WELCOME June 6, 2018 -- 1 DESIGN ADVISORY COMMITTEE for MIDWAY PEACE - - PowerPoint PPT Presentation

Wadajir aan udisano xarun ciyareed oo caruurteena anfici donta mustaqbalka Baga nagayaan dhuftan Walii wajjiin paarkii kana haa ijaarru Together lets get this park built WELCOME June 6, 2018 -- 1 DESIGN ADVISORY COMMITTEE for MIDWAY PEACE


slide-1
SLIDE 1

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 1

WELCOME

Wadajir aan udisano xarun ciyareed oo caruurteena anfici donta mustaqbalka Baga nagayaan dhuftan Walii wajjiin paarkii kana haa ijaarru Together let’s get this park built

slide-2
SLIDE 2

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 2

AGENDA

MEETING 3 - JUNE 6, 2018

High School for the Recording Arts 1. Welcome and Introductions (5:30 - 5:40 PM)

a) Project update: engineer contract status, environmental testing, artist process

2. Layouts from Last Meeting (5:40 - 5:50 PM)

a) Review four groups’ park arrangements b)Discuss ideas generated from layouts

3. Concept Layout Plans (5:50 - 6:15 PM)

a) Review three concepts b) Discuss priorities for park layout - what did you like? What did we leave out?

4. Amenities and Preferences (6:15 - 6:45 PM)

a) Present photos of potential park amenities and styles b) Split into two groups Group 1 votes on amenities by placing a sticker on their preference Group 2 votes on layout plans (and can comment by writing on post-it)

  • -then switch-- 10 minutes each, 20 minutes total

5. Wrap-up (6:50 - 7:00 PM) a) Feedback

b) Next steps and schedule c) Questions

slide-3
SLIDE 3

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 3

PARK CONSTRAINTS

SCALE IN FEET 0 37 75 150 NORTH

SKYLINE RAYVEN, INC ABRA AUTO BODY COMMUNITY ACTION PARTNERSHIP RAMSEY- WASHINGTON ALLY PEOPLE SOLUTIONS HIGH SCHOOL FOR THE RECORDING ARTS GORDON PARKS HIGH SCHOOL GOODWILL ALDI WILDER FOUNDATION CARTY HEIGHTS HEALTH PARTNERS OPEN CITIES HEALTH CENTER

INTERSTATE 94 UNIVERSITY AVENUE

  • ST. ANTHONY AVE

BIGELOW LANE LEXINGTON PKWY STATION HAMLINE AVE STATION

CENTRAL MIDWAY

BIKEWAY BIKEWAY

SITE CHALLENGES

  • Steep hill and wall
  • Parking easement on south parcel
  • Utility poles and fences create barriers

SOCIAL

  • Few parks in nearby area (north of I-94)
  • Social gathering at Target, ALDI, near high

schools - goal to bring that energy to the park

CONNECTIVITY

  • Reach across I-94, greening the Griggs bridge,

make MPP and Dunning complementary parks (concept that Parks can support but, not in this project)

  • Keep the MPP field un-programmed and open

to everyone

DUNLAP ST N GRIGGS ST N SYNDICATE ST

Steep hill and wall Sign and light pole Fence Future Park Area

slide-4
SLIDE 4

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 4

Text

Oxford/Jimmy Lee Recreation Center

Multi-purpose synthetic field (football, soccer, lacrosse, baseball, softball) Picnic area Playground Plus indoor amenities

Carty Park

Basketball 2 Tennis courts Playground BBQ Picnic area Walking paths

Dunning Sports Complex

1 Basketball full court 3 Softball fields 3 Baseball fields 5 Tennis courts 2 Batting cages Playground Picnic area Restrooms Warming room Plus indoor amenities

Central High School

* only available after school

Running track Football field Soccer field JJ Hill Montessori

* only available after school Playground 2 Softball Garden

Galtier Elementary School

* only available after school Softball Playground

LEAP High School / Wilson Junior High

Baseball Soccer

Maxfield Elementary School

* only available after school Basketball Playground Open field

Frogtown Park and Farms

Playground Walking paths Art Farm/Garden

Ryan Park

Playground Walking paths

Aldine Park Basketball Softball 2 Horseshoe rings Playground Picnic area Shelter BBQ Skating rink Hamline Park

Basketball court Tennis court BBQ Picnic area Playground

Concordia University *Not for public use/ permission required Hamline Hague Park Playground / tot-lot

= half mile radius from MPP = amenities within a half mile from MPP

AMENITIES NEAR MIDWAY PEACE PARK

SCALE IN FEET 0 250 500 1000 NORTH

slide-5
SLIDE 5

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 5

WHAT FITS AT MIDWAY PEACE PARK?

6,000 sf playground 9,800 sf playground Amphitheater with plaza Half court basketball Make your own path using pipe-cleaners 10,000sf

  • pen lawn

5,000sf

  • pen

lawn 20,000sf

  • pen lawn

25,000sf

  • pen lawn

Court/Field Open Field Playground Walking path Tree Plaza Slope Art / sculpture Water feature Pavilion Stormwater area or rain garden

4,800 sf plaza 1,500 sf plaza

  • ST. ANTHONY AVENUE

Central Midway Open Cities Health Center Health Partners High School for the Recording Arts Abra Auto Body Gordon Parks High School Rayven Skyline

DUNLAP ST N UNIVERSITY AVENUE GRIGGS ST N

SCALE IN FEET 0 20 40 80 NORTH

slide-6
SLIDE 6

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 6

GROUP LAYOUT #1

DUNLAP ST N UNIVERSITY AVENUE GRIGGS ST N

SCALE IN FEET 0 20 40 80 NORTH

NOTES ON LAYOUT 1

  • Terraced gardens down the hill, with a large stormwater/

rain garden feature at the bottom

  • Placed art at the high point (visibility), and in planted area
  • Corner near Health Partners has playground, a fitness zone

(for adults), and seating for families/elders

  • Larger structured outdoor classroom in hill for high school
  • use. Second casual amphitheater space facing the fields
  • Pavilion at the top of the hill, close to Griggs St and the

back of the outdoor classroom, paired with a plaza

  • Planted buffers near Health Partners and Open Cities, for

people walking, offers a place to sit and appreciate art

  • Mixture of courts and planted areas with benches/picnic

tables in south

slide-7
SLIDE 7

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 7

GROUP LAYOUT #3

DUNLAP ST N UNIVERSITY AVENUE GRIGGS ST N

SCALE IN FEET 0 20 40 80 NORTH

NOTES ON LAYOUT 3

  • Deliberate about putting the play area (the main one) in a

place that was visible and accessible for views from the pavilion so the elders felt like they were part of the activity.

  • Make sure there is shaded seating for the elders
  • Most interested in basketball
  • Want multiple crossings/entrances to the park from the other

side of Griggs St.

  • Want connections to be made to the east of the park using

entrances and plaza spaces.

slide-8
SLIDE 8

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 8

GROUP LAYOUT #4

DUNLAP ST N UNIVERSITY AVENUE GRIGGS ST N

SCALE IN FEET 0 20 40 80 NORTH

NOTES ON LAYOUT 4

  • Play/sloped climbing wall on hill.
  • Art and water together.
  • Buffer of greenery at the Health Partners parking lot and

the middle/Whitaker parcel.

  • Excited about a southern path that weaves between groups
  • f seating and trees to create smaller gathering areas.
  • The large play area toward the center of the middle

(Whitaker) parcel, to ensure safety and sightlines.

  • Art on the edge of a welcoming plaza centered along Griggs

St, thinking it would be useful for gathering.

  • Pavilion moved into the green space.
slide-9
SLIDE 9

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 9

GROUP LAYOUT #5

DUNLAP ST N UNIVERSITY AVENUE GRIGGS ST N

SCALE IN FEET 0 20 40 80 NORTH

NOTES ON LAYOUT 5

  • Felt the narrow south area should draw elders and children

in to the park, placed a small playground there with seating.

  • Sought to maximize the walking loop length, placing it near

activity, for example, basketball. A meandering path around the other park areas would be attractive and utilized.

  • Stormwater flowing over retaining wall into a shallow pond
  • n the north parcel.
  • Park users look for seating, want seating provided through low

perimeter barriers (vs. fencing), etc.

  • Want a play area that serves older children
  • Different from others with tot-lot in south, no pavilion, and

inclusion of full court basketball (which teens want).

slide-10
SLIDE 10

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 10

OPTION 1 - CASCADE

DESCRIPTION

  • Use the middle of the slope for stormwater -

creates a cascade, as various groups suggested

  • Garden in corner between GPHS and HSRA
  • Playground based on groups 1 and 3 location; tot-

lot in south near where group 5 put it (but further into park for safety)

  • Amphitheater pushed toward area between HSRA

and GPHS, as group 3 located it. The amphitheater is hard edged, structural.

  • Sloped walkway near Griggs St., grass at a gentle
  • slope. Allows sight lines from bottom of hill to top.
  • Stormwater moved toward Griggs St like in group 5
  • Fitness and basketball in the south, similar to

groups 5 and 1

SKYLINE RAYVEN, INC ABRA AUTO BODY HIGH SCHOOL FOR THE RECORDING ARTS GORDON PARKS HIGH SCHOOL HEALTH PARTNERS OPEN CITIES HEALTH CENTER

UNIVERSITY AVENUE BIGELOW LANE

  • ST. ANTHONY AVE

CENTRAL MIDWAY

BIKEWAY BIKEWAY

Court/Field Open Field Playground Walking path Plaza Slope Art / sculpture Water feature Pavilion Garden or planted buffer area

DUNLAP ST N GRIGGS ST N

FIT PLAYGROUND

SCALE IN FEET 0 25 50 100 NORTH

slide-11
SLIDE 11

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 11

OPTION 1 - CASCADE

SCALE IN FEET 0 25 50 100 NORTH

919 920 921 923 924 925 926 927 928 929 930 931 932 933 918 917 916 915 914 913 912 922 919 920 921 923 924 925 926 927 928 929 930 931 932 933 918 917 916 915 914 913 912 922

OPEN FIELD ADA RAMP WATER FEATURE OPEN FIELD PATH CASCADING WATER FEATURE PLAZA OPEN FIELD ADA RAMP BOULEVARD TREES ALONG GRIGGS ST

SCALE IN FEET 0 5’ 10’ 20’ NORTH

CASCADE CONCEPT - SECTION LOOKING AT GRIGGS ST (TO THE EAST)

SEATTLE - FREEWAY PARK WIKIPEDIA - PHOTO BY JOE MABEL

Court/Field Open Field Playground Walking path Plaza Water feature Pavilion Garden or planted buffer area Line of existing conditions

FIT PLAYGROUND

slide-12
SLIDE 12

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 12

OPTION 2 - THREE RINGS

CONCEPT DESCRIPTION

  • Slope dominated by amphitheater and walkway
  • Water pool at top of slope, larger stormwater basin at

corner between GPHS and HSRA

  • Amphitheater is naturalized, with grass and

boulders (some soft edges, some hard)

  • Playground located toward the middle of the flat

green middle parcel, similar to group 4

  • Fitness moved south but still within sight of play
  • Basketball in north (group 5) with art wall
  • Buffer of planted area between Health Partners

parking and open space - like group 1

  • Pavilion located similar to group 1
  • Art near stormwater like group 5

DUNLAP ST N

SKYLINE RAYVEN, INC ABRA AUTO BODY HIGH SCHOOL FOR THE RECORDING ARTS GORDON PARKS HIGH SCHOOL HEALTH PARTNERS OPEN CITIES HEALTH CENTER

UNIVERSITY AVENUE BIGELOW LANE

  • ST. ANTHONY AVE

CENTRAL MIDWAY

GRIGGS ST N BIKEWAY BIKEWAY

Court/Field Open Field Playground Walking path Plaza Slope Art / sculpture Water feature Pavilion Garden or planted buffer area

FIT PLAYGROUND

SCALE IN FEET 0 25 50 100 NORTH

slide-13
SLIDE 13

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 13

OPTION 2 - THREE RINGS

SCALE IN FEET 0 25 50 100 NORTH

FIT PLAYGROUND

919 920 921 923 924 925 926 927 928 929 930 931 932 933 918 917 916 915 914 913 912 922 919 920 921 923 924 925 926 927 928 929 930 931 932 933 918 917 916 915 914 913 912 922

OPEN FIELD PLAY AREA PICNIC SHELTER RAMP AMPHITHEATER STAGE PATH PLAZA

SCALE IN FEET 0 5’ 10’ 20’ NORTH

THREE RINGS CONCEPT - SECTION LOOKING AT GRIGGS ST (TO THE EAST)

Court/Field Open Field Playground Walking path Plaza Water feature Pavilion Garden or planted buffer area Line of existing conditions

slide-14
SLIDE 14

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 14

OPTION 3: HILL FOR PLAY

CONCEPT DESCRIPTION

  • Playground on hill, similar to group 4
  • Stormwater interacts with playground edge
  • Path intersects with amphitheater (some seating,

some walls)

  • Plazas where path and amphitheater meet
  • Fitness and basketball moved further from play

area, create a draw to the south part of the park

  • Plaza connects HSRA and access to GPHS
  • Art at top of amphitheater like groups 4 + 5

SCALE IN FEET 0 25 50 100 NORTH

DUNLAP ST N

SKYLINE RAYVEN, INC FIT PLAYGROUND ABRA AUTO BODY HIGH SCHOOL FOR THE RECORDING ARTS GORDON PARKS HIGH SCHOOL HEALTH PARTNERS OPEN CITIES HEALTH CENTER

UNIVERSITY AVENUE BIGELOW LANE

  • ST. ANTHONY AVE

CENTRAL MIDWAY

GRIGGS ST N BIKEWAY BIKEWAY

Court/Field Open Field Playground Walking path Plaza Slope Art / sculpture Water feature Pavilion Garden or planted buffer area

slide-15
SLIDE 15

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 15

OPTION 3: HILL FOR PLAY

SCALE IN FEET 0 25 50 100 NORTH

919 920 921 923 924 925 926 927 928 929 930 931 932 933 918 917 916 915 914 913 912 922 919 920 921 923 924 925 926 927 928 929 930 931 932 933 918 917 916 915 914 913 912 922

PLAZA SPACE SEATING TERRACE STAIR RETAINING WALL OPEN FIELD PLAZA / WATER BASIN OPEN FIELD PLANTED AREA PICNIC SHELTER PATH PLAY AREA OPEN FIELD PLANTED AREA

SCALE IN FEET 0 5’ 10’ 20’ NORTH

HILL FOR PLAY CONCEPT - SECTION LOOKING AT GRIGGS ST (TO THE EAST)

Court/Field Open Field Playground Walking path Plaza Water feature Pavilion Garden or planted buffer area Line of existing conditions

slide-16
SLIDE 16

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 16

TODAY WE WILL:

Confirm order of priorities for large park parts Indicate your preferred concept using stickers Comment on concepts using post-its Use stickers to indicate amenity style preferences

STEP TWO - LOCATIONS FOR SMALL AMENITIES

Where we put the large parts influences the location of smaller parts. This step will happen as the design evolves. Small parts include: Drinking fountain Lighting Benches Picnic tables BBQ grills Trees (required) Bike racks (required) Signage (required)

STEP ONE - ARRANGE LARGE PARK PARTS (PROGRAM)

We are deciding how the big program areas fit together within Midway Peace Park (MPP). Large parts include: Sports/fitness (20%) Play (16%) Pavilion/gathering area (15%) Open lawn areas, garden/planted areas (12%) Walking paths (11%) Water feature/stormwater (10%) Grills/Food (8%) Art (7%) Amphitheater Does this order reflect what you want in the park?

PARK DESIGN PROCESS

slide-17
SLIDE 17

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 17

PAVILION AMENITIES

slide-18
SLIDE 18

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 18

ACTIVE PLAY AMENITIES - PLAYGROUND

slide-19
SLIDE 19

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 19

ARTISTIC AMENITIES

SCULPTURE: JAMES BRENNER SCULPTURE: GITA GHEI

slide-20
SLIDE 20

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 20

PLAY AMENITIES & SPACES ACTIVE PASSIVE

slide-21
SLIDE 21

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 21

PLANTED AREA/GARDEN STYLE ALONG PATH PLANTED AREA ON SLOPE GARDEN

slide-22
SLIDE 22

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 22

STORMWATER AMENITIES

SEATTLE - FREEWAY PARK WIKIPEDIA - PHOTO BY JOE MABEL

slide-23
SLIDE 23

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 23

NEXT STEPS AND SCHEDULE

HAMLINE MIDWAY ELDERS ICE CREAM SOCIAL JUNE 26, 2018

6:30 - 8:00 PM Hamline Methodist Church

LEXINGTON HAMLINE COMMUNITY COUNCIL ICE CREAM SOCIAL - JULY 22, 2018

1:00 - 3:00 PM Hamline-Hague Tot Lot Middle parcel will be open through the summer!

OPEN HOUSE - JULY 2018

Design concept: grading, layout, materials Cost estimate with engineering input

POTENTIAL ARTIST CALL FALL 2018 CONSTRUCTION BEGINS SPRING 2019 PARK CONSTRUCTION COMPLETE IN LATE 2019

slide-24
SLIDE 24

DESIGN ADVISORY COMMITTEE for MIDWAY PEACE PARK - #3

June 6, 2018 -- 24

QUESTIONS?

THANK YOU!