Wyong Shire Council COMMUNITY PRESENTATION COMMUNITY PRESENTATION FOR TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Presented by - Lara Critchley Lara Critchley Senior Planning Engineer (Hydrology) Natural Resources 16 March


slide-1
SLIDE 1

Wyong Shire Council

COMMUNITY PRESENTATION COMMUNITY PRESENTATION

TUGGERAH LAKES FLOODPLAIN RISK

FOR

MANAGEMENT STUDY AND PLAN

Lara Critchley

Presented by -

Lara Critchley

Senior Planning Engineer (Hydrology) Natural Resources 16 March 2010

slide-2
SLIDE 2

Wyong Shire Council

Wh h ?? Why are we here?? C il i i fl d l i i k t Council is preparing a floodplain risk management plan (the Plan) for the area you live, work or socialise in An important part of formalising the plan is

  • in. An important part of formalising the plan is

Community Consultation and community input.

slide-3
SLIDE 3

Wyong Shire Council

The study area covers all The study area covers all the areas (not just the flood prone areas) around Tuggerah around Tuggerah Lake, Budgewoi Lake and Lake Munmorah.

slide-4
SLIDE 4

Wyong Shire Council

Glossary:

Fl d Flood – relatively high stream flow which overtops the natural

  • r artificial banks in any part of a stream river
  • r artificial banks in any part of a stream, river,

channel, estuary lake or dam, and/or and/or – local overland flooding associated with drainage before entering a watercourse, and or coastal before entering a watercourse, and or coastal inundation resulting from super elevated sea levels and or waves overtopping coastline defences excluding tsunami.

slide-5
SLIDE 5

Wyong Shire Council

Glossary cont:

Floodplain: Floodplain:

  • this is the area subject to inundation by floods up to

and including the Probable Maximum Flood (PMF) g ( ) event. Also referred to as flood prone land. PMF:

  • is the largest flood that could possibly occur at a

particular location, usually estimated from probable maximum precipitation

slide-6
SLIDE 6

Wyong Shire Council

Porters Creek flooding - October 2004

slide-7
SLIDE 7

Wyong Shire Council

Ourimbah Creek and Tuggerah Lakes flooding – June 2007

slide-8
SLIDE 8

Wyong Shire Council

Wyong River flooding - June 2007

slide-9
SLIDE 9

Wyong Shire Council

U b fl di W t t J 2007 Urban flooding – Wyong town centre June 2007

slide-10
SLIDE 10

Wyong Shire Council

Flood Photos:

Urban nuisance flooding - June 2007

slide-11
SLIDE 11

Wyong Shire Council

What is a Floodplain Risk Management Plan?

  • a management plan developed in accordance with the

principles and guidelines

  • f

the NSW Floodplain p p g p Development Manual (2005).

  • The plan includes information on how particular areas
  • f floodprone land should be managed to achieve

specific objectives as well as managing the existing flood risk.

slide-12
SLIDE 12

Wyong Shire Council

Why do we need a Floodplain Risk Management y p g Plan for Tuggerah Lakes?

  • Reduce the social and financial costs from the risks

associated with occupying the floodplain py g p

  • Increase the sustainable benefits of using the floodplain;

and

  • Improve or maintain floodplain ecosystems dependent on

flood inundation

slide-13
SLIDE 13

Wyong Shire Council

Steps Involved in Formalising Floodplain Risk Steps Involved in Formalising Floodplain Risk Management Study and Plan

Formation of a Floodplain Risk Management Committee Plan Adoption and Implementation Committee Floodplain Risk Management Plan Data Collection Management Plan Flood Study Floodplain Risk Management Study

slide-14
SLIDE 14

Wyong Shire Council

Flood St d T ggerah Lakes catchment Flood Study – Tuggerah Lakes catchment

  • Completed in 1994;
  • Design flood levels for PMF, 1%, 5%, 20% and 50%

AEP design storm events;

  • Approximately 8,700 properties are affected by flood

l i l l planning level,

  • Approximately 2,800 properties with floor levels

belo the flood planning le el below the flood planning level.

slide-15
SLIDE 15

Wyong Shire Council

Floodplain Risk Management Study Floodplain Risk Management Study

St d f th T h L k i tl b i

  • Study for the Tuggerah Lakes area is currently being

carried out by WMAWater

  • Analyse all factors and risks associated with flooding
  • Analyse all factors and risks associated with flooding
  • Analyse potential risk management options
slide-16
SLIDE 16

Wyong Shire Council

Flood Risk Management Options g p

Property Modification Measures:

  • Zoning Voluntary House Raising Building and Development
  • Zoning, Voluntary House Raising, Building and Development

Controls, Flood proofing Building Response Modification Measures: Response Modification Measures:

  • Community Awareness, Flood Prediction and Warning, Local

Flood Plan, Evacuation Arrangements Flood Modification Measures:

  • Retarding Basins, Levees, Channel Improvements, Flood

Gates Opening or dredging the Entrance channel Gates, Opening or dredging the Entrance channel

slide-17
SLIDE 17

Wyong Shire Council

Property Modification Measures:

Floor above Flood Planning Level

slide-18
SLIDE 18

Wyong Shire Council

Property Modification Measures:

Inappropriate Planning

slide-19
SLIDE 19

Wyong Shire Council

Property Modification Measures:

Voluntary house raising so the floor level is above Flood Planning Level

slide-20
SLIDE 20

Wyong Shire Council

Flood Modification Measures:

Culvert upgrades

slide-21
SLIDE 21

Wyong Shire Council

Flood Modification Measures:

Flood Levee at Maclean

slide-22
SLIDE 22

Wyong Shire Council

How can you help?

As an inhabitant of the Tuggerah Lakes area, the community has a key role in the preparation community has a key role in the preparation, implementation and success of the Floodplain Risk Management Plan.

How?

  • By providing any information in relation to historic flood

events or flooding experiences, and/or events or flooding experiences, and/or

  • suggestions of how Council can manage flood prone

land.

slide-23
SLIDE 23

Wyong Shire Council

What are the outcomes of the Plan? What are the outcomes of the Plan? Develop a Plan that Develop a Plan that

  • Reduces flood risk to the community
  • Increases community resilience to flood risk
  • Increases community resilience to flood risk
  • Introduce planning controls that are specific to all flood

prone areas in Tuggerah Lakes area. prone areas in Tuggerah Lakes area.

  • Create greater community awareness that Council is

actively involved with floodplain management y p g

  • Provide information for preparing Local Flood Plans –

for SES.

slide-24
SLIDE 24

Wyong Shire Council

Where to from here?

  • Final draft of plan public exhibition for review and
  • Final draft of plan public exhibition for review and

comment,

  • Final report and plan  sent to Council for

Final report and plan  sent to Council for adoption.

  • Adopted plan  implement recommendations, such

p p p , as planning controls and construction works.

  • The Plan will be reviewed every 5 years
slide-25
SLIDE 25

Wyong Shire Council

TUGGERAH LAKES FLOODPLAIN RISK TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN

Any Questions??? y

slide-26
SLIDE 26

Wyong Shire Council

THANK YOU