vt metal kft
play

VT METAL Kft. Machining, electroplating and assembly services a - PowerPoint PPT Presentation

VT METAL Kft. Machining, electroplating and assembly services a Videoton Holding subsidiary Location :Szkesfehrvr Production Area: Total area:8.000 m 2 Number of Employee: 362 Quality Certificates: ISO / TS 16949 ISO 9001


  1. VT METAL Kft. Machining, electroplating and assembly services a Videoton Holding subsidiary

  2. Location :Székesfehérvár • Production Area: Total area:8.000 m 2 • Number of Employee: 362 • Quality Certificates: ISO / TS 16949 ISO 9001 ISO 14001 ISO 50001 • Turnover (2015): Machining: 11.636.000 EUR Surface treatment: 5.610.000 EUR

  3. Turnover 18000 16000 14000 12000 Turnover Total (tEUR) 10000 8000 Turnover Mechanical (tEUR) 6000 4000 Turnover Electroplating 2000 (tEUR) 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 Headcount 350 300 250 200 150 100 50 0 2007 2008 2009 2010 2011 2012 2013 2014 2015

  4. Mechanical BU Automotive 48% Electrical sector 40% Telecommunic Electric a-tion industry Machine 15% 26% Industrial sector production 12% 15% Consumer goods 4% Shop equipment Automotive 3% industry Building 30% industry 15% Electroplating BU

  5. Investments Investments  2010: III. Brother machining center  2011: IV. Brother machining center Machining tEUR  2011: Chiron twin spindle 5 axis machining center Electroplating tEUR  2011: Part cleaning machine 1800  2012: V. Brother machining center 1600  2013: New electroplating line 1400  2013: 4 pcs. Brother machining center 1200  2013: 3D Measuring machine 1000  2014: 4 pcs. Brother machining center ; 800  2014: X-ray thickness measuring equipment; 600  2015: 2 psc Brother machining center; 400  2015: Circular saw; 200  2015: Part cleaning machine; 0  2015: Immersion tin coating line 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016  2016: 2 pcs Brother machining center, 3D Measuring machine, New building; KTL line, new immersion tin coating line  Videoton is willing to further invest if the business requires it.

  6. Quality Certificates • ISO TS 16949:2009 (2003) • ISO 9001:2008 (1997) • ISO 14001:2004 (2003) • ISO 50001:2011 (2016)

  7. Machining

  8. Core technologies I. Technologies • 19 pcs of machining centers:  17 pcs 1-spindle: (Brother  2 pcs 2-spindle (Stama, Chiron) • Surface finishing:  Washing  Vibration tumbling  Impregnation  Leak-test

  9. Core technologies II. Machining centre Max. size of work Spindle speed No. of axis & Quantity Palettes (min -1 ) (mm) spindles 1 spindle BROTHER TC-32 600x400x300 16000 17 2 4-axis / 3-axis 2 spindles, CHIRON DZ15 730x400x425 12000 1 2 5-axis STAMA MC 326 2 spindles, 520x300x360 12000 1 2 TWIN 3-axis

  10. Core technologies III. Capabilities • Materials:  Aluminium high pressure die-castings (hungarian sub-suppliers)  Aluminium gravity die-castings  Aluminium profiles & blocks  Copper rods & profiles  Other castings (iron casting)  Copper forging • Optimum weight: 0,1 – 1,5 kg • Maximum weight: 8 kg • Minimum tolerance: IT6 ≤ • Optimum lot size: 500 – 4.000 pcs. • Annual volumes: 10k - 500k

  11. Product references – Machining I. Made for: Automotive industry Made for: Automotive industry Annual volume: 80.000 pcs Annual volume: 120.000 pcs Material: GG20 Material: AlSi Surface treatment:MnPh Made for: Electrical industry Made for: Electrical industry Annual volume: 10.000 pcs. Annual volume: 25.000 pcs Material:Al (profile) Material: Al (profile) Surface treatment: Ni Surface treatment: Ni

  12. Product references – Machining II. Made for: Automotive industry Made for: Automotive industry Material:AlSi Material: AlSi Annual volume: 60.000 pcs Annual volume: 70.000 pcs Made for: Automotive industry Made for: Automotive industry Material: AlSi Material: AlSi Annual volume: 500.000 pcs Annual volume: 500.000 pcs

  13. Product references - Machining III. Caterpillar Material: S235 Deutz Annual volume: 5.000 pcs. Material: AlSi Surface treatment: MbPh Annual volume: 60.000 pcs. Scania Deutz Material: G620 Material: ALSi Annual volume: 80.000 pcs. Annual volume: 60.000pcs

  14. Product references – Machining IV. Made for: Electrical industry Made for: Electrical industry Material: CuETP Material: CuETP Annual volume: 58.000 pcs Annual volume: 5.000 pcs Surface treatment: Ag Surface treatment: Ag Made for: Electrical industry Made for: Electrical industry Material:CuETP Material: CuETP Annual volume: 48.000 pcs Annual volume: 5.000 pcs Surface treatment: Ag Surface treatment: Ag

  15. Core technologies IV. Turning, milling, grinding • 6 pcs of CNC lathes:  3 pcs 1 spindle: Index, Heidenreich & Harbeck  2 pcs 2 spindles: Gildemeister • 2 pcs of grinding machines: König&Bauer

  16. Core technologies V. Max. size of Spindle speed Driven CNC Lathe Quantity Spindle Options (min -1 ) work (mm) tool Ø 1 50 EEN-320 3500 1 1 Heidenreich & Ø 1 50 4500 1 1 Harbeck FL-300 Robot Ø 32 Gildemeister Twin 32 8000 1 2 manipulator Ø 42 Gildemeister Twin 42 7000 1 2 Bar feeder Ø 250 INDEX GU 800 6000 1 1

  17. Core technologies VI. Capabilities  Raw materials: low- carbon steel, free-cutting steel, aluminium, copper (both bar and tube)  Diameters: ∅ 10 - ∅ 160  Minimum tolerance: IT7 ≤  Annual volumes: 20k - 3 000k pcs

  18. Product references - Turning Made for: Automotive industry Made for: Industial sector Annual volume: 1.300.000 pcs Annual volume: 2.000.000 pcs Made for: Electrical industry Annual volume: 10.000 pcs

  19. Quality Testing capabilities  3D measuring (2 pcs.)  3D scanning (by VT Precíziós)  Hardness test  Outline feeler  Tensile strength test  Surface roughness test  Leak test  Function test (for pumps)

  20. DfM and DfC Services Examples for retechnologisation Machined from Machined from copper cast copper profile Machined surfaces are shown in red . Benefits : - 100 sec machining time - 2 machining steps - 50% added value

  21. Assembly

  22.  20 years tradition in assembling of oil-pumps for diesel engines  we provide our customers assembly services in small to medium series  capabilities from components production to functional testing of finished products

  23. Assembled material with purchased or custom-made fasteners Tunnelterminal Multi tunnelterminal Material: Al Material: AL Annual volume: 6.000 pcs Annual volume: 10.000 pcs

  24. References

  25. Surface treatment

  26. Core technologies I. Zinc plating on steel parts  4 pcs of zinc plating lines: • 3 pcs rack plating line (acidic and alkaline bathes) • 1 pc barrel plating line  Passivation with chromium(III): • Blue passivation • Yellow passivation • Black passivation

  27. Core technologies II. Zinc plating on steel parts  Bathes: • Alkaline type bath for better metal distribution - better corrosion resistance even at the inner corners • Acidic type bath for beautiful brightness everywhere  Maximum measurements: 1.8 m x 0.85 m x 0.4 m  Corrosion resistance: up to 360 hours  Annual volume: up to 500k m 2 and 1000 tonns

  28. Product references - Zinc plating I.

  29. Product references - Zinc plating II.

  30. Core technologies III. Electroless nickel plating  Medium phosphorous content electroless nickel  Raw materials: steel  Max. measurements: 0.7 m x 0.6 m x 0.35 m or 50 kg  Nickel deposition: up to 30 μ m  Annual volumes: up to 50k m 2

  31. Product references - Electroless nickel plating

  32. Core technologies IV. Copper plating  Copper (cyanide) electroplating • on steel / copper alloys • barrel and rack plating • up to 30k m 2 per year

  33. Silver plating on copper / copper alloy parts  Bathes: • Cyanide type bathes • Maximum measurements: 0.7 m x 0.7 m x 0.2 m  Post-treatment: passivation  In barrel : 5 kg/charge  Annual volumes: 10-20k m 2 or 15-20 tons

  34. Nickel plating on copper or steel parts  Bathes: • Bright • Semi-bright  Maximum measurements: 0.9 m x 0.9 m x 0.4 m  In barrel :15 kg/charge (raw material: copper, steel)  Annual volumes: up to 40k m 2 or 2-300 tons

  35. Tin plating on copper or steel parts  Bathes: • Bright • Mat  Maximum measurements: 0,9 m x 0,9 m x 0,4 m (Only copper)  In barrel :15 kg/charge (mat) ; 5 kg/charge (bright) (Raw material: copper, steel)  Annual volumes: 40-50k m 2 or 2-300 tons

  36. Combined surfaces on copper/copper alloy parts  Copper+ Nickel bright  Copper+Tin bright  Copper/Nickel+Tin mat  Copper+Nickel+Tin mat

  37. New investment I. Combined electroplating line (2010)  Surface treatment for components of air condition compressors  Copper-, nickel-, tin- / mat tin electroplating  Raw material: copper and brass  Automatic rack plating  Annual volumes: up to 50k m 2 per year  Max. measurements: 0.9 m x 0.9 m x 0.4 m

  38. New investment II. Immersion tin coating line, dedicated for Delphi /Mahle  Surface treatment for components of air condition compressors (masked alu pistons)  Immersion tin plating with own developed technology  Raw material: aluminium alloy  Automatic rack plating  Annual volume: 13 million pistons

  39. New investment III. New electroplating line for special nickel plating (2013)  Extra solderable nickel plating for IGBT cooling plates  Mat tin plating  Raw material: copper/copper alloy  Automatic rack plating  Annual volume: 40-50k m2

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend