Vancouver Waterfront Project
Design Challenges & Solutions
PRESENTED BY:
Rich Darland, PE Senior Civil Engineer
Vancouver Waterfront Project Design Challenges & Solutions - - PowerPoint PPT Presentation
Vancouver Waterfront Project Design Challenges & Solutions PRESENTED BY: Rich Darland, PE Senior Civil Engineer 35 Years in the Northwest Engineering & Planning Land Surveying & UAS Environmental Health & Safety History of
PRESENTED BY:
Rich Darland, PE Senior Civil Engineer
Environmental Engineering & Planning Land Surveying & UAS Health & Safety
4
Michigan Lumber Mill
Pittock & Leadbetter Lumber
Columbia River Paper Co.
Boise Cascade Paper Mill
Mill Closes
7
JUN 2007 MAR 2008 SEP 2009 JAN 2011 MID 2013
Adopted Vancouver City Center Vision CWLLC Buys Boise Cascade Property COV-CWLLC Development Agreement Access Project Rail Phase Begins (BNSF) Access Project Street Phase Begins (City Led, TIB Criteria)
8
DEC 2013 SEP 2014 JAN 2015 OCT 2015 MAR 2016
Columbia Way TIB Grant Approval Columbia Way Deep Utilities Begins (Port) Columbia Way Street & Utilities Begins (COV) Columbia Way Opens Phase I Construction Begins
M-J 2016
Park & Pier Construction Begins
Courtesy: Columbia Waterfront LLC
Subsurface Challenges
Columbia River Water Level
Road Design Considerations
Characteristics
13
14
15
18
Storm Outfalls
– Outfalls submerged in Columbia River – High water events could submerge Grant Street underpass – Provisions for pump system in high water events
23
27
Courtesy: Lioneye Aerials