Watch Your Signal Kane County Division of Transportation (KDOT) June - - PowerPoint PPT Presentation

watch your signal
SMART_READER_LITE
LIVE PREVIEW

Watch Your Signal Kane County Division of Transportation (KDOT) June - - PowerPoint PPT Presentation

Watch Your Signal Kane County Division of Transportation (KDOT) June 18 th 2019 Presented by: Stephen Zulkowski, P.E., PTOE Watch Your Signal Traditional Traffic Signal Sequencing Stage 1 Stage 2 Stage 3 Stage 4 We have Options


slide-1
SLIDE 1

Watch Your Signal

Kane County Division of Transportation (KDOT)

June 18th 2019 Presented by: Stephen Zulkowski, P.E., PTOE

slide-2
SLIDE 2

 Traditional Traffic Signal Sequencing  We have

Options

Watch Your Signal

Stage 1 Stage 2 Stage 3 Stage 4 N Randall

slide-3
SLIDE 3

Two Projects are related to this discussions.

 Upcoming Adaptive Traffic Signal Project

 Randall Road between Big Timber Road to Huntley Road

 Upcoming Signal Re-Timing (Re-Optimization)

 Randall Road between Fabyan Parkway to Silver Glen

Road

 We have

Options

Watch Your Signal

slide-4
SLIDE 4

 What is the

Option?

Watch Your Signal

slide-5
SLIDE 5

 What is the bet

etter ter Option?

 What would change?

Watch Your Signal

Consider alternatives in signal sequences Reduce average motorist delay by 5 to 10% Used by IDOT and other State DOTs

slide-6
SLIDE 6

 What is the bet

etter ter Option?

 What would change?  Where would this be implemented?

Watch Your Signal

The Green Left Turn Arrow will not ALWAYS come up first Consider alternatives in signal sequences Reduce average motorist delay by 5 to 10% Used by IDOT and other State DOTs

slide-7
SLIDE 7

 What is the bet

etter ter Option?

 What would change?  Where would this be implemented?  Why Now?

Watch Your Signal

The Green Left Turn Arrow will not ALWAYS come up first Only where an Alternative Sequence is more effective at reducing delay Consider alternatives in signal sequences Reduce average motorist delay by 5 to 10% Used by IDOT and other State DOTs

slide-8
SLIDE 8

Watch Your Signal

 What is the

Option (more details):

Fabyan Gleneagle Christina Fargo Randall

slide-9
SLIDE 9

Watch Your Signal

 What is the

Option (more & more, details):

Lead, Lag Sequence Example Gleneagle Christina Fargo

slide-10
SLIDE 10

 Division of Transportation (KDOT) Intentions:  Prior to initial project implementations:  The

thing to remember from today:

Watch Your Signal

slide-11
SLIDE 11

Questions?

slide-12
SLIDE 12

Thank You!