VIRGINIA BEACH TRANSIT EXTENSION STUDY
Page 3
plans and initiatives (Strategic Growth Areas)
industry
Page 4 Page 4
The Virginia Beach Transit Extension Study (VBTES) is examining the best transit
Birdneck Road in Virginia Beach. The study area extends from Newtown Road to the Oceanfront area on 19th Street.
– Alternative 1a: ~3 miles to the Town Center Area – Alternative 1b: 4.8 miles to the Rosemont Area – Alternative 2: 12.2 miles to the Oceanfront along the NSRR corridor (with Maintenance Facility) – Alternative 3: 13.5 miles to the Oceanfront through the Hilltop Area (with Maintenance Facility)
Page 5
Page 6
Alternative 1b:
Newtown to Rosemont (Rosemont Alternative)
Alternative 2:
Newtown to Oceanfront via NSRR ROW (NSRR Alternative)
Alternative 1a:
Newtown to Town Center (Town Center Alternative)
Alternative 3:
Newtown to Oceanfront via Laskin Road (Hilltop Alternative)
7
Page 8
VIRGINIA BEACH TRANSIT EXTENSION STUDY
Page 9
Page 10
Alternatives 1b, 2, and 3:
Newtown to Rosemont and the Oceanfront
Page 11
Alternative 1a:
Newtown to Town Center (Town Center Alternative)
Page 12
Alternative 1a:
Newtown to Town Center (Town Center Alternative)
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Alternative 1a:
Newtown to Town Center (Town Center Alternative)
TOWN CENTER ALIGNMENT ALTERNATIVE
Page 27
Page 28
Costs Contingency Escalation
Page 29
Page 30
Year IHS Global Insight Highway and Street Index ENR Construction Cost Index VBTES Rate VBTES Cost Index 2013 BASE Base Cost Plus 2014 1.4% 4.7% 4.70% 4.7% 2015 2.5% 3.4% 3.40% 8.3% 2016 2.9% 2.2% 2.90% 11.4% 2017 2.5% 2.4% 2.50% 14.2% 2018 2.2% 2.4% 2.40% 16.9% 2019 2% 2.7% 2.70% 20.1% 2020 2% 2.6% 2.60% 23.2%
Page 31
Major Project Element Contingency Track 35% Stations 30% Modifications to Maintenance Facility 30% Site Work 35% Utilities 40% Rail Systems (Traction Power, Signals) 35% Real Estate (excluding NSRR ROW) 50% Vehicles 20% Unallocated 2% of total
City (all properties already owned by the City)
Page 32
Page 33
Page 34
Soft Costs % of Construction Project Development (DEIS/Concept Design) 2.5% Engineering 12% Project Management 5% Construction Management 8% Insurance 2% Legal/Permit Fees 2% Survey/Testing/Inspection 2% System Startup 1.5%
Opinion of Probable Capital Cost Current Year* (2013) YOE* (2018) Construction Cost $ 161 $ 188
Other Project Costs Existing Tide System Improvements $ 5 $ 6 Light Rail Vehicles (4) $ 21 $ 25 Bus Vehicles (12) $ 9 $ 11 “New” Real Estate Required** $ 19 $ 24 Project Development and Engineering $ 24 $ 27 Other Soft Costs (PM/CM/Legal/Startup) $ 34 $ 39 Unallocated Contingencies $ 6 $ 7 Total Probable Capital Cost $ 279 $ 327
Page 35 Reflects Constitution Station End of Line Option – 3.1 Miles * In Millions of Dollars ** Does not include real estate purchased to date of $28M
Page 36
Project Length Capital Cost Cost per Mile VBTES LRT to Constitution Drive Virginia Beach, VA 3.1 $279 million* $90 million* Central Corridor LRT Minneapolis, MN 9.8 $956 million $97 million North Corridor LRT Houston, TX 5.28 $756 million $143 million Southeast Corridor LRT Houston, TX 6.56 $822 million $125 million Dulles Metrorail Extension Northern Virginia** 11.7 $3.1 billion $269 million
Page 37
VBTES compared to significant LRT projects under construction in FY13
* FY 13 Dollars ** Heavy Rail Project in VA
Comparison of Bus and LRT Service Costs O&M Costs in 2012 Service Levels and Dollars Virginia Beach Projected Bus and LRT Service $ 11.0 M
Virginia Beach Bus Service Costs in 2012** $ 3.0 M Expanded Bus Service for LRT $ 6.0 M Light Rail Service in Virginia Beach to Town Center $ 2.0 M
Norfolk Bus and LRT Service $ 14.2 M
Norfolk Bus Service Costs in 2012 $ 8.5 M Light Rail Service in Norfolk in 2012 $ 5.7 M
Page 38 * Not Including Paratransit Costs ** FY14 Virginia Beach local share for bus service costs is $4.4 M
Page 39
Tide Forecast (FY 2011) Actual Tide (FY 2014) Projected Norfolk (2034) Projected Virginia Beach (2034) Total Projected Tide LRT (2034) Average Weekday 2,900 5,300 7,050 2, 250 9,300 Annual Trips 870,000 1.4 million 2.8 million
Page 40
40,000 60,000 80,000 100,000 120,000 140,000 160,000 FY12 FY13 FY14 FY15
VIRGINIA BEACH TRANSIT EXTENSION STUDY
Page 41
Page 42
Page 43
Page 44
2014 2015 2016
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
DEIS Completion Update DEIS - New Alternative FTA Review/Approval of DEIS DEIS Circulation and Public Hearings Locally Preferred Alternative (LPA) LPA to HRTPO Fiscally Constrained LRTP HRT Request to Enter FTA "Project Development" Preparation of Final EIS/ROD HRT Request to Enter FTA “Engineering" Design Build FFGA/ Final Engineering /Construction Operations
Page 45
Page 46