wasmi holding
play

WASMI HOLDING Company Profile Presentation Wasmi Holding - PowerPoint PPT Presentation

WASMI HOLDING Company Profile Presentation Wasmi Holding Established in 1975 by Wasmi Hamad Al Khaleeb Company was named Wasmi Holding in 2012 Capable of meeting any requirement in the field of general construction, civil


  1. WASMI HOLDING Company Profile Presentation

  2. Wasmi Holding ∗ Established in 1975 by Wasmi Hamad Al Khaleeb ∗ Company was named Wasmi Holding in 2012 ∗ Capable of meeting any requirement in the field of general construction, civil construction, mechanical construction and rental equipment ∗ Safe Working Conditions ∗ Quality Management System

  3. Content ∗ Wasmiholding ∗ Human Resources ∗ Pipeline Construction ∗ Road Construction ∗ Tower Construction ∗ Machine Maintenance ∗ Rental Equipment ∗ Equipment Fleet ∗ Quality Assurance & Control ∗ Health, Safety & Environment ∗ Current Projects ∗ Completed Projects ∗ Pipeline Construction Gallery ∗ Our Clients

  4. Human Resource Team Number Engineer 11 Supervisor 18 Inspectors 15 Surveyors 16 General foreman 40 Steel fixer 18 Carpenters 12 Plumbers 18 Electricians 6 Mason 21 Store keeper 11 Structural steel erectors 12 Operator / Driver 24 Helpers 20 Labor 30 Welder 25 Pipefitter 15 Operator 130 Driver 128 Side boom operator 12

  5. Oil Pipeline Unique set of pipeline services provided by us include :  Pipeline Construction  Integrity Service  Subcontractor Management  Labour Resource Management

  6. Pipeline Construction The pipeline construction services provided by us include:  Welding and weld repairs  Cold Bending  NDT Testing  Painting, Blasting, Coating and holiday testing  Tie-in welds  Site preparation, including Excavation and Backfilling  Padding, lowering, backfilling, compacting, forming, berm and crude oil stabilization of the berm  Fabrication and installation of signage  Hydrotesting

  7. Pipeline Construction

  8. Pipeline Integrity Service We provide maintenance, rehabilitation and installation of piping and facilities services to the oil and gas transmission industry. We offer customers the following pipeline integrity services:  Investigative digs  Hydrostatic retests  Corrosion remediation  Leak repair  Replacement  Pipeline replacement and construction, and  Pipeline cleaning

  9. Pipeline Integrity Service

  10. Road Construction Our services include all aspects of Road and Highway Construction for the public sector as well as large parking areas and airport runways for the private sector. A sampling of our wide range of services includes:  Roads and Highways (new construction and rehabilitation)  Bridges, Culverts, & Concrete Pavement Structures  Entranceways & Parking Lots  Curbs, Traffic Islands, Sidewalks, and Retaining Walls  Underground Sewers Drainage System

  11. Road Construction

  12. Tower Construction Our work and experience expands from site-development and construction, to maintenance and inspection of pre-existing sites. The company provides turnkey construction services for the telecommunications and broadcast industries.

  13. Tower Construction

  14. Machine Maintenance ∗ Machine tool repair and maintenance Services include tool leveling and alignment, way and spindle taper grinding, calibration, and hydraulic and lubrication system upgrade with various specifications and capacities. ∗ We have the necessary tools, equipment and expertise to rebuild and aid in repair of all kinds of equipment as required by our customers.

  15. Machine Maintenance

  16. Transport & Rental Equipment Division ∗ Wasmiholding has built up a wide ranging fleet of heavy construction equipment. Our product line includes everything from small hand held tools to large earthmovers. ∗ While having a wide variety of tools and equipment is important, making sure they are all operating correctly is most important. We understand that our fleet is the cornerstone of our business and we stand behind the quality equipment we rent.

  17. Equipment Fleet Vehicle Type Number Sedan Car 35 Pickup 18 Bus (15 Seats) 17 Bus (25 Seats) 10 Excavator 35 Loader 16 Roller Compactor 12 Plate Compactor 4 Dozer 51 Crane 4 Dump Truck 45 Water Tanker 24 Grader 12 Flat Bed 20 Low Bed Hydraulic 12 Trailer 25 Electric Generator 16 Truck 19 Boom Truck 5T & 10T 21 Side Boom 12

  18. Transport & Rental Equipment Division

  19. Health Safety and Environment It is the policy of Wasmiholding to comply fully with all applicable laws and regulations concerning construction activities on campus. We have Safety Plans that are adequate to protect the safety of people and property within the construction site and the surrounding area.

  20. Organogram President General Manager Manager Operations Construction Services Department Department Safety Manager Project Control And Maintenance Dept. Equipment Rental Project Manager Quality Control Support Manager Division Procurement Coordinator Project Engineer 1 Workshop Dept. Quality Control Incharge Safety Supervisor Supervisor Planning Dept. Project Engineer 2 Logistics And Mechanic/ Layman Transport Officer Quality Control Safety Engineer Estimation Dept. Construction Engineer Officer

  21. Clients

  22. On-Going Projects • Kentz/Saudi Aramco • Saudi Aramco • Saudi Aramco • Project: Remaining Works For • Project: Remeining Works For • Project: Remaining Works For GOSP-3 Pipeline Pipelines Between NGL, GOSP-1 GOSP-2 Pipelines And GOSP-4 Including Valve • Shaybah Interconnecting • Shaybah Interconnecting Hydro Testing. Pipelines Pipelines • Shaybah Interconnecting Pipelines Project 1 Project 2 Project 3

  23. Completed Projects Saudi Aramco ARGAS WesternGeco Project: Design and ARGAS construction of Project : Equipment rental communication link , tower Project: Pipeline & services and associated facilities at Project : Drilling Project construction project Al- Uqair beach Start Date: Sept 1 st , 2010 Start Date: May 28 th , 2011 Start Date: June 1 st , 2007 Start Date: Dec 1 st , 2013 Completion Date: May 28 th , 2014 Makamin Petroleum Makamin Petroleum Sinopec Project: Construction of PDHMS and E&I for 8 HWYH Project: Installation of four and HRDH wells, SSV/SSV water injection centrifugal Project: Equipment surface panels installation pumps in ABQ area maintenance for 13 UTMN wells Start Date: Sept 20 th , 2011 Start Date: Aug 19 th , 2009 Start Date: Dec 13 th , 2011 Completion Date: Sept 10 th , Completion Date: June 30 th , 2014 2014

  24. Thank you

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend