  2. 100 % State-Owned Company ABOUT THE COMPANY 1930 since JSC «Institute Hydroproject» makes the TOP-10 companies in the world on the field of designing of hydraulic structures among commissioned The total length of all the designed canals - projects 1985 km More than 340 HPPs in 51 countries has Our company is a part of OJSC been designed "RusHydro” - the largest energy holding in Russia as per installed capacity Company provides engineering services for civil and geotechnical works for LNG project (Arctic LNG-2 with production capacity is 19.8 Mt/y by NOVATEK) The total installed capacity of hydro power plants designed by the company exceeds 91.000 MW, which is higher than the Quality management and environmental installed capacity of hydro power plants of management systems have been introduced all types in Turkey and is comparable with and applied the UK ISO 9000:2015 and ISO 14001:2015 1 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

  3. ARCTIC LNG - 2 The project of Novatek for the extraction of natural gas and for the production of liquefied natural gas on the Yamal Peninsula. The Company's proven hydrocarbon reserves by SEC standards (including a share in the reserves of joint ventures) amounted to 15,120 million barrels of oil equivalent (boe), including 2,098 billion cubic meters of gas and 164 million tons of liquid hydrocarbons. The second project of JSC "Institute Hydroproject" associated with the performance of work in harsh conditions of the north. The work performed by JSC “Institute Hydroproject”: § Collection and analysis of input data provided by the Client. Preparation of comments on FEED documents; § Execution of the construction planning design for the work on construction of GBS in a dry dock in the construction period, preparation for transportation (in terms of removal of cofferdam) and on treatment of foundation for GBS and arrangement of protection against erosion. JSC “Institute Hydroproject” | www.mhp.rushydro.ru | hydro@hydroproject.ru 2

  4. POWERED BY ABOUT MICROSEISMIC SOUNDING TECHNOLOGY 2003 Independent verification technology take-off year technology during the assessment of a promising gas field 20+ Reduction of the cost and time for exploration of a potential field together with 99.9% successfully accuracy of the results completed projects in 5 countries Ability to conduct exploration in any complicated landscape conditions, including permafrost zones 3 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

  5. POWERED BY BENEFITS DURING GAS FIELD EXPLORATION 01 Estimation of reserves quantity and obtain information about the structure where classic seismic methods are not able to provide results (for example, in the study of under screen deposits and deep channels of fluid migration) 02 Detection of increased fracture and porosity areas, including hidden under the screen, as well as obtaining 2D and 3D models of the deposit structure Location of subvertical geological 03 structures deep channels of deposit recharge The most relevant economic effect of the technology is on the stage of exploration drilling planning. The technology guaranty reduces costs of exploration drilling phase twice or more 4 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

  6. POWERED BY DEEP CHANNEL OF DEPOSIT RECHARGE EXPLORATION Result of the study - 3D model of hydrocarbon deposit structure It is discovered a new fluidic channel under the existing Astrakhan gas and condensate field 3.500 meters depth (existing field) 10.250 meters depth Unknown fluidic channel 46.600 meters depth August 2004 | Russia | 3D model of Astrakhan gas and condensate field 5 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

  7. POWERED BY SHALLOW GAS LENS SEARCH It is confirmed the known gas lens location and discover the unknown before shallow gas lens. The result was verified by drilling . Existing boreholes Known gas lens 1.000 meters depth Discovered gas lens 2.000 meters depth Microseismic sounding method Reflection seismoprospecting (industrial) 6 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

  8. POWERED BY EXPLORATION OF UNDER SCREEN DEPOSITS It is discovered a new big hydrocarbon deposit at the well known area (more than 150 years of oil production) on the 4 kms depth, which was hidden under hi- velocity screen. Surface relief Screen Discovered deposit 4.000 meters depth Discovered deposit 64.000 meters depth 8 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

  9. POWERED BY CONTACTS International Projects JSC Institute Hydroproject Department 2, Volokolamskoe Shosse, Moscow 125993 v.vasilyev@hydroproject.ru www.mhp.rushydro.ru +7 (495) 727-36-59*3043 hydro@hydroproject.ru +7 (495) 727-36-05 9 JSC Institute Hydroproject | www.mhp.rushydro.ru | hydro@hydroproject.ru

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend