SLIDE 1 Introductions: Bill Nemser, Town Planner of Maynard Staff and CBA Landscape Architects LLC Project Schedule and Overview Community Meeting 1 Recap Design Options Community Input and Feedback Future Schedule and Closing Remarks
Veterans Memorial Park Meeting Agenda
Location: Maynard Public Library Community Meeting 2: February 25, 2016 @ 7pm
SLIDE 2 Introductions
Town of Maynard
Town Planner: Bill Nemser
CBA Landscape Architects LLC
Principal-In-Charge: Clara Batchelor Staff Landscape Designer: Jessica Choi
SLIDE 3
Project Schedule
SLIDE 4
- Meeting 1 (January 7, 2016 at 7:00 PM): Present Site Analysis and Precedents, gather community
input, and develop program wish list to guide Schematic Designs for future meetings.
- Meeting 2 (February 25, 2016 at 7:00 PM): Present Schematic Design Alternatives based on first
meeting input. Community review and discussion, with the goal of developing a final Preferred Design Plan.
- Meeting 3 (TBA): Present Definitive Design based on community discussion at Meeting 2. With
community input, discuss and clarify final design, phasing, and funding of park.
Veterans Memorial Park Project Milestones
SLIDE 5
MEETING 1 RECAP
SLIDE 6
Context + Connections
SLIDE 7
Existing Conditions
SLIDE 8
Circulation & Connections
SLIDE 9
Program
SLIDE 10
Trees & Shrubs
SLIDE 11
Slope
SLIDE 12
Existing Site Photos
SLIDE 13
Memorial Area
SLIDE 14
Performance Area
SLIDE 15
Existing Benches and the “Basin” beyond
SLIDE 16
Looking toward Nason St
SLIDE 17 Looking southwest toward “Nason St. Parcel”
Relocate utility pole?
SLIDE 18 Looking toward Summer St from “Nason St. Parcel”
Relocate utility pole?
SLIDE 19
Panoramic view from Nason St – gentle slope into the park
SLIDE 20
Park gently slopes downwards from Summer St/Nason St
SLIDE 21
“the Basin”
SLIDE 22
“the Basin”
SLIDE 23
“the Basin” at night
SLIDE 24
Electrical Power and Lighting
SLIDE 25 Holiday/Event Lighting
Holiday Lights Use this corner's trees for holiday lighting?
SLIDE 26
DESIGN OPTIONS
SLIDE 27
Option 1
SLIDE 29 Option 1 – Plan with Existing Conditions
SLIDE 30
Option 1 – Design Elements
SLIDE 31
Recurring Design Elements
SLIDE 32
Option 1 – Vignette (Before)
SLIDE 33
Option 1 – Vignette (After)
SLIDE 34
Option 2A
SLIDE 35 Option 2A – Plan
SLIDE 36 Option 2A – Plan with Existing Conditions
SLIDE 37
Option 2B
SLIDE 38 Option 2B – Plan
SLIDE 39 Option 2B – Plan with Existing Conditions
SLIDE 40
Option 2A/2B – Design Elements
SLIDE 41
Option 3
SLIDE 43 Option 3 – Plan with Existing Conditions
SLIDE 44
Option 3 – Design Elements
SLIDE 45
Option 3 – Vignette (Before)
SLIDE 46
Option 3 – Vignette (After)
SLIDE 47
Community Input And Comments
SLIDE 48 Items for Discussion:
- Memorial Area
- Stage Location and Material
- Pathways through Park
- Connection to the “Basin”
- Seating Areas/Styles
- Lighting Styles