Vietnam Coal Sector Update to the 19th Session of the Global Methane Initiative (GMI) Coal Subcommittee 3 June, 2014 Mr. Le Xuan Hung Vinacomin - Institute of Mining Science and Technology (IMSAT) 1 Vietnam Coal Sector Update Main coal


  1. Vietnam Coal Sector Update to the 19th Session of the Global Methane Initiative (GMI) Coal Subcommittee 3 June, 2014 Mr. Le Xuan Hung Vinacomin - Institute of Mining Science and Technology (IMSAT) 1

  2. Vietnam Coal Sector Update  Main coal basin: Quang Ninh  Number of coal mines:  Open pit coal mines: About 10 mines  Underground coal mines: About 30 mines  Coal production: 40 millions tones (2014)  Coal rank: Antraxite and semi-Antraxite (90%)  Mining Method: Longwall (90%)  Supporting: Single or set of hydraulic prop (mainly)  Excavating method: Drilling and Blasting  Gas drainage system: Khe Cham coal mine 2 2

  3. Vietnam Coal Sector Update  The most gassy mines: Mao Khe, Khe Cham, Quang Hanh, Duong Huy  In-situ gas content: up to 7.5 m 3 /T  Gas emission: up to 15.5 m 3 /T.daily  Gas drainage system: 01 system at Khe Cham coal mine  Gas utilization: Not yet  Gas dilution in coal mine: Mine ventilation  Gas control: Centralized Monitoring System (30 systems)  CMM research agency: Mine Safety Center, Institute of Mining Science and Technology 3 3

  4. Methane Drainage System in Khe Cham Coal Mine (1) Recovered methane, m 3 Drilling station arrangement at ventilation roadway Drainage period: 45 days Recovered methane: 59,000 m 3 4 4

  5. Methane Drainage System in Khe Cham Coal Mine (2) Recovered methane, m 3 Drilling station arrangement at ventilation roadway No.13.1-2 and 13.1-3 longwalls Time (Day): From March 2012 Drainage period: 560 days Recovered methane: 470,000 m 3 5 5

  6. Other updated information * Khe Cham Gas drainage system - Average methane flow: 2 - 3 m3/min - Average methane concentration: 40 - 50 % * Vinacomin is planning to apply the methane drainage at Quang Hanh and Mao Khe Coal mines 6 6

  7. CMM Project Outlook  Challenges to emission reduction projects in Vietnam: – Weak coal prices – Soft carbon market – Restrictive regulatory framework – Finance is limited 7 7

  8. CMM Project Outlook (2)  Approaches to overcoming challenges – Legislation and regulation – Sponsored by an international organization (ODA project) or an international investment to utilize methane – Policies and incentives – Capacity building • Technology transfer • Training and workshops 8 8

  9. Vietnam Coal Sector Methane Action Plan  Call for international investment or an ODA project to utilize methane  Barriers: Low carbon price in the world market, price of equipment is high  Assistance Needed: budget, technological transfer and training 9 9

  10. Contact Information and Announcements  Mr. Le Xuan Hung  Vinacomin - Institute of Mining Science and Technology  Add: No. 3, Phan Dinh Giot, Thanh Xuan, Hanoi, Vietnam  Tel: +84.4.3864 5156;  Skype: hung.vimsat  Email: lehung26@gmail.com 10 10

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend