the goals of the early integration pathfinder exercises
play

- The goals of the early integration pathfinder exercises are - PowerPoint PPT Presentation

- The goals of the early integration pathfinder exercises are Overall goal: Ensure that when different instruments, in particular AuxTel, ComCam and Full Camera are installed on the summit TCS/OCS/DM/CCS/DAQ all work as expected - Promote


  1. - The goals of the early integration pathfinder exercises are • Overall goal: Ensure that when different instruments, in particular AuxTel, ComCam and Full Camera are installed on the summit TCS/OCS/DM/CCS/DAQ all work as expected - Promote interaction between all principal subsystem control software - Perform interface testing - Clarify and solidify those interfaces - Identify areas of deficiency and address those issues - Exercises build on the work of previous ones - Test early, test often! - A number of pathfinder exercises have been performed over the past 2 years, with more upcoming • Valuable lessons have been learned in the process, and will likely continue to be learned in the future

  2. - 1-Visit Night Control Only (Oct 9-10, 2017 @ NCSA) - DM Header Service Capability Test (Dec 12, 2017 @ Tucson) - DAQ Hardware to Support Wavefront/Guider Testing (Feb 13-14, 2018 @ Tucson) - DAQ to DM Files (Mar 1, 2018 @ Tucson) - 1-Visit Night with Images AuxTel (April 3-4, 2018 @ NCSA) - Manual Control of Multiple Physical Devices on AuxTel (June 7, 2018 @ Tucson) - FITS File Assembly at NCSA (June 14, 2018 @ NCSA) - ACCS MCM/OCS Bridge for Spectrograph Integration Test (July 17-19, 2018 @ Tucson)

  3. - Primary goal is to test software interoperability, this is aided and in some cases requires that we use the same/similar IT setup as expected on summit • A number of areas of overlap have already been identified and are being worked on - Need for common OS • Centos7 has been adopted as the standard baseline operating system, and is being used for all pathfinder activities. - Need for common installation methodology • Puppet has been selected as the software installation tool, - Goal is to use puppet for all software installs during pathfinder exercises - Need for common identity management and group definitions • Work is ongoing in partnership with NCSA to get IDM installed in Tucson using puppet - Need for common documentation and issue tracking tools • We are already using JIRA, Confluence and Magic Draw, others to follow -

  4. - Additional technologies we expect to test in future • Configuration management - Ensuring we know which versions of software from different subsystems will interoperate - Simulation environments for testing software prior to installation on summit - Automatic testing and reporting tools • Network infrastructure (IP address, virtual networks, summit/base inter-operability) • Shared file systems • Remote access technologies and cyber security - VPN, ssh, VNC (like) technologies - Access control (perhaps basd on location) • PTP time standard distribution

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.