Vertical Conveyance Design Standards
11/14/19
Vertical Conveyance Design Standards 11/14/19 Why we are here - - PowerPoint PPT Presentation
Vertical Conveyance Design Standards 11/14/19 Why we are here Vertical Conveyance Design Standards for Link Stations Today we are here to provide an update about the current design standards for elevators, escalators and stairs in
11/14/19
2
for Link Stations
update about the current design standards for elevators, escalators and stairs in future Link stations.
3
planning, design, customer experience, construction, operations
amendments issued as needed
4
also have public stairs
stations conform to this standard
always provided per code
5
chains, motors, comb plates and drive machinery
without shutting down escalator
6
elevator is provided, a second elevator or alternate accessible path must be provided at all future Link stations
accommodate wider range of mobility devices
7
those in construction, maintenance will be provided by the installer for up to five years
will be exercised monthly in the reverse direction
8
installers