Village of Kingsley WWTP Operation, Maintenance and Management Began Operation June 2005 Began Operation June 2005 First Aero-Mod System in Michigan C Continuous Flow Process ti Fl P Two Stage Extended Aeration Process Groundwater
SLIDE 2
SLIDE 3
Design Flow: 0.200 MGD Design Loading BOD5: 240 mg/l Ammonia-N: 30 mg/l Ammonia N: 30 mg/l C rrent A erage Flo 0 100 MGD Current Average Flow: 0.100 MGD Maximum: 0.123 MGD Minimum: 0.089 MGD
SLIDE 4
Influent Characteristics
- BOD5:
180 mg/l
5
- COD:
250 - 500 mg/l
- TSS:
100 – 160 mg/l TSS: 100 160 mg/l
- T. Phosphorus:
4.5 – 6.5 mg/l Ammonia N 25 46 mg/l
- Ammonia-N:
25 – 46 mg/l
- Temperature:
6 - 22° C
SLIDE 5
Effluent Permit Parameters
- TIN:
5 mg/l
- Sodium:
150 mg/l
- Chloride:
250 mg/l Chloride: 250 mg/l Monitor Well Permit Parameters Monitor Well Permit Parameters
- T. Phosphorus:
1 mg/l
SLIDE 6
SLIDE 7
SLIDE 8
SLIDE 9
SLIDE 10
SLIDE 11
Start Up Issues
- Influent BOD5 was lower than expected
5
- Process achieved complete nitrification
- Not enough BOD5 remaining to denitrify to less
Not enough BOD5 remaining to denitrify to less than 5 mg/l
SLIDE 12
- We expected we would need to add BOD5
(ethylene glycol) to the influent
- Discussed the problem with Aero-Mod Process
Engineer Todd Steinbach
- Aero-Mod came up with a fix using automatic
valve modification that alternates the first and second stage aeration g
- Aero-Mod provided the valves
- WTOS provided the labor to complete the
- WTOS provided the labor to complete the
modification
SLIDE 13
SLIDE 14
SLIDE 15
Effluent Range BOD5: <10 - 20 mg/l
5
COD: 50 - 90 mg/l TSS: 4 – 12 mg/l TSS: 4 12 mg/l
- T. Phosphorus:
0.7 – 2.0 mg/l TIN 0 2 4 5 mg/l TIN: 0.2 – 4.5 mg/l Sodium: 60 - 150 mg/l Chlorides: 110 – 220 mg/l