TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Presented - PowerPoint PPT Presentation

Wyong Shire Council COMMUNITY PRESENTATION COMMUNITY PRESENTATION FOR TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Presented by - Lara Critchley Lara Critchley Senior Planning Engineer (Hydrology) Natural Resources 16 March


  1. Wyong Shire Council COMMUNITY PRESENTATION COMMUNITY PRESENTATION FOR TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Presented by - Lara Critchley Lara Critchley Senior Planning Engineer (Hydrology) Natural Resources 16 March 2010

  2. Wyong Shire Council Why are we here?? Wh h ?? Council is preparing a floodplain risk management C il i i fl d l i i k t plan (the Plan) for the area you live, work or socialise in in. An important part of formalising the plan is An important part of formalising the plan is Community Consultation and community input.

  3. Wyong Shire Council The study area covers all The study area covers all the areas (not just the flood prone areas) around around Tuggerah Tuggerah Lake, Budgewoi Lake and Lake Munmorah.

  4. Wyong Shire Council Glossary: Fl Flood d – relatively high stream flow which overtops the natural or artificial banks in any part of a stream river or artificial banks in any part of a stream, river, channel, estuary lake or dam, and/or and/or – local overland flooding associated with drainage before entering a watercourse, and or coastal before entering a watercourse, and or coastal inundation resulting from super elevated sea levels and or waves overtopping coastline defences excluding tsunami.

  5. Wyong Shire Council Glossary cont: Floodplain: Floodplain: - this is the area subject to inundation by floods up to and including the Probable Maximum Flood (PMF) g ( ) event. Also referred to as flood prone land. PMF: - is the largest flood that could possibly occur at a particular location, usually estimated from probable maximum precipitation

  6. Wyong Shire Council Porters Creek flooding - October 2004

  7. Wyong Shire Council Ourimbah Creek and Tuggerah Lakes flooding – June 2007

  8. Wyong Shire Council Wyong River flooding - June 2007

  9. Wyong Shire Council U b Urban flooding – Wyong town centre June 2007 fl di W t t J 2007

  10. Wyong Shire Council Flood Photos: Urban nuisance flooding - June 2007

  11. Wyong Shire Council What is a Floodplain Risk Management Plan? - a management plan developed in accordance with the principles p p and g guidelines of the NSW Floodplain p Development Manual (2005). - The plan includes information on how particular areas of floodprone land should be managed to achieve specific objectives as well as managing the existing flood risk.

  12. Wyong Shire Council Why do we need a Floodplain Risk Management y p g Plan for Tuggerah Lakes? • Reduce the social and financial costs from the risks associated with occupying the floodplain py g p • Increase the sustainable benefits of using the floodplain; and • Improve or maintain floodplain ecosystems dependent on flood inundation

  13. Wyong Shire Council Steps Involved in Formalising Floodplain Risk Steps Involved in Formalising Floodplain Risk Management Study and Plan Formation of a Floodplain Plan Adoption and Risk Management Implementation Committee Committee Floodplain Risk Management Plan Management Plan Data Collection Floodplain Risk Flood Study Management Study

  14. Wyong Shire Council Flood Study – Tuggerah Lakes catchment Flood St d T ggerah Lakes catchment • Completed in 1994; • Design flood levels for PMF, 1%, 5%, 20% and 50% AEP design storm events; • Approximately 8,700 properties are affected by flood planning level, l i l l • Approximately 2,800 properties with floor levels belo below the flood planning level. the flood planning le el

  15. Wyong Shire Council Floodplain Risk Management Study Floodplain Risk Management Study • Study for the Tuggerah Lakes area is currently being St d f th T h L k i tl b i carried out by WMAWater • Analyse all factors and risks associated with flooding • Analyse all factors and risks associated with flooding • Analyse potential risk management options

  16. Wyong Shire Council Flood Risk Management Options g p Property Modification Measures: • • Zoning Voluntary House Raising Building and Development Zoning, Voluntary House Raising, Building and Development Controls, Flood proofing Building Response Modification Measures: Response Modification Measures: • Community Awareness, Flood Prediction and Warning, Local Flood Plan, Evacuation Arrangements Flood Modification Measures: • Retarding Basins, Levees, Channel Improvements, Flood Gates Opening or dredging the Entrance channel Gates, Opening or dredging the Entrance channel

  17. Wyong Shire Council Property Modification Measures : Floor above Flood Planning Level

  18. Wyong Shire Council Property Modification Measures: Inappropriate Planning

  19. Wyong Shire Council Property Modification Measures: Voluntary house raising so the floor level is above Flood Planning Level

  20. Wyong Shire Council Flood Modification Measures: Culvert upgrades

  21. Wyong Shire Council Flood Modification Measures: Flood Levee at Maclean

  22. Wyong Shire Council How can you help? As an inhabitant of the Tuggerah Lakes area, the community has a key role in the preparation community has a key role in the preparation, implementation and success of the Floodplain Risk Management Plan. How? • By providing any information in relation to historic flood events or flooding experiences, and/or events or flooding experiences, and/or • suggestions of how Council can manage flood prone land.

  23. Wyong Shire Council What are the outcomes of the Plan? What are the outcomes of the Plan? Develop a Plan that Develop a Plan that • Reduces flood risk to the community • Increases community resilience to flood risk • Increases community resilience to flood risk • Introduce planning controls that are specific to all flood prone areas in Tuggerah Lakes area. prone areas in Tuggerah Lakes area. • Create greater community awareness that Council is actively involved with floodplain management y p g • Provide information for preparing Local Flood Plans – for SES.

  24. Wyong Shire Council Where to from here? • Final draft of plan  public exhibition for review and • Final draft of plan  public exhibition for review and comment, • Final report and plan  sent to Council for Final report and plan  sent to Council for adoption. • Adopted plan  implement recommendations, such p p p , as planning controls and construction works. • The Plan will be reviewed every 5 years

  25. Wyong Shire Council TUGGERAH LAKES FLOODPLAIN RISK TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Any Questions??? y

  26. Wyong Shire Council THANK YOU

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.