To: All Those Interested in the Renovation Plan for Playground 89 at P.S. 166 Parks has made a few revisions to its plan for the playground renovation following the meeting of the Community Board 7 Parks & Environment and Youth Education


slide-1
SLIDE 1

To: All Those Interested in the Renovation Plan for Playground 89 at P.S. 166 Parks has made a few revisions to its plan for the playground renovation following the meeting of the Community Board 7 Parks & Environment and Youth Education & Libraries committees on May 22. Pursuant to the committees’ request, we met with the school principal and her staff to address her concerns. At our request, Paul Friedberg, the original playground architect, also attended the meeting. This latest plan has the support of both parties, and hopefully all others who have been interested in this project. The modifications include the following:

  • An additional 1,140 square feet of flat area in the lower level, in comparison to

the existing condition (existing plan 2240 SF; 5/22 plan 3040 SF; revised plan 3380 SF). The first step in the amphitheater has been incorporated into the flat area.

  • A straightened/shorter sloped walkway/vehicle access in the southwest corner.
  • Elimination of internal railings/fences.
  • ADA-accessible granite block on a sloped area (instead of a ramp) between the

play equipment and lower area.

  • Relocation of proposed chess pod to the upper amphitheater area.
  • An additional maze pod on northeast side of sunken area.
  • Placement of the talk tubes play feature on the existing 4' fence near the play

equipment.

  • Addition of painted games including box ball and hopscotch (“potsy”) on existing

asphalt. This revised plan will be presented at another joint meeting of the two Community Board 7 committees on Monday, June 16, at 6:30 p.m. at the CB 7

  • ffice, 250 W. 87th St., west of Broadway. The public is welcome to attend.

Steve Simon Chief of Staff - Manhattan NYC Parks See design next pages.

slide-2
SLIDE 2

NYC Parks

PLAYGROUND 89

Amphitheater Seating to Remain ADA Granite Block

MANHATTAN

Enhanced Planting w/ Additional Trees & Shrubs New 1939 World’s Fair Benches

+105.3 +105.3 +103.5 +105.3 103.6+

W E S T 8 9 T H S T R E E T

New Decorative Chalkboard Reset Granite Block in Tree Pit

5% 5% 103.5+ 5%

Maze & Chess Pods ADA Safety Surface Transition Piece Steps w/ Handrail Steps w/ Handrail Retaining Wall & Custom Steel Fence Sloped Cheek Walls Steps w/ Handrail Expanded Level Play Area w/ Maze Pattern Seat Rails Retaining / Seat Wall

5% +106.8

Previous Design, Shown on 5/22/14

Remove Curved Top Rail from Existing 4’ Chain Link Fence Seat Wall & Custom Steel Fence w/ Talk Tube

20’

slide-3
SLIDE 3

NYC Parks

PLAYGROUND 89

Amphitheater Seating to Remain ADA Granite Block

MANHATTAN

Enhanced Planting w/ Additional Trees & Shrubs New 1939 World’s Fair Benches

+105.2 +105.3 +104.4 +105.3 104.8+

W E S T 8 9 T H S T R E E T

New Decorative Chalkboard ADA Granite Block in Tree Pit

5% 5% 104.7+ 5%

Maze & Decorative Pods ADA Safety Surface Transition Piece Flush Curb Level Play Area w/ Maze Pattern, Raised and Expanded w/ All New Pavers ADA Granite Block Slope Chess Pods

+106.8

Proposed Design

Remove Curved Top Rail from Existing 4’ Chain Link Fence Seat Wall

+104.1 +104.8

Remove 2 Non-Functional End Spray Bollards

+104.2 20’

Painted Games

slide-4
SLIDE 4

NYC Parks

Perspective of Proposed Design

PLAYGROUND 89

MANHATTAN

slide-5
SLIDE 5

NYC Parks

PLAYGROUND 89

MANHATTAN

Perspective of Proposed Design

slide-6
SLIDE 6

NYC Parks

PLAYGROUND 89

MANHATTAN

Perspective of Proposed Design

slide-7
SLIDE 7

NYC Parks

PLAYGROUND 89

Existing Flat Play Areas MANHATTAN

Existing and Proposed Flat Play Areas

5% 5% 5% 5%

Smooth Flat Play Area Uneven Flat Play Area (Cobble/Earth)

4.4%

2240SF 3040SF

360SF

2270SF 3120SF

465SF

West 89th Street 5% 5% 5%

3380SF

3200SF

600SF

20’

Flat Play Areas Proposed at 5/22 CB7 Meeting Newly Proposed Flat Play Areas

slide-8
SLIDE 8

NYC Parks

PLAYGROUND 89

Existing Flat Play Areas MANHATTAN

Existing and Proposed Flat Play Areas

Smooth Flat Play Area Uneven Flat Play Area (Cobble/Earth)

West 89th Street

37’ 46’ 50’

20’

36’ 27’ 44’ Flat Play Areas Proposed at 5/22 CB7 Meeting Newly Proposed Flat Play Areas

5% 5% 5% 5% 5% 5%

slide-9
SLIDE 9

NYC Parks

PLAYGROUND 89

MANHATTAN

Existing & Proposed Sloped Transitions

Existing 40% Uneven Granite Block Slope Proposed 5% ADA Granite Block Slope

2% 5% 2% 2% 40% 2%