Aungkhoon Bunya
Chief of East Bank Water Resources Section Water Quality Surveillance Division Water Quality Department
Wason Haesongsiri
Director of Water loss management
- peration
Technology Division Water loss management Department
Wason Haesongsiri Aungkhoon Bunya Director of Water loss - - PowerPoint PPT Presentation
Wason Haesongsiri Aungkhoon Bunya Director of Water loss management Chief of East Bank Water operation Resources Section Technology Division Water Quality Surveillance Division Water loss management Department Water Quality Department
Aungkhoon Bunya
Chief of East Bank Water Resources Section Water Quality Surveillance Division Water Quality Department
Wason Haesongsiri
Director of Water loss management
Technology Division Water loss management Department
❑ Number of customer : 2.2 Million ❑ Production : 2,000 ML M^3/Y ❑ Pipe Length : 32,000 km ❑ Coverage Area : 3,195 sq.km ❑ NRW Level : 30%
Bangkok Metropolitan Administration (BMA.) Nonthaburi Samutprakarn
Raw Water Resource
Drinking Water Waste Water
Department of Water Resource Royal Irrigation Department MWA,PWA Local , BMA
Production-Transmission and Distribution System
Operation Pressure: 8.8 m Water Loss : 1.5 M M^3/day Pipe system
PVC : 24,136 km (78.7%) AC : 3,927 km (12.8%) ST : 1,979 km (6.5%) (CI,DI,GI,HDPE,PB,PC,PE) : 612 km (2%)
96 km
Seawater intrusion
Samlae Pumping Station Salinity value < 0.25 g/l
2014 - 2016
Find out the appropriate salinity management affected in tap water quality during drought crisis.
Obstacles
Do not change raw water sources Conventional Water Treatment
Salinity level < 0.25 g/l or Conductivity < 500 μS/cm ▪ Monitoring and remote measuring points ▪ Field monitoring salinity ▪ Forecasting seawater intrusion
Chart of tap water salinity level and conductivity during 2014 - 2016
Salinity level of raw water and tap water in 2016
▪ Limitations of MWA are unchangeable main raw water source and conventional water treatment technology. ▪ Problem solving should be integrated with disciplinary
▪ MWA raw water pumping management, which is decreased by more than 10% off the tap water salinity level. ▪ The cooperation with Royal Irrigation Department contributes to increase drainage to push the saline water back to the sea.
Tunnel Diversion Advance Treatment Technology
https://www.pub.gov.sg/PublishingImages/NEWaterDemographics.jpg
% Water Loss, MWA (Thailand)
74.0 64.4 56.0 48.8 45.4 50.3 45.8 40.5 33.6 29.5 31.7 42.1 35.6 30.1 31.0 25.3 28.5 24.6 32.3 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 1968 1972 1976 1980 1984 1988 1992 1996 2000 2004 2008 2012 2016
WL%
Economic Crisis
Routine sounding unreported burst
Set up Block
system
measure
Leakage Survey Activities Set up DMA. To manage leakage WLMA
Passive Leakage Control Active Leakage Control Leakage Management
(IWA. Concept.)
2 Cycles per Year Rational Intensive Pipe Replacement
900 km 1,500 km 300-400 km/yr 1000/yr
Density Areas/Owner Permission Complex Pipe System Lot of No Customer/Demand Forecast Low Pressure (below 1 bar) Pipe Meterial (non-metalic)
Asset Management
Pipe replacement Project
Satellite Survey JD7 Inpipe Survey Hydraulic Model
lost focus or stop
leakage survey
management