SLIDE 11

Scenario 1: Upgrade Existing

Key$Features:$

  • Upgrade#exis.ng#

infrastructure#

  • Improved#ligh.ng#in#tunnel#
  • No#increase#in#lane#capacity#
  • No#addi.onal#cyclist/

pedestrian#facili.es#

  • Limited#seismic#

improvements#at#the#tunnel#

slide-12
SLIDE 12

Scenario 2: New Bridge

Key$Features:$

  • New#bridge#
  • Remove#exis.ng#tunnel;#

upgrade#other#infrastructure#

  • Addi.onal#capacity#
  • Mul.Cuse#path#for#cyclists#and#

pedestrians#

  • Dedicated#transit/HOV#lanes#
  • Meet#current#seismic#

standards#

slide-13
SLIDE 13

Scenario 3: New Tunnel

Key$Features:$

  • New#tunnel#
  • Remove#exis.ng#tunnel;#

upgrade#other#infrastructure#

  • Addi.onal#capacity#
  • Mul.Cuse#path#for#cyclists#and#

pedestrians#

  • Dedicated#transit/HOV#lanes#
  • Meet#current#seismic#

standards#

slide-14
SLIDE 14

Scenario 4: Old/New Combo

Key$Features:$

  • Upgrade#exis.ng#tunnel#
  • Construct#new#crossing#

immediately#upstream#

  • Upgrade#other#infrastructure#
  • Addi.onal#capacity#
  • Mul.Cuse#path#for#cyclists#and#

pedestrians#

  • Dedicated#transit/HOV#lanes#
  • Meet#current#seismic#

standards#

slide-15
SLIDE 15

Scenario 5: New Alignment

Key$Features:$

  • Upgrade#exis.ng#tunnel#
  • Construct#new#crossing#Near#

No.#8#Road#

  • Upgrade#other#infrastructure#
  • Addi.onal#capacity#
  • Mul.Cuse#path#for#cyclists#and#

pedestrians#on#new#crossing#

  • Limited#seismic#improvements#

at#exis.ng#tunnel#

  • Consider#addi.onal#network#

improvements#

slide-16
SLIDE 16

Next Steps

STAGES OF PLANNING AND CONSULTATION

ONGOING – Community Relations ONGOING – Community Relations

  • Prepare consultation report
  • Continue technical analysis
  • Develop business case
slide-17
SLIDE 17

Thank You

  • Visit masseytunnel.ca
  • Attend an Open House
  • Complete Feedback Form
  • Sign up to Receive Project Updates

Stay Involved