Virginia Beach Transit Extension Study June 18, 2015 Connections - - PowerPoint PPT Presentation

virginia beach transit extension study
SMART_READER_LITE
LIVE PREVIEW

Virginia Beach Transit Extension Study June 18, 2015 Connections - - PowerPoint PPT Presentation

Agenda Item 7 Virginia Beach Transit Extension Study June 18, 2015 Connections through Strategic Growth Areas Virginia Beach Project Goals Provide additional mobility opportunities in the east-west corridor Expand multi-modal


slide-1
SLIDE 1

Virginia Beach Transit Extension Study

June 18, 2015

Agenda Item 7

slide-2
SLIDE 2

Virginia Beach Project Goals

  • Provide additional mobility opportunities in the east-west corridor
  • Expand multi-modal transportation system that supports local land use

plans and initiatives (Strategic Growth Areas)

  • Develop transportation infrastructure that supports the regional tourism

industry

Page 2 Page 2

Connections through Strategic Growth Areas

slide-3
SLIDE 3

DEIS Alignment Alternatives

Page 3

Alignment Alternative Length (miles) Alternative 1A :Town Center 3.0 Alternative 1B: Rosemont 4.8 Alternative 2: NSRR 12.2 Alternative 3: Hilltop 13.5

slide-4
SLIDE 4
  • Light Rail Transit (LRT)
  • Bus Rapid Transit (BRT)

4

DEIS Technology Alternatives

slide-5
SLIDE 5

Page 5

4 1 2 3 P&R

slide-6
SLIDE 6

VBTES Enhanced Bus System

Page 6

Tide LRT VBTES Alignment Alts. Proposed New-Realigned Bus Routes Existing HRT Bus Routes

slide-7
SLIDE 7

DEIS Formal Release

  • DEIS 45 Day Public Comment Period

– Started March 20 – Ended May 5 – Four Public Hearings held in April 2015

Page 7

slide-8
SLIDE 8

Locally Preferred Alternative (LPA)

LPA recommended by VB City Staff

– Town Center Alternative with LRT – Selected by VB City Council on May 12 – Selected by TDCHR on May 28

  • Full construction funding of $310 M identified

through City and State Funding Sources

– State Funding identified in SYIP – City Funding identified in adopted Budget

  • Request Amendment to 2034 Fiscally Constrained

LRTP to VBTES as a fully funded Construction Project

Page 8

slide-9
SLIDE 9

2014 2015 2016

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

DEIS Completion Update DEIS - New Alternative FTA Review/Approval of DEIS DEIS Circulation and Public Hearings Locally Preferred Alternative (LPA) LPA to HRTPO Fiscally Constrained LRTP Preparation of Final EIS/ROD Design Build Operations

Page 9

Schedule and Next Steps

slide-10
SLIDE 10

THANK YOU

10