This image cannot currently be displayed. PILE GROUP (TOWER) - - PowerPoint PPT Presentation

This image cannot currently be displayed. PILE GROUP (TOWER) MULTI-MEDIA CAP PENETRATION RESTORATION OF CAP BELOW PILE GROUP COMPLETED FOUNDATION PILE BOOT DETAIL (BOOT SEALS MEMBRANE TO PILE WALL) Dust and Air Management Cap Before


slide-1
SLIDE 1
slide-2
SLIDE 2 This image cannot currently be displayed.
slide-3
SLIDE 3
slide-4
SLIDE 4

PILE GROUP (TOWER) MULTI-MEDIA CAP PENETRATION

slide-5
SLIDE 5

RESTORATION OF CAP BELOW PILE GROUP

slide-6
SLIDE 6

COMPLETED FOUNDATION

slide-7
SLIDE 7

PILE BOOT DETAIL

(BOOT SEALS MEMBRANE TO PILE WALL)

slide-8
SLIDE 8
slide-9
SLIDE 9

Water Spray for Dust Suppression Air Monitoring Station * There will be multiple air monitoring stations along the site perimeter and work zone during construction. * Daily Samples Lab Testing

Dust and Air Management

Excavation Zone Sump

Storm Water Diversion Berm Temporary Cover to Prevent Dust and Contact with Contaminated Soil Excavation Zone Clean Cover Soil (minimum 30 inches) Membrane

Gravel

Sump Contaminated Soil Asphalt Surface Concrete Pile Cap Concrete Slab Concrete Filled Pipe Piles Seal Membrane to Piles and Pile Caps

Cap After Construction Cap During Construction Cap Before Construction

Cap Depth Minimum 42 inches Cap Depth Minimum 54 inches

HARBOR POINT 199768 - Revised 30 SEP 2013